Discusses IE Bulletin 79-23 Re Potential Failure of Emergency Diesel Generator Field Exciter Transformer.No Connection Exists Between Primary Winding of Transformer & Generator.Test Will Be Completed Before 800101
ML19210E223
Person / Time
Site: Maine Yankee
Issue date: 10/29/1979
From: Groce R
Maine Yankee
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-79-23, NUDOCS 7912040057
Download: ML19210E223 (1)


Text

awwt aws g:.~ R';'

[ {]Q MAIRE -

  • UARHEE MC=FC!E7GCCi? ::

TURNPIKE ROAD (RT. 9) a

$ 77 ENGINEERING OFFICE WESTBORO, MASSACHUSETTS 01581 617-366-9011

%-O October 29, 1979 WMY 79-121 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Attention:

Mr. Boyce H. Grier, Director Re fere nce s : (1) License No. DPR-36 (Docket No. 50-309)

(2)

USNRC Letter to MYAPC dated September 12, 1979 IE Bulletin No. 79-23

Dear Sir:

Subject:

Potential Failure of Emergency Diesel Generator Field Exciter Transformer As required in Reference (2), we are providing the following information:

Item 1 The circuitry of the diesel generators for Maine Yankee has been examined and it has been determined that no connection exists between the primary windings of the exciter power transformer and the neutral of the generator.

Item 2 Maine Yankee will perform the sustained full-load operation test on each diesel generator before January 1, 1980.

You will be notified of the results upon completion of testing.

We trust that you will find this information satisfactory; however, should you desire additional information, please contact us.

Very truly yours, MAINE YANKEE ATOMIC POWER COMPANY

..//,,'Ar-R. H. Croce Senior Engineer - Licensing SFU/jgh 1474 333 ae57