Summary of 791117 Meeting W/Applicant in Los Angeles,Ca Re Applicant Response to ACRS 790725 Memo to HR Denton
ML19210E153
Person / Time
Site: Atlantic Nuclear Power Plant PSEG icon.png
Issue date: 11/20/1979
From: Birkel R
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 7911300586
Download: ML19210E153 (7)


Text

Tep

[,pnM%

_,0,,

UNITED STATES y'

g NUCLEAR REGULATORY COMMISSION 3

E WASHINGTON, D. C. 20555 t

8

%,,,,, /

NOV 2 o 1979 DOCKET N0. STN 50-437 APPLICANT: OFFSH0RE POWER SYSTEMS FACILITY:

FLOATING NUCLEAR PLANTS 1-8

SUBJECT:

SUMMARY

OF MEETING HELD WITH THE ACRS SUBCOMMITTEE ON FLOATING NUCLEAR PLANTS A meeting was held with the ACRS Subcomittee on the Floating Nuclear Plant on Saturday, November 17, 1979 in Los Angeles, California. The purpose of the meeting was to discuss the applicant response to the July 25, 1979 ACRS memo-randum to H. R. Denton. The applicant response is contained in a September 14, 1979 letter to the staff with 2, staff review and evaluation of that response contained in a November 2,1979 memorandum to R. Fraley, ACRS Executive Director.

These documents are available in the Public Document Rooms. Enclosure 1 provides 4*

the presentation schedule for the meeting. An attendance list is provided in.

Since a complete transcript of the meeting is available in the Public Document Room, specific details of the meeting have not been included herein.

At the conclusion of the meeting, the Chairman (Dr. Moeller) stated that although both the staff Lnd applicant requested that the core ladle design be reviewed by the full comittee at its December 1979 meeting, the agenda for that meeting was full and could not accomodate the core ladle design review. The Chairman did indicate that the matter would be brought before the full comittee to determine if it desired any additional infomation or would schedule a meeting early in 1980.

du k. brY Ralph A. Birkel Light Water Reactors Branch No. 2 Division of Project Management

Enclosures:

1.

Presentation Schedule 2.

Attendance List ces w/ enclosures:

See next pages i

1437 339 7911300 d%

Mr. A. R. Collier President N0 2 01979 Offshore Powr Systems P. O. Box 8000 8000 Arlington Expressway Jacksonville, Florida 32211 cc: Vincent W. Camobell, Esq.

Vice President & General Counsel Offshore Pomr Systems P. O. Box 8000 8000 Arlington Expressway Jacksonville, Florida 32211 Thomas M. Daugherty, Esq.

Offshore Power Systems P. O. Box 8000 8000 Arlington Expressway Jacksonville, Florida 32211 Barton Z. Cowan, Esq.

Eckert, Seamans, Cherin & Mellott 600 Grant Street, 42nd Floor Pittsburgh, Pennsylvarif a 15219 Franklin H. Berry, Jr., Esq.

County Counse:

County of Ocean P. O. Box 757 34 Washington Street Toms River, New Jersey 08753

. Anthony Z. Roi sman, Esq.

Natural Resources Defense Council 917 15th Street, N. W.

Washington, D. C.

20005 Dr. Glenn L. Paulson Assistant Commissioner State of New Jersey Department of Environmental Protection Labor and Industry Building John Fitch Plaza Trenton, New Jersey 08625 Keith A. Onsdorff, Esq.

Mi ri am N. Span, Esq.

Assistant Deputy Public Advocates 520 East State Street Post Office Box 141 Tren, ton, New Jersey 08625 1437 340

\\

Mr. A. R. Collier NOV 2oggg cc: Sheldon J. Wolfe, Esq., Chairman Atomic Safety and Licensing Board U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Dr. David R. Schink Department of Oceanography Texas A. & M. University College Station, Texas 77840 Mr. Glenn 0. Bright Atomic Safety and Licensing Board U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Richard S. Salzman, Esq., Chairman Atanic Safety and Licensing Appeal Board U. S. Nuclear Regulatory Commission Washington, D. C.

205CS Dr. John H. Buck Atomic Safety and Licensing Appeal Board U. S. Nuclear Regulatory Comaission Washington, D. C.

20555

?

Mr. Michael C. Farrar Atomic Safety and Licensing Appeal Board U. S. Nuclear Regulatory Commission Washington, D. C.

20555 1437 34I e

Mr. A. R. Collier NOV 2 0 GP9 cc:

Mark L. First, Esq.

New Jersey State Deputy Attorney General State House Annex Trenton, New Jersey 08625 Carl Valore, Jr., Esq.

Valore, M Allister, DeBrier, Aron & Westmoreland Mainland Professional Plaza 535 Tilton Roac P. O. Box 152 Northfield, New Jersey 08225 Mr. Harold P. Abrams 9100 Amherst Avenue Margate, New Jersey 08402 Dr. Willard W. Rosenberg 8 North Runson Avenue -

Margate, New Jersey 08402 t

Fr. John Williamson 211 Forest Drive Linwood, New Jersey 08221 Harold P. Green, Esq.

Fried, Frank, Harris, Shriver and Kampelman

, Suite 1000, The Watergate 600 600 New Hampshire Avenue, N. W.

Washington, D. C.

20037 Nuclear CoorGinator

  • Office of Verchant Marine Safety Comuandant (GMMT-4)

U. S. Coast Guard Washington, D. C.

20590 Mr. Mitchell Attalla 4028 Ponce DeLeon Avenue Jacksonville, Florida 32217 Mr. Reg Crowder Jacksonville Journal P. O. Box 1949 Jacksonville, Florida 32201 1437 342

x... v... :..

~,.......

..a.

ENCLOSURE I NOV y g PRESENTATIm SCHEDULE Floating Nuclear Plant Subcomittee Meeting November 17, 1979 ks Angeles, CA PRESENTATIm APPROXIMATE TIME TIME MEETING WITH OFFSHORE PWER SYSTEMS AND THE NRC STAFF (OPEN SESSION) 1.0 SUBCCMMITTEE CHAIRMAN'S OPENING RENARKS 8:30 am 2.0 INTRODUCTORY RENARKS 2.1 NRC Staff 5 min 8:35 am 2.2 offshore Power Systems 5 min 8:45 am 3.0 TECHNICAL PRESENTATIONS 3.1 Staff Positions - NRC Staff 15 min 8:55 am Presentation w/0PS Response o Consideration Given to Use Vented Containment o Riverine and Estuarine Evaluations o Safety Versus Environmental Issues 3.2 Core Ladle Design - OPS 1 hr. 10 min 9:25 am Presentation o Description of Configuration and Structural Evaluations o Ladle Design 'Ihermal Calculations High Temperature Materials Interactions o

o Impact of Mgo Ladle on Core Melt Airborne Releases Break for Lunch 12:00 noon - 1:00 pn 3.3 Evaluation of Core Ladle - NRC 30 min 1:00 pn Staff Presentation 3.4 Space and Layout Considerations 10 min 2:00 pm Relative to Post-Accident Flexibility - OPS Presentation w/NRC Staff Response 3.5 'IMI Related Systems Considerations -

30 min 2:20 pm OPS Presentation o Total AC Power kss Evaluation o AEW system Reliability Post Accident Hydrogen Buildup

}43f bk7) o o Vented Containment Concept

...>.:. o - e:

.u a..

...~L..=.-.*

.a.

NOV 2 0 77)$

3.6 Evaluation of 'IMI Related 30 min 3:45 pm System Considerations - NRC Staff Presentation 4.0 CAUCUS 4:45 pn

- Conclusions / Remarks

- Discuss Future Meeting Echedule ADJOURNMD3T 5:00 pm Note:

(1) A maximum of 30 minutes will be allowed for receiving oral statements from members of the public if requested.

(2) 'Ihe speakers should limit their prepared presentations to the time allowed. An allowance, amounting to 100% or more of presentation time, has been made for questioning by the Subcommittee.

-l 4

1437 344 6

NOV g e tggg ENCLOSURE 2 ATTENDANCE LIST ACRS SUBCOMMITTEE MEETING NOVEMBER 17, 1979 ACRS AND STAFF D. Moeller, Chairman D. Okrent P. Shewmon H. Etherington

'W. Mathis G. Quittschreiber, Staff I. Catton, Consultant OFFSHORE POWER SYSTEMS P. B. Haga D. H. Walker C. Dotson H. J. Stumpf R. Orr

?

R. A. Cruce N. Seaborne T. Daugherty R. J. Cooney R. A. Thomas D. Aabye NRC - STAFF R. Baer R. Birkel A. Marchese W. Milstead F. Rinaldi J. Read C. Haupt R. Codell T. Pratt, Consultant, BNL D. Swanson, Consultant, Aerospace Corporation 1437 345