ML19210E143

From kanterella
Jump to navigation Jump to search
Forwards LER 79-026/03L-0
Date released: 09/24/2019 Download: ML19210E143


LER 79-026/03L-0:on 791022,during Turbine First Stage Low Pressure Calibr Procedure Qis 55-1,pressure Switch PS-2-504C Tripped Above Tech Spec Limit.Caused by Instrument Set Point Drift.Pressure Switch Recalibr
ML19253C333
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 11/16/1979
From: Robert Murray
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19253C333 (1)
Forwards LER 79-026/03L-0
ML19210E142
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 11/16/1979
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: KEPPLER J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19210E142 (1)