lM-14QS o

UNITED STATES 8

1 NUCLEAR REGULATORY COMMISSION h.;

E REGION IV o#

611 RYAN PLAZA DRIVE,SulTE 1000 k, ' /

AR LINGToN, T E XAS 76012 2 5 JUL 1979 Docket No.

99900369/79-01 I

Autcoatic Switch Company Atta:

F_r. E. R. Ehrhard President 50-56 u-,rer Road Florha:2 Park,,N. J.

07932

~

Gentlemen:

This refers to the QA Program inspection conducted by Mr. W. E. Foster of this office on July 10-13, 1979 of your faci.11ty at Florham Park, New Jersey, associated with the fabrication of solenoid valves and transfer switches and to the discussions of our findings with you and mer.5ers of your staff at the conclusion of the inspection.

This inspection was made to confirm that, in the areas inspected, your QA Program is being effectively implemented. The inspection effort is not designed to assure that unique quality requirements imposed by a customer are being implemented; nor to assure that a specific product, component or service provided by you to your customers, is of acceptable quality. As you know,-* the NRC requires each of its licensees to assume full responsibility for the quality of specific products, components or services procured from others. You should therefore not c nclude that the NRC's inspection exempts you from inspections by an Nhc licensee or his-agents nor from taking effective corrective action in response to their findings.

Areas examined and our findings are discussed in the enclosed report.

Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

During the inspection it was found that the implementation of your QA Program failed to meet certain NRC requirements The specific findings and references to the pertinent requirements are inencified in the enclosures to this letter.

Please provide ua within thirty (30) days of your receipt of this report a written statemune containing, (1) a description of steps that have been or will be. taken to correct these items, (2) a description of steps that have been or will be taken to prevent recurrence, and (3) the date your corrective actions and preventive measures were or will be completed.

1428 323 nn@*

b

e,

~

Automatic Switch Company 2

In accordance with Section 2.790 of the Commission's " Rule of Practice,"

Part 2, Title ]O, Code of Federal Regulations, a copy of this letter with enclosure and your reply, together with the enclosed inspection report will be placed in the Commission's Public Document Room. If this report contains any information that you believe to be proprietary, it is nacessary that you make a wrJtten application within thirty (30) days to this office to withhold such information from public disclosure. Any such application =ust include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

Should you have any questions 'concerning this inspection, we will be pleased to discuss them with you.

Sincerely, I

k

=r. ;,.

Uldis Potapovs, Chief Vendor Inspection Branch

Enclosures:

1.

Notice of Deviation 2.

Inspection Report No. 99900369/79-01 1428 324 i

.. ~.