ML19210E054
| ML19210E054 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak, South Texas |
| Issue date: | 11/13/1979 |
| From: | Bishop C NRC ATOMIC SAFETY & LICENSING APPEAL PANEL (ASLAP) |
| To: | |
| References | |
| NUDOCS 7911290228 | |
| Download: ML19210E054 (2) | |
Text
.
NRC PUBLIC DOCUMENT ROOM UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION e
gh ATOMIC SAFETY Ai.J LICENSING APPEAL BOARD p
~
[ hhv[
O I9 Alan S. Rosenthal, Chairman
([
Michael C. Farrar Ric7ard S. Salzman
)
m4 In the Matter of
)
)
HOUSTON LIGHTING & POWER COMPANY,
)
Docket Nos. 50-498A
_e t _a l.
)
50-499A (South Texas Project, Units 1 and 2) )
)
TEXAS UTILITIES GENERATING COMPANY,
)
Docket Nos. 50-445A
_e t _al.
)
50-446A (Comanche Peak Steam Electric
)
Station, Units 1 and 2)
)
)
ORDER November 13, 1979 The Houston Lighting and Power Company (Houston) has filed a petition for directed certification of the determina-tions underlying the Licensing Board's October 5, 1979 order in these two antitrust proceedings.
LBP-79-27, 10 NRC In that petition, Houston addresses not only the question of whether interlocutory appellate review is warranted (at pp.
4-6) but, as well, the merits of the controversy (at pp. 7-17).
The other parties should do likewise in their responses to the petition; in the event directed certification is granted, we v
4
-.)Abb b N{
7 911 C 90
will wish to move forward in our consideration of the merits without further briefing (although orai argument might be directed).
The responses are to be filed on or before December 14, 1979.
It is so ORDERED.
FOR THE APPEAL BOARD
- b. bwQ C.
Jea4 Bishop
\\
Secret to the Appeal Board S
.