ML19210D952

From kanterella
Jump to navigation Jump to search
Notice of Violation Form Insp on 790917-21
ML19210D952
Person / Time
Site: Westinghouse
Issue date: 10/16/1979
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19210D941 List:
References
70-1151-79-14, NUDOCS 7911290079
Download: ML19210D952 (1)


Text

.

6 J79 APPENDIX A NOTICE OF VIOLATION Westinghouse Electric Corporation License No. SNM-1107 Columbia Nuclear Fuel Plant Based on the NRC incpection September 17-21, 1979, certain of your activities were apparently not conducted in full compliance with NRC requirements as indi-cated below. These items have been categorized as described in correspondence to you dated December 31, 1974.

A.

As required by Condition 38 of License SNM-1107, the licensee shall perform tests, measurements, or surveys as may be necessary for him to comply with action points and limits in the license.

Contrary to the above, materials were removed from a contamination control area and placed in the clean area of the plant on or about September 20, 1979 without the necessary surveys being performed to demonstrate compliance with Condition 18 and Annex C of the license.

This is an infraction.

B.

As required by Condition 42 of License SNM-1107, by July 1, 1979 air sampling equipment shall have been installed and operating for repre-sentative sampling of air discharged from each recirculating air system.

Contrrry to the above, on September 19, 1979 two recirculating air systems were in service in the pellet area which did not have air sampling equipment installed and in operation.

This is an infraction.

1434 050 7911290 h #7h