ML19210D306

From kanterella
Jump to navigation Jump to search
Forwards LER 79-115/03L-0
Date released: 08/12/2019 Download: ML19210D306


LER 79-115/03L-0:on 791030,contact 2 of 2E41-NOO4 Actuated at Water Level Greater than Tech Specs Limit.Caused by Instrument Drift.Instrument Recalibr & Procedure HNP-2-3307 Performed Satisfactorily
ML19210D309
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 11/19/1979
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19210D309 (1)
Forwards LER 79-115/03L-0
ML19210D305
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 11/19/1979
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19210D305 (1)