ML19210D304

From kanterella
Jump to navigation Jump to search
Notifies That Several Analyses Re safety- & nonsafety-grade Sys Interaction Included in 791017 Ltr Will Not Be in TMI-1 Restart Sar.Results of Analyses Will Be Sent as Separate Rept Prior to TMI-1 Startup
ML19210D304
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 11/20/1979
From: Herbein J
METROPOLITAN EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
GQL-1441, NUDOCS 7911260280
Download: ML19210D304 (1)


Text

Metropolitan Edison Company 3 Post Office Box 480 Middletown, Pennsylvania 17057 717 944-4041 Writer's Direct Dial Number Nove=ter 20,1979 GqL 1441 Office of Nuclear Reactor Regulation Attn: Harold R. Denton, Director U. S. Nuclear Regulatory Co==ission

'a'ashington , D.C. 20555

Dear Sir:

Three Mile Island Nuclear Station, Unit 1 (TMI-1}

License No. DPR-50 Docket No. 50-289 Safety and Non-Safety Grade System Interaction Cn October 17, 1979, a letter (GQL 129h) was sent to your office which included a report on the subject issue. On various pages of this report, several analyses were addressed which referred to a response that would be included in the TMI-1 Restart Safety Analysis Report. Subsequent to sending letter GQL 129h, we have re-evaluated the nature of these analyses and determined that the results can best be submitted as a separate report. Accordingly, this report vill be sent prior to the startup of TMI-1.

Sincerely,

/ ~

, J ,

'J. G. Herbein Vice President-Nuclear Operations 1 P 0 16(>

e 5m f

b\0

'f+bl)

Metrccoltan Ec: son Company 1 Memcer of :ne General Puche Ut:!. :es System p 9112602