ML19210D304
| ML19210D304 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 11/20/1979 |
| From: | Herbein J METROPOLITAN EDISON CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| GQL-1441, NUDOCS 7911260280 | |
| Download: ML19210D304 (1) | |
Text
Metropolitan Edison Company Post Office Box 480 3
Middletown, Pennsylvania 17057 717 944-4041 Writer's Direct Dial Number Nove=ter 20,1979 GqL 1441 Office of Nuclear Reactor Regulation Attn: Harold R. Denton, Director U. S. Nuclear Regulatory Co==ission
'a'ashington, D.C.
20555
Dear Sir:
Three Mile Island Nuclear Station, Unit 1 (TMI-1}
License No. DPR-50 Docket No. 50-289 Safety and Non-Safety Grade System Interaction Cn October 17, 1979, a letter (GQL 129h) was sent to your office which included a report on the subject issue. On various pages of this report, several analyses were addressed which referred to a response that would be included in the TMI-1 Restart Safety Analysis Report. Subsequent to sending letter GQL 129h, we have re-evaluated the nature of these analyses and determined that the results can best be submitted as a separate report. Accordingly, this report vill be sent prior to the startup of TMI-1.
Sincerely,
/
~
J
'J. G. Herbein Vice President-Nuclear Operations 1 P 0 16(>
e 5m b\\0 f
'f+bl)
Metrccoltan Ec: son Company 1 Memcer of :ne General Puche Ut:!. :es System p
9112602