ML19210C986
Jump to navigation
Jump to search
| ML19210C986 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 10/04/1979 |
| From: | Goodman L DAIRYLAND POWER COOPERATIVE |
| To: | |
| Shared Package | |
| ML19210C982 | List: |
| References | |
| NUDOCS 7911200391 | |
| Download: ML19210C986 (1) | |
Text
C.n D P*D
- g'R N'T y
&N OPERATLNG DATA REPORT DOCEET NO. 50-409 DATE 10-04-79 COMPLETED BY t t_ennnMAN TELEPHONE AnA-Mo-2331 OPER ATING STATU3 S*
La Crosse BoIIIno Water Reactor
- 1. Unit Name:
0000 70-01-04 to 2400 70-30-09
- 2. Repersing Period:
- 3. Licensed Theriaal Foser tMWti:
165 65.3
- 4. Nameptate Rating (Geom MWel:
50
- 5. Desage Electncal Ratag INet MWel:
40
- 6. Maximum Dependable Capacity aGrom Mhet:
08
? Maximum Dependable Capacity INet MWel:
- 5. If Changes Occur in Capacity Ratings a ttems Number 3 Through 7) Since I ast Report. Gise Reason.
- 9. Power Level To Which Restricted.If Any INet MWes:
48 We-Net
- 10. Reasons For Restrictions.lf Any:
S'lf-VM'OSED #ESTotCT'ON DUC TO NUCLEAm tysToeweNTA-Il0N NCISE AT HIGHER PCWER LEVELS.
This Month Yr. to.Date Cumulatne 720
'4get g6.ecq
- 11. Hours In Reporting Period
- 12. Number Of Hours Reacter Was Critica!
8;7 L 1 L4eL-3 ec 7A3 ::
- 13. Reactor Reser e Shutdown Hours 0
0 L78 I4. Hours Generator On Line 521.4 431o.6 51.c37.7 0
0 79 15 Unit Reserve Shutdown Hour,
- 16. Crom Thertaal Energy Generated IMWH) 62.068 481.392 7.018.635 18.398 137.552 2.119.861 17 Grom ElectricaJ Energy Generated IMWHi 17.027 126.401 1.958.244
- 15. Net Electrical Energy Generated (MWHI 72.4 65.9 58,7
- 19. Unit Sernce Factor 72.4 65 9 58.8
- 20. Unit Avalability Facto, 49.3 40.2
_46.9
- 21. Unis capacity Factee (Using MDC Netn 47.3 38.6 45.1
- 22. Unit Capacity Factor lUsing DER Nett 27.6 13.1 6.2
- 23. Unie Forced Omtage Rate
- 24. Shutdowns Scheduled Oree Nest & Meaths aTwae. Date,and Duration of F2cht:
REFUEllNG $ HUT 00WNt MARCH 1. 1980. 6-8 VEEX$ DURAT!c'i 70-0A-10
- 25. If Shut Dwws At End Of Report Persed. Estamated Dese of Startup:
- 26. Uanss in Tees States tPrior to Ceansnercsel Operatioal:
Forecast Achwsed INITIAL CRITICALITY INITIAL ELECTRICITY
('OMMERt l4L OPE R ATION f/5)' N.uapf39L -}}