Revised Monthly Operating Rept for Sept 1979
ML19210C986
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 10/04/1979
From: Goodman L
DAIRYLAND POWER COOPERATIVE
To:
Shared Package
ML19210C982 List:
References
NUDOCS 7911200391
Download: ML19210C986 (1)


Text

C.n D P*D

  • g'R N'T y

&N OPERATLNG DATA REPORT DOCEET NO. 50-409 DATE 10-04-79 COMPLETED BY t t_ennnMAN TELEPHONE AnA-Mo-2331 OPER ATING STATU3 S*

La Crosse BoIIIno Water Reactor

1. Unit Name:

0000 70-01-04 to 2400 70-30-09

2. Repersing Period:
3. Licensed Theriaal Foser tMWti:

165 65.3

4. Nameptate Rating (Geom MWel:

50

5. Desage Electncal Ratag INet MWel:

40

6. Maximum Dependable Capacity aGrom Mhet:

08

? Maximum Dependable Capacity INet MWel:

5. If Changes Occur in Capacity Ratings a ttems Number 3 Through 7) Since I ast Report. Gise Reason.
9. Power Level To Which Restricted.If Any INet MWes:

48 We-Net

10. Reasons For Restrictions.lf Any:

S'lf-VM'OSED #ESTotCT'ON DUC TO NUCLEAm tysToeweNTA-Il0N NCISE AT HIGHER PCWER LEVELS.

This Month Yr. to.Date Cumulatne 720

'4get g6.ecq

11. Hours In Reporting Period
12. Number Of Hours Reacter Was Critica!

8;7 L 1 L4eL-3 ec 7A3 ::

13. Reactor Reser e Shutdown Hours 0

0 L78 I4. Hours Generator On Line 521.4 431o.6 51.c37.7 0

0 79 15 Unit Reserve Shutdown Hour,

16. Crom Thertaal Energy Generated IMWH) 62.068 481.392 7.018.635 18.398 137.552 2.119.861 17 Grom ElectricaJ Energy Generated IMWHi 17.027 126.401 1.958.244
15. Net Electrical Energy Generated (MWHI 72.4 65.9 58,7
19. Unit Sernce Factor 72.4 65 9 58.8
20. Unit Avalability Facto, 49.3 40.2

_46.9

21. Unis capacity Factee (Using MDC Netn 47.3 38.6 45.1
22. Unit Capacity Factor lUsing DER Nett 27.6 13.1 6.2
23. Unie Forced Omtage Rate
24. Shutdowns Scheduled Oree Nest & Meaths aTwae. Date,and Duration of F2cht:

REFUEllNG $ HUT 00WNt MARCH 1. 1980. 6-8 VEEX$ DURAT!c'i 70-0A-10

25. If Shut Dwws At End Of Report Persed. Estamated Dese of Startup:
26. Uanss in Tees States tPrior to Ceansnercsel Operatioal:

Forecast Achwsed INITIAL CRITICALITY INITIAL ELECTRICITY

('OMMERt l4L OPE R ATION f/5)' N.uapf39L -}}