ML19210C960

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Oct 1979
ML19210C960
Person / Time
Site: Millstone 
Issue date: 11/14/1979
From: Opeka J
NORTHEAST UTILITIES
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
References
MP-2-4193, NUDOCS 7911200374
Download: ML19210C960 (1)


Text

.1 IMrHEAST IFFILITIES 4 n c o 4, w..c = w.cr v.

P O BOX 270 NNSS N$[eI:bINE.'.",,

HAATFORD. CONNECTICUT 06101 5bh? ~555::::

L c

a November 14, 1979 MP-2 4193 Director Office of Management Infonnation and Program Control U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Reference:

Facility Operating License No. DPR-65 Docket No. 50-336

Dear Sir:

This letter is forwarded to provide the report of operating and shutdown experience relating to Millstone Unit 2 for the Month of October in accordance with Appendix A Technical Specifications, Section 6.9.f.3.

One additional copy of the report is enclosed.

Yours tru'y,

. F. Opeka Station Superintendent Millstone Nuclear Power Station JF0/GH/kat cc: Director, Office of Inspection and Enforcement, Region 1 Director, Office of Inspection and Enforcement, Washington, D.C. (10)oo8 17c1 g' / f: 5 t /// 394 { 7911200 ?'}}