ML19210C956
| ML19210C956 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 11/13/1979 |
| From: | Opeka J NORTHEAST UTILITIES |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML19210C957 | List: |
| References | |
| MP-1-1342, NUDOCS 7911200371 | |
| Download: ML19210C956 (1) | |
Text
s s.
NOltTHEAST IFFILFFIES P O. 00X 270 NN.I[M[i
$.c :5.*av HARTFORD CONNECTICUT 06101
?
- v., 4 ci. ra.m kr (203) m911
~ w.w N
L A l UT ~ ', l,"ll-lll.?
November 13, 1979 MP 1342 Director Office of Management Information and Program Control V. S. Nuclear Regulatory Commission Washington, D. C.
20555
Reference:
Provisional License DPR-21 Docket No. 50-245
Dear Sir:
In accordance with Millstone Unit 1 Technical Specification 6.9.1.6, the following monthly operating data report for Millstone Unit 1 is enclosed. One additional copy of the report is enclosed.
Very truly yours, J. F. Opeka Station Superintendent Millstone Nuclear Power Statior.
JF0/RHY/kat
Enclosures:
(5) cc:
Director, Office of Inspection and Enforcement, Region I Director, Office of Inspection and Enforcement, Washington, D. C.
(10) goos s
67 356
///
39\\
% 7911200 t