ML19210C707
| ML19210C707 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 11/13/1979 |
| From: | Roe L TOLEDO EDISON CO. |
| To: | Reid R Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7911190450 | |
| Download: ML19210C707 (1) | |
Text
TOLEDO EDISON Docket No. 50-346 LOWELL E. ACE m........
- '"[*l*' l**"*
License No. NPF-3 l[3
.]
Serial No. 557 November 13, 1979 Director of Nuclear Reactor Regulation Attp:
Mr. Robert W. Reid, Chief Operating Reactors Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Reid:
This letter is in response to your letter dated September 27, 1979 (Log No. 444) requesting a commitment be made by Toledo Edison to implement a valve qualification program for the containment purge and vent valves utilized at Davis-Besse Nuclear Power Station Unit 1.
Toledo Edison is presently pursuing the analytical method to verify valve operability. This analysis is expected to be performed by the valve manufacturer in accordance with the guidelines stated in your September 27, 1979 letter.
In discussions with the valve vendor it is Toledo Edison's understanding that the lead time for such an analysis is approximately 30 weeks.
The progress of this program will be monitored and expedited when possible.
Very truly yours, 1
na/lp# a wrr~
LER:TEH dh a/4 cc: Darrell G. Eisenhut Acting Director, Division of Operating Reactors gD\\
0 339 THE TCLEDO EDISCN COMPANY EDISON PLAZA 300 MACISON AVENUE TCLECO CH!O 43552 7911190h