ML19210C475

From kanterella
Jump to navigation Jump to search
Forwards LER 79-099/03L-0
Date released: 08/12/2019 Download: ML19210C475


LER 79-099/03L-0:on 791008,during Boron Injection Heat Trace Test,Unit Failed to Achieve 105 F Temp at One Point on Sys Heat Trace Line.Caused by Sys Design Deficiencies.Test ST 5011.01 Performed Successfully on 791009
ML19210C479
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/01/1979
From: Caba E
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19210C479 (2)
Forwards LER 79-099/03L-0
ML19210C473
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/01/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19210C473 (1)