ML19210C470

From kanterella
Jump to navigation Jump to search
Submits Commitment to Comply W/Sections 3.11.1.2,3.11.2.2, 2.11.2.3 & 3.11.2.5 of Radiological Effluent Tech Specs by 791201
ML19210C470
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/08/1979
From: Clayton F
ALABAMA POWER CO.
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 7911140314
Download: ML19210C470 (1)


Text

Alabama Power Company 600 North 18th Street Post Office Box 2641 -

Birmingham, Alabama 35291

  • Telephone 205 323-5341 h k Lb '#,' ,0;2t AlabamaPower tre swem em:rc sys:em Novenber 8,1979 Docket Fcs. 50-348 50-364 Director of Nuclear Reactor Pegulation U. S. Nuclear Regulatory Ox mtssion -

Washington, D. C. 20555 Gentlenen:

Re: William P. Gamn11's letter to All Power Reactor Licensees, dated 9/17/79.

The referenced letter roted that compliance with 40CFR190 will be required on Decenber 1,1979. The letter indicated that Alahm Powar OTipany will be required to assure sich ccrnpliance.

It also noted that a ccmnitnent to the provisions of the Radin-logical Effluent Technical Specifications is an acceptable method for denonstration of conformance.

Alnhama Power Canpany cannits to the following sections of the Farley RETS, subnitted to the NRC via letter of October 10, 1979: 3.11.1.2, 3.11.2.2, 3.11.2.3 and 3.11.2.5.

If you have any questions, please advise.

Yours very truly, F. L. Clayton, Jr.

FICjr/TNF/mnb cc: Mr. R. A. Thcmas Mr. G. F. Trewbridge 1321 301 A oo9 s/s

//o 7911140