05000338/LER-1979-140-03, /03L-0:on 791013,after Condensate & Feedwater Pumps Secured for Refueling,Containment Isolation Check Valve 1-FW-111 Be Stuck Open.Cause Unknown.Valve Will Be Disassembled & Repaired During Current Outage

From kanterella
(Redirected from ML19210C433)
Jump to navigation Jump to search
/03L-0:on 791013,after Condensate & Feedwater Pumps Secured for Refueling,Containment Isolation Check Valve 1-FW-111 Be Stuck Open.Cause Unknown.Valve Will Be Disassembled & Repaired During Current Outage
ML19210C433
Person / Time
Site: North Anna Dominion icon.png
Issue date: 11/12/1979
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19210C432 List:
References
LER-79-140-03L, LER-79-140-3L, NUDOCS 7911140243
Download: ML19210C433 (2)


LER-1979-140, /03L-0:on 791013,after Condensate & Feedwater Pumps Secured for Refueling,Containment Isolation Check Valve 1-FW-111 Be Stuck Open.Cause Unknown.Valve Will Be Disassembled & Repaired During Current Outage
Event date:
Report date:
3381979140R03 - NRC Website

text

uCEisSdd Ev EN i nErOrii CONTROL BLOCK:

l l

l l

l (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) l V l A l N l A l S l1 l@l 0l 0l -l 0 l 0 l 0 l 0 l 0 l-l 0 l 0 l@l4 l1 1

1 l1 l@l l

l@

o i

7 8 9 LICENSEE CODE 14 13 LICEtJSE NUMBEH 25 26 LICENSE TYPE JO bl LAI 58 CON'T

,"j]"y l L l@l 0 l 5 l0 l0 l0 l3 l3 l8 l@l1 011 l3 l 719 l@l i i li l9 17 h l@

o i

7 3

60 61 DOCKET NUMSER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROB ABLE CONSEQUENCES h

&LLJ l After the condensate and feedwater pumps were secured for refueling, containment i

isolation check valve 1-FW-ill was observed to be partially stuck open as evidenced l

O 3

lby back leakage from "C" steam generator to the feedwater heaters. The health and I

0

safety of the general public were not affected by this event.

Reportable pursur.. to l

o 3

T.S. 6.9.1.9.b.

l O

3 0

7 l

l 0

8 l

l 80 7

8 9 bE CC E S3 0 E COVPONE NT CODE SUSCODE SU E

l c l H l@ lE l@ l R l@ IV l A lL IV IE lX l@ LC_j@ (Lj @

o 9

7 8

9 10 11 12 13 18 19 20 SEQUE NTI AL OCCURRENCE REPORT REVISION LE R RO EVENT YEAR REPORT NO.

CCCE TYPE NO.

O17,RElg l217l 9l l-l l11410j 1/i l 013 l Ll

[ --j l0 l u

22 23 24 26 27 28 23 30 31 32 T K N A T ON O PL NT

.t TH HOURS 22 S B IT D FOf 1 B.

5 PPLIE VAN FA TURER I X l@lD l@

l Z]@

l Z l@

l 0 l 0 l 010 l lY l@

l N ]@

[Al@

lC 2l5[5l@

33 34 35 36 3/

40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS l The cause for the check valve stit'<ing open is not known at this time. The valve was l

i O

[i li l l radiographed but tne results were unsuccessful due to the thickness of the valve body.

I The valve will be disassembled and repaired as determined necessary during the current l i

2 l outage.

l 3

i 4

1 1

7 8 9 80 ST 5

% POWER OTHER STATUS ISCOV RY DISCOVERY DESCRIPTION LtLj@ l 0101 nl@l ra l

[L.j@l onaratnr nhwrvatinn l

i s

' JTIVITY CC TNT WOUNTOhCTIVITY @ I LOCATION OF RELEASE @

RELEASED OF RELEASE fi e

LLl@ Lzl@l I

rm I

rm 7

8 9 10 11 44 45 So PERSCNNEL EXPCSURES NUVBER

.YPE DE SCRIPTION 1010 Ol@lzl@lNA l

i 2

2

,ERSONNabu'R,ES oESCR,PTiON@

7%

/pg NUven 7

1010101@l NA l

i a

7 8 9 11 12 80 LOSS OF OR OAMAGE TO FACILITY Q TYPE

DESCRIPTION

N/

[i 9

l Z l@l NA l

7 8 9 10 80 PTiON O 7911140 g Q NRC usE CNa iSSU OESCR:

17 I o l [ Jds81 NA I

IIIIIi III i lI 7

8 9 10 68 69 S0 5 W. R. Cartwright 701-894-5151 psoye.

N A*.1E CF PPE P AP E R

Virginia Electric and Pcwer Company fiorth Anna Power Station, Unit #1

Attachment:

Page 1 of 1 Docket tio. 50-338 Report flo. LER 79-140/03L-0

Description of Event

On October 13, 1979, with the unit in refueling mode, containment isolation check valve 1-FN-lll was observed to be partially stuck open as evidenced by back leakaSe from "C" steam generator to the feedwater heaters when the condensate and feedwater pumps were secured. The inoperability of containment isolation valve 1-FW-lll is contrary to T.S. 3.6.3.1 and reportable pursuant to T.S. 6.9.1.9.b.

Probable Consequences of Occurrence The health and safety of the general public were not affected because the check valve was found inoperable while the unit was in a safe shutdown condition and will be restored to operable status prior to resuming operation.

There are no generic implications associated with this event.

Cause of Occurrence The exact cc.use for 1-FW-lli sticking open is not known at this time.

Immediate Corrective Action

The valve was radiographed but the results of the examination were unsuccessful because of the thickness of the valve body.

Scheduled Corrective Action The check valve will be disassembled and repaired as necessary during the current refueling outage.

Actions Taken to Prevent Recurrence flo further actions are required.

' " 9 280