Text
hg 30Chet,_.,e rh ID R *.
W;
/
Docket tos. 50-239/320 A. Scmtencer, Chief, LUR 2-3, L SPECI AL REVIE'.i ASSIZ".E:iT, THREE TiILE ISLRID.iUCLEAR STATIO.1, UNITS 1 : 2, REVIEU OF I?;00STRIAL SECURITY PL%i Licensee: Metroi:olitan Edison Co.
Licensing Stage:
Post-CL Cognizant Project Branch and LPM:
LWR 2-3, R. Bernero Technical Review Branc5 Involved:
L:0SS Review Status: Additional Infomation Requested The attacned draft letter contains information relative to updating of the subject Industrial Security Pian for transmittal to the licensee.
aM g w#
a
- s. we R. Wayne Houston, Chief Operational Safety Branch Directorate of Licensing
Enclosure:
As stated cc:
S. Hanauer J. Hendrie A. Giantusso W. Mcdonald V. Stello R. Bernero V.. tore 1596 37 C. Van tiiel DISTRIBUTION:
Docket, L Rdg., OBB Rdg.
h L:0SB -
L :0StT.
gj; o,,,c,
~
~~
CRVanMiel:ld RWNystoF s 3/lT/74 3/;i/74 a.n s-r-Anc.u. im. su racu oua e..
1911,.
5/V F
~
Dock,et fics. 50-289/320 Gentlemen:
In June 1973, the Commission published Regulatory Guide 1.17, " Protection of liuclear Power Plants Against Industrial Sabotage", and on flovember 6, 1973, adopted amendments to its regulations in 10 CFR Parts 50, 70, and 73 The new to strengthen the physical protection of plants and materials.
rules required, in part, that licensees authorized to operate production and utilization facilities submit a physical security plan to the Commission by January 7,1974, if such a plan, as described in the new 10CFR50.34(c),
had not been submitted by llovember 6, 1973.
Although the docket record for your facility reflects submittal and review by the staff of a security plan, we consider it necessary at this time that you re-evaluate your security plan with respect to the regulations and the regulatory position set forth in Reg'ilatory Guide 1.17.
In our letter dated March 6,1974, on the Unit 2 docket, we transmitted to you our request for additional information along with our position The staff considers that all nuclear power plants on certain matters.
licensed pursuant to 10CFR50 should have or upgrade, if necessary, physical security plans to conform at minimum, with Regulatory Guide 1.17.
1596 38 You are asked, therefore, to submit within 30 days of receipt of this letter, the results of your re-evaluation, which should include, if necessary, amendments to your security plan on the docket record, or a revised plan, in sufficient detail to permit the staff to detemine its conformance with Regulatory Guide 1.17.
The information to be submitted should also identify specific features of your plan which'have not yet been implemented, if any, or cannot be implemented by April 15,19 74, and
2-provide best estimates of the date or dates when such implementation is expected.
If any of these dates extend beyond June 15,1974, the information provided should include a description of interim measures-to be taken to provide compensating protection for such temporary peri ods.'
Three copies of your response should be submitted.
Your letter of transmittal should request that details of your security plan be withheld from public disclosure pursuant to Section 2.790 of 10 CFR Part 2.
Sincerely, 1596 339 O