Notice of Granting of Interim Relief from ASME Section XI Inservice Testing Requirements
ML19210C070
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 10/26/1979
From: Schwencer A
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19210C069 List:
References
NUDOCS 7911130228
Download: ML19210C070 (2)


Text

.

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET N0. 50-295 COMMONWEALTH EDIS0N COMPANY NOTICE OF GRANTING OF INTERIM RELIEF FROM ASME SECTION XI INSERVICE TESTING REQUIREMENTS

. The U. S. Nuclear Regulatory Commission (the Commission) has granted relief from certain requirements of the ASME Code,Section XI, " Rules for Inservice Inspection of Nuclear Power Plant Components" to the Zion Station Unit No.1 (the facility) located in Zion, Illinois. The advance relief relates to a part of the second the inservice inspection program for the facility. The ASME Code requirements are incorporated by reference into the Commission?s rules and regulations in 10 CFR Part 50.

The interim relief is effective as of its date of issuance.

The advance reli.ef is granted on an interim basis, pending completion of our detailed review from those inservice inspection requirements of the ASME Code that the licensee has determined to be impractical within the limitations of design, geometry and materials of construction of components, because compliance would result in hardships or unusual difficulties without a compensating increase in the level of quality or safety.

The request for relief complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission l.s rules and regulations.

The Commission has mde appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, 9hich are set forth in the letter granting relief.

Prior public notice of this action was not required since the granting of this relief from ASME Code requirements does not involve a significant hazards consideration.

] } j 9 34()

S 7911130 M

7590-01 The Commission has determined that the granting of this relief will not result in any significant environmental impact and that pursuant to 10 CFR 51.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with this action.

For further details with res;act to this action, see (1) the request for relief dated October 1, 1979, (2) the June 28, 1979 revised program, and (3) the Commission's letter to the licensee dated October 26,

1979.

These items are available for public inspection at the Commission's Puolic Document Room, 1717 H Street, N.W., Washington, D. C. and at the Zion-Benton Public Library District, 2600 Emmaus Avenue, Zion, Illinois 60099. A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D.C.

20555, Attention: Director, Division of Operating Reactors.

Dated at Bethesda, Maryland this 26th day of 0ctober,1979.

FOR THE NUCLEAR REGULATORY COMMISSION

'W#

A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors 1319 347