Forwards Proposed Permanent Solution to Small Break LOCA Per 780427 & 0505 Ltrs
ML19210B871
Person / Time
Site: Crane  Constellation icon.png
Issue date: 07/24/1978
From: Herbein J
Metropolitan Edison Co
To: Varga S, Reid R
Office of Nuclear Reactor Regulation
References
GQL-1254, NUDOCS 7911120567
Download: ML19210B871 (5)


Text

$$

5 W

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RID' C DISTRIBUTION FOR INCOMING MATERIAL h0'">/320 REC: REID R W ORG: HEREEIN d G DOCDATE: 07/' N NRC METROPOL EDISON DATE RCV 07/28/7S w

/

DOCTYPE: LETTER NOTARIZED: NO COPIES PECEIVED

SUBJECT:

LTR 1 ENCL 1 FORWARDING APPLICANT"S PROPOSED PERMANENT SOLUTION TO SMALL BREAK LOCA FOR UNITS 1 & 2 INVOLVING MODIFICATION TO THE HIGH PRESSURE INJECTION SYSTEM.

PLANT NAME: THREE MILE ISLAND - UNIT 1 REVIEWER INITI AL:

XJM THREE MILE ISLAND -- UNIT 2 DISTRIBUTER INITIAL:

                                  • DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ******************

GENERAL DISTRIBUTION FOR AFTER ISSUONCE OF OPERATING LICENSE.

(DISTRISUTION CODE AOO1)

FOR ACTION:

BR CHIEF ORG#4 BC**W/7 ENCL INTERNAL:

[

  • W/ ENCL NRC PDR**W/ ENCL ra p:m/2 ENCL OELD**LTR ONLY HANAGER**W/ ENCL CORE PERFORMANCE ER**W/ ENCL AD FOR SYS & PROJ**W/ ENCL ENGINEERING ER**W/ ENCL REACTOR SAFETY GR**W/ ENCL PLANT SYSTEMS BR**W/ ENCL EEB**W/ ENCL EFFLUENT TREAT SYS**W/ ENCL J.

MCGOUGH**W/ ENCL VMGA tu (Ench EXTERNAL:

LPDR'S II 64 M& W / 8 ^< '

HARRISBURG, PA**W/ ENCL

.iER.s4c t off g TERA **W/ ENCL NSIC**W/ ENCL ACRS CAT B**W/16 ENCL

_. v LTR 9 Y2.-

DISTRIEUTION:

4+> -

ENCL &

CONTROL NER:

7S2090027 SIZE: 1P+0P m

THE END

                                                                • +++

k N 7

adM2 0

    • i'., 2 !

i i y

y

(*i(

e

- w. 6.. Au4 4

%3a.4 J

$ m m iss METROPOLIFAN EDISON COMPANY POST OFFICE BOX 542 READING, PENNSYLVANI A 19603 TELEPHONE 215 - 929-2601 July 2h, 1978 GQL 125h Director of Nuclear Reactor Regulation Attn:

R. W. Reid, Chief Operating Reactors Branch No. h U. S. Nuclear Regulatory Co==ission Washington, D. C.

20555 Director of Nuclear Reactor Regulation Attn:

S. A. Varga, Chief Light Water Reactors Branch No. 4 U. S. Nuclear Regulatory Cc==ission Washington, D. C.

20555 Gentlemen:

Three Mile Island Nuclear Station TMI-1 DPR-50, Docket No. 50-289 TMI-2 DPR-73, Docket No. 50-320 In our letters of April 27, 1978 (GQL 0778) and May 5, 1978 (GQL 085k), we indicated that we vould propose a permanent solution to the S=all 3reak LOCA problem for TMI-1 and TMI-2 respectively. Although the dates which ve com-mitted to for submitting this solution were not the same for both units (TMI July 24,1978; TMI August 5,1978), enclosed please find a description of our proposed permanent solution applicable to both units for the Small 3reak LOCA problem.

Your most expeditious review is requested as we wish to make this =cdification during our next refueling outage and we must begin procurement as scen as pos-sible. Should you have any questions concerning cur proposed solutien to the Small Break LOCA problems, we are available to meet with you and discuss this issue.

Sincerely, J. G. Herbein Vice President-Generation JGH:RAL:ejg kg) cc: Harley Silver, NRC 6 Gerry Zvetzig, NRC .) / v dC Enclosure Q DI h 6 c co.,- %e3l _.,73e

R0 POSED PERMANENT SOLUTION. SMALL BREAK LOCA CONCERN (Applicable to TMI-l and TMI-2) The proposed permanent solution to Small Break LOCA concerns for TMI Units 1 and 2 involves a modification to the High Pressure Injection (HPI) System. With this modification installed, reliance on operator action to mitigate the ef fects of a Small Break LOCA will be decreased. The modifications to the HPI System mentioned above will allow an operator to perform the manual operations outlined in our letters of April 27, 1978 (TMI-1) and May 5,1978 (TMI-2) remotely from the control room, with the exception of opening the makeup pump discharge cross connect valve. Plant operation will occur with this valve in the open position. Consequently, this valve will already be open should the postulated accident occur. As outlined in the attached sketch, the proposed HPI System modifications will allow each HPI isolation valve to be connected to both the red and green (Channel 1 and 2) power. Each channel will contain redundant contactors between the breakers at the motor control center, and the valve itself. The contactors on Channel 1 will be interlocked by a Kirk Key Interlock in the Control Room, with the contactors on Channel 2. This interlock will preclude closing the contactors on both channels at the same time, and will provide at least two (2) points of separation between the two channels at all times. Should the postulated Small Break LOCA occur, the operator will receive a safety injection alarm in the Control Room within sixty (60) seconds of the break occurring. Our procedures will (if this proposal is approved), require the operator to, upon receipt of the alarm, verify flow through all four (4) safety injection valves. If the operator identifies "no flow" in any of the injection legs, he will proceed to manually transfer power (using the Kirk Key Interlock) to the valve (s) with "no flow" indication. This will assure flow through all four (4) injection legs, thus meeting the acceptance criteria to alleviate the postulated Small Break LOCA. As discussed in previous submittals, the postulated small break problem will not occur unless the small break is accompanied by a loss of off-site power. In our situation, the operator will perform the above action regardless of a loss of off-site power, with no degradation of the ability to mitigate the accident. By letter (J. Taylor to S. Varga) dated July 18, 1978, Babcock & Wilcox (B&W) has submitted additional ECCS Small Break Analyses for B&W 177 Fuel Assembly Lowered Loop NSS (2772 Mw). These analyses incorporated a step input of water to the Reactor Coolant System at ten (10) minutes and result in a conservative maximum peak cladding temperature of 1092 F for the worst case break. Based on this and other analyses which B&W has performed (assuming a step input of water to the RCS in fif teen (15) minutes instead of ten (10) minutes), the maximum peak clad temperatures for the worst case break size (utilizing the 2772 Mw analysis) is about 20000F (still below the 2200 F Criteria of 10 CFR 50.46). We therefore, conclude that a step input of water (initiation of flow through all four injection legs) at fif teen (15) minutes is acceptably within the requirements of 10 CFR 50.46. C O J / V

. As stated in Nureg-0h60, operator action may be assumed at the end of ten (10) minutes if 1) adequate information is displayed, and 2)the actions are very simple in nature. This is consistent with past licensing actions and is ap-propriate for those actions which are simple and based on the display of adequate information to the operator. As discussed earlier, the operator receives a safety injection signal alarm (audible and visual alarm) in the Control Room in less than sixty (60) seconds from the initiation of the postu-lated break. At that time, he has four (h) flow indicators available. Based on whether his indicators show adequate flow or "no flow", he =ust turn two (2) key controlled switches (located side by side) for each valve with a "no flow" indication. Under single failure criteria, the maxinum number of valves he would have to transfer would be '.vo (2) or a total of four (h) switches, all located on the same panel. We, therefore, conclude that adequate information is available to the operator and the actions he must perform are few and very simple in nature. We further conclude that ten (10) minutes to perform these actions is a reasonable operator delay time and would successfully align the HPI system to mitigate any size postulated LOCA with substantial margin to 10 CFR 50.h6 limits. However, as stated earlier, we do have analysis that indicates that at least fifteen (15) minutes are available (for the worst case break) before operator action is required. A fifteen (15) minute operator delay time vill also suc-cessfully align the HPI system to mitigate any size postulated LOCA with margin to 10 CFR 50.h6 limits. We req.uest your approval of this proposed emicept and approval of an operator response delay time in the range of ten (10)to fifteen (15) minutes inclusive. Upon receiving your approval of the above proposed permanent solution, ve vill authorize B&W to perform analyses which vill be totally in conformance with 10 CFR 50.h6, documenting that our proposed modifications vill produce maximum peak cladding temperatures below 10 CFR 50.46 limits (ausu=ing an operator delay time consistent with the minimwn delay time you find acceptable).

  • 7"

-c n ibiU l'3

Kir K K ey o e o e ---O Inf er loc K r---0 in cont ro l I d l Mcc ch

  • 2 Room M CC Ch l

l i I I I s l NC ) NC I 1 I I no NC 1 l_ _ _ __ 4 s s s C NC QQ O MU V lb

  • ai

+.se.g a e e ger me}}