Similar Documents at Fermi |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N4261999-10-25025 October 1999 Forwards Amend 17 to License DPR-9 & Safety Evaluation. Amend Revises TS by Deleting SR D.3.c,which Required Weekly Observation of Nitrogen Cover Gas Pressure within Sodium Storage Tanks Located in Sodium Building NRC-99-0085, Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl1999-10-22022 October 1999 Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl NRC-99-0094, Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed1999-10-22022 October 1999 Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed ML20217P1661999-10-21021 October 1999 Forwards Insp Rept 50-341/99-17 on 990927-1005.No Violations Noted ML20217M0771999-10-19019 October 1999 Confirms Discussion Between GL Shear,M Mitchell,E Kosky, D Williams,B Rumins,D Harmon & W Rutenberg in Public Meeting on 990923.Purpose of Meeting Was to Discuss Current Status RP Program at Enrico Fermi 2 ML20217N9231999-10-15015 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 40 ML20217E5671999-10-14014 October 1999 First Partial Response to FOIA Request for Documents.Records in App a Already Available in Pdr.App B Records Encl & Being Released in Entirety NRC-99-0087, Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons1999-10-12012 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons NRC-99-0083, Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-10-0707 October 1999 Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal ML20217D5331999-10-0707 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 39 ML20217F5931999-10-0707 October 1999 Forwards Insp Rept 50-341/99-11 on 990724-0908.Two Violations Re Failure to Follow Procedures While Sampling Standby Liquid Control Tank & Wear Dosimetry Properly Being Treated as Noncited Violations ML20217B8261999-10-0404 October 1999 Forwards Summary of Decommissioning Insp Plan for Fy 2000. Plan Will Be Updated Annually & May Be Revised at Any Time Based Upon Future Insp Findings,Events & Resource Availability ML20212J8121999-10-0101 October 1999 Discusses Plant,Unit 2 Completion of Licensing Action for GL 98-01 & Suppl 1, Y2K Readiness of Computer Sys at Npps. Ack Efforts That Licensee Have Completed to Date in Preparing Plant for Y2K Transition ML20212K8881999-09-30030 September 1999 Refers to 990928 Meeting Conducted at Fermi Unit 2 to Discuss Initiatives in Risk Area & to Establish Dialog Between SRAs & PSA Staff ML20217A3261999-09-30030 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 38 NRC-99-0091, Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations1999-09-27027 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations ML20212J8331999-09-27027 September 1999 Responds to Licensee 990924 Request That NRC Exercise Discretion Not to Enforce Compliance with Actions Required in TS 3/4.6.1.8.Ltr Documents 990923 Telcon with Util in Which NRC Orally Issued NOED ML20216G9791999-09-24024 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 37 NRC-99-0092, Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys1999-09-24024 September 1999 Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20216H3561999-09-23023 September 1999 Informs That During 990914 Telcon,L Sanders & M Bielby Made Arrangements with NRC to Inspect Licensed Operator Requalification Program at Fermi Nuclear Station for Week of 991129 Which Coincides with Util Regularly Scheduled Exam ML20216H4541999-09-23023 September 1999 Informs That During 990914 Telcon L Sanders & M Bielby Made Arrangements for Administration of Licensing Exams at Fermi Nuclear Station for Week of Jan 31,2000.NRC Will Make Exam Validation Visit to Facility During Week of Jan 10,2000 ML20212F3241999-09-20020 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 36 NRC-99-0081, Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public1999-09-17017 September 1999 Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public ML20217A9421999-09-0909 September 1999 Informs That NRC Plan to Conduct Addl Resident Insps Beyond Core Insp Program Over Next 6 Months to Assess Improvements in Areas of Procedural Compliance & Quality of Work. Historical Listing of Plant Issues Encl NRC-99-0079, Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-09-0808 September 1999 Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev ML20211Q0991999-09-0303 September 1999 Forwards Rev 35 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0090, Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld1999-09-0303 September 1999 Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld NRC-99-0066, Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d)1999-08-30030 August 1999 Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d) ML20211G4951999-08-24024 August 1999 Forwards Rev 34 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0055, Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval1999-08-19019 August 1999 Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval IR 05000341/19990131999-08-19019 August 1999 Discusses Insp Rept 50-341/99-13 & OI Rept 3-98-039 Conducted Into Potential Misconduct of Operator Formerly Employed by De.Nrc Determined That Violation of NRC Regulations Occurred.Synopsis of IO Rept Encl NRC-99-0056, Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation1999-08-19019 August 1999 Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation ML20211C0521999-08-17017 August 1999 Forwards Tables for Sections 3.6 & 3.7 of Draft Safety Evaluation of Proposed Conversion of Current TS to Improved Standard TS NRC-99-0089, Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-08-17017 August 1999 Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev ML20217E6181999-08-13013 August 1999 FOIA Request for Documents Re Implementing Regulations in 10CFR & Requesting That Region III Task Interface Agreement (TIA) Related to Fermi 2 Plant Be Made Available IR 05000341/19990011999-08-10010 August 1999 Forwards Insp Rept 50-341/99-01 on 990619-0723 & Nov. Violation of Concern Because Operators Did Not Understand License Requirements & Placed Plant in Configuration Where EDG 11 Was Removed from Service IR 05000341/19990121999-08-0606 August 1999 Forwards Insp Rept 50-341/99-12 on 990712-0716.No Violations Noted.Insp Focused on Implementation of Plant Chemistry & Radiological Environ Monitoring Programs & Operation of post-accident Sampling Sys ML20211C4761999-08-0606 August 1999 Forwards Draft Safety Evaluation Re Proposed Conversion of Current TS to Improved Standard TS NRC-99-0057, Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS1999-08-0404 August 1999 Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS ML20210N5451999-08-0303 August 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 33 NRC-99-0077, Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS1999-07-26026 July 1999 Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS ML20210J2121999-07-23023 July 1999 Discusses NRC OI Investigation Rept 3-98-039 Completed on 990524 & Forwards Notice of Violation NRC-99-0053, Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl1999-07-15015 July 1999 Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl ML20209H7211999-07-14014 July 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 32 NRC-99-0054, Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal1999-07-13013 July 1999 Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal ML20209F6571999-07-12012 July 1999 Forwards Insp Rept 50-341/99-09 on 990516-0618.No Violations Noted.Weak Procedural Guidance,Communications Issues & Configuration Control Weaknessess Were Evident NRC-99-0052, Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions1999-07-0707 July 1999 Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions ML20196J5511999-07-0202 July 1999 Discusses GL 92-01,Rev 1,Supp 1, Rv Integrity, Issued by NRC on 950519 & DE Responses & 980729 for Fermi 2.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 as Result of Review of Responses ML20209C6141999-07-0101 July 1999 Rev 31 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0076, Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included1999-06-30030 June 1999 Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARNRC-99-0094, Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed1999-10-22022 October 1999 Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed NRC-99-0085, Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl1999-10-22022 October 1999 Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl ML20217N9231999-10-15015 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 40 NRC-99-0087, Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons1999-10-12012 October 1999 Responds to NRC Re Violations Noted in Insp Rept 50-341/99-10.Licensee Contests Subject Violation,Due to Listed Reasons NRC-99-0083, Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-10-0707 October 1999 Submits Requested Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal ML20217D5331999-10-0707 October 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 39 ML20217A3261999-09-30030 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 38 NRC-99-0091, Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations1999-09-27027 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations ML20216G9791999-09-24024 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 37 NRC-99-0092, Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys1999-09-24024 September 1999 Documents Util Request for Enforcement Discretion with Respect to Requirements of TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20212F3241999-09-20020 September 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 36 NRC-99-0081, Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public1999-09-17017 September 1999 Submits Eight Relief Requests Associated with Containment Inservice Exam Program for Fermi 2 Plant,Per Provisions of 10CFR50.55a(g)(5)(iv).Requested Relief Does Not Adversely Affect Health & Safety of Public NRC-99-0079, Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-09-0808 September 1999 Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev NRC-99-0090, Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld1999-09-0303 September 1999 Forwards Proprietary Operator License Renewal Application, NRC Forms 398 & 396 for SW Burt,License SOP-30199-3. Proprietary Encls Withheld ML20211Q0991999-09-0303 September 1999 Forwards Rev 35 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0066, Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d)1999-08-30030 August 1999 Forwards semi-annual fitness-for-duty Rept for Fermi 2 for Period of 990101-0630,IAW 10CFR26.71(d) ML20211G4951999-08-24024 August 1999 Forwards Rev 34 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0056, Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation1999-08-19019 August 1999 Forwards Rev 2,change 0 to ISI-Nondestructive Exam (ISI-NDE) Program (Plan) for Piping,Components & Integral Attachments, for Second ten-year Interval of Fermi 2 Plant Operation NRC-99-0055, Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval1999-08-19019 August 1999 Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval NRC-99-0089, Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev1999-08-17017 August 1999 Forwards Rev 13 to Fermi 2 ITS Submittal Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev ML20217E6181999-08-13013 August 1999 FOIA Request for Documents Re Implementing Regulations in 10CFR & Requesting That Region III Task Interface Agreement (TIA) Related to Fermi 2 Plant Be Made Available NRC-99-0057, Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS1999-08-0404 August 1999 Forwards Rev 12 to ITS 980403 Submittal,Providing Update to Submittal for ITS Section 3.3,including Changes Associated with NRC Review of Rev 6 ITS ML20210N5451999-08-0303 August 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 33 NRC-99-0077, Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS1999-07-26026 July 1999 Forwards Rev 11 to Fermi ITS Submittal,Dtd 980403,providing Update to Submittal for ITS Sections 3.5,3.6 & 3.8.Update Includes Changes Associated with NRC Review of Util Transmittals of Revs 5,5a & 7 to ITS NRC-99-0053, Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl1999-07-15015 July 1999 Forwards Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan, Per 10CFR50.54(p)(2).Changes Do Not Decrease Effectiveness of Plan.Summary of Changes Also Encl ML20209H7211999-07-14014 July 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 32 NRC-99-0054, Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal1999-07-13013 July 1999 Forwards Rev 10 to Fermi 2 ITS Submittal, , Providing Update to Submittal for ITS Section 3.4,RCS.Update Includes Changes Associated with NRC Review of Util Transmittal of Rev 4 to ITS Submittal NRC-99-0052, Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions1999-07-0707 July 1999 Forwards Rev 9 to Fermi 2 ITS Submittal,Dtd 980403. Attachment 1 Contains Brief Abstract of Changes Included in Rev.Attachment 2 Contains Revised Pages for Submittal Along with Rev Instructions ML20209C6141999-07-0101 July 1999 Rev 31 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0049, Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure Encl1999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure Encl NRC-99-0076, Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included1999-06-30030 June 1999 Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included ML20209C1081999-06-29029 June 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section), Rev 30 NRC-99-0050, Forwards Rev 7 to ITS Submittal of 980403,to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8. Revision Instructions Included1999-06-24024 June 1999 Forwards Rev 7 to ITS Submittal of 980403,to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8. Revision Instructions Included NRC-99-0075, Forwards Operator License Renewal Application,Nrc Forms 398 & 396 for CR Effan,License SOP-30186-3.Encl Withheld1999-06-22022 June 1999 Forwards Operator License Renewal Application,Nrc Forms 398 & 396 for CR Effan,License SOP-30186-3.Encl Withheld ML20212J3861999-06-18018 June 1999 Forwards Rev 29 to Approved UFSAR LCR That Have Not Been Incorporated Into UFSAR Hardcopy (Sorted by Section) NRC-99-0047, Responds to NRC 990513 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Revised Design Calculation DC-5957, GL 96-06 Calculations, Encl1999-06-0909 June 1999 Responds to NRC 990513 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Revised Design Calculation DC-5957, GL 96-06 Calculations, Encl ML20195G2001999-06-0808 June 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy & Approved TRM Lcrs (Sorted by Section), Rev 28 ML20195E7391999-06-0303 June 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy & Approved TRM Lcrs (Sorted by Section), Rev 27 NRC-99-0046, Forwards Rev 6 to Fermi 2 ITS Submittal ,to Provide Remaining Responses to NRC RAI Re ITS Section 3.3, & Update ITS Submittal to Reflect Responses.Brief Abstract of Changes Contained in Attachment 11999-06-0202 June 1999 Forwards Rev 6 to Fermi 2 ITS Submittal ,to Provide Remaining Responses to NRC RAI Re ITS Section 3.3, & Update ITS Submittal to Reflect Responses.Brief Abstract of Changes Contained in Attachment 1 ML20207D9631999-05-26026 May 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy & Approved TRM Lcrs (Sorted by Section) ML20195B3381999-05-19019 May 1999 Forwards Rev 25 to Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy & Approved TRM Lcrs (Sorted by Section) NRC-99-0040, Requests NRC Approval of Revs to Weld Tables of Encl Relief Requests RR-A21,rev 1 & RR-A22,rev 1.Revs Do Not Impact Basis for Original Requests for Relief Because There Is No Change to Technical Basis or Proposed Alternative1999-05-14014 May 1999 Requests NRC Approval of Revs to Weld Tables of Encl Relief Requests RR-A21,rev 1 & RR-A22,rev 1.Revs Do Not Impact Basis for Original Requests for Relief Because There Is No Change to Technical Basis or Proposed Alternative NRC-99-0039, Requests Relief from ASME Section XI Requirement to Examine Essentially 100% of Selected Category B-J Pipe Welds,Per 10CFR50.55a(g)(5)(iii).Relief Request RR-A23,encl1999-05-14014 May 1999 Requests Relief from ASME Section XI Requirement to Examine Essentially 100% of Selected Category B-J Pipe Welds,Per 10CFR50.55a(g)(5)(iii).Relief Request RR-A23,encl NRC-99-0041, Requests Relief from ASME Section XI Requirements to Examine Essentially 100% of Accessible Category B-D Nozzle Welds,Per 10CFR50.55a(g)(5)(iii).Rev 1 to Relief Request RR-A6,encl1999-05-14014 May 1999 Requests Relief from ASME Section XI Requirements to Examine Essentially 100% of Accessible Category B-D Nozzle Welds,Per 10CFR50.55a(g)(5)(iii).Rev 1 to Relief Request RR-A6,encl NRC-99-0038, Requests Relief from ASME Section XI 1980 Requirement to Examine Essentially 100% If Category B-A RPV Shell Weld Lengths,Per 10CFR50.55a(g)(5)(iii)1999-05-14014 May 1999 Requests Relief from ASME Section XI 1980 Requirement to Examine Essentially 100% If Category B-A RPV Shell Weld Lengths,Per 10CFR50.55a(g)(5)(iii) NRC-99-0045, Forwards Rev 5a to Fermi 980403 Submittal,Converting TS to Its.Encl Rev Provides Remaining Responses to NRC RAIs Re ITS Section 3.6 Contained in NRC 990211 Rai.Brief Abstract of Changes & Responses to Rai,Encl1999-05-0707 May 1999 Forwards Rev 5a to Fermi 980403 Submittal,Converting TS to Its.Encl Rev Provides Remaining Responses to NRC RAIs Re ITS Section 3.6 Contained in NRC 990211 Rai.Brief Abstract of Changes & Responses to Rai,Encl NRC-99-0044, Forwards Rev 5 to ITS to Provide Responses to RAI Re ITS Section 3.6 (Except ITS Section 3.6.1.3) Contained in & Update in ITS Submittal to Reflect Responses1999-04-30030 April 1999 Forwards Rev 5 to ITS to Provide Responses to RAI Re ITS Section 3.6 (Except ITS Section 3.6.1.3) Contained in & Update in ITS Submittal to Reflect Responses NRC-99-0059, Provides Notification Required by 10CFR50.82(a)(7) of Changes to Fermi 1 Decommissioning Cost Estimate1999-04-29029 April 1999 Provides Notification Required by 10CFR50.82(a)(7) of Changes to Fermi 1 Decommissioning Cost Estimate ML20206E2941999-04-28028 April 1999 Forwards Approved UFSAR Lcrs That Have Not Been Incorporated Into UFSAR Hardcopy & Approved TRM Lcrs (Sorted by Section), Rev 24 NRC-99-0037, Forwards Rev 9 to Fermi 2 Ufsar,Per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of Changes to QA Program & Vol 1 of Technical Requirements Manual,Encl1999-04-26026 April 1999 Forwards Rev 9 to Fermi 2 Ufsar,Per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of Changes to QA Program & Vol 1 of Technical Requirements Manual,Encl 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARNRC-90-0142, Forwards Revised Semiannual Fitness for Duty Rept,Consisting of Statement Re Percentage of Individuals Tested & Revised Graph,Per G Pirtle Request1990-09-0707 September 1990 Forwards Revised Semiannual Fitness for Duty Rept,Consisting of Statement Re Percentage of Individuals Tested & Revised Graph,Per G Pirtle Request NRC-90-0152, Forwards Rev 3 to Radiological Emergency Response Preparedness Plan.W/O Encl1990-09-0505 September 1990 Forwards Rev 3 to Radiological Emergency Response Preparedness Plan.W/O Encl NRC-90-0139, Responds to NRC Re Memorization of Immediate Operator Actions in Abnormal Operating Procedures (Aop). Definition of Immediate Action Under Review to Provide Mechanism for Consistent Application to All AOPs1990-08-31031 August 1990 Responds to NRC Re Memorization of Immediate Operator Actions in Abnormal Operating Procedures (Aop). Definition of Immediate Action Under Review to Provide Mechanism for Consistent Application to All AOPs NRC-90-0116, Forwards Semiannual Fitness for Duty Rept1990-08-29029 August 1990 Forwards Semiannual Fitness for Duty Rept NRC-90-0117, Forwards, Fermi 2 Nuclear Power Plant Semiannual Radioactive Effluent Release Rept for Jan-June 1990. No Releases Occurred1990-08-28028 August 1990 Forwards, Fermi 2 Nuclear Power Plant Semiannual Radioactive Effluent Release Rept for Jan-June 1990. No Releases Occurred NRC-90-0118, Forwards Endorsement 35 to Maelu Policy MF-120 & Endorsement 139 to Nelia Policy NF-921990-08-24024 August 1990 Forwards Endorsement 35 to Maelu Policy MF-120 & Endorsement 139 to Nelia Policy NF-92 NRC-90-0135, Affirms That Util Intends to Conduct Insp of Low Pressure Turbine Rotor Disks During Upcoming Refueling Outage.Insp of Low Pressure Turbine 2 Carried Out During First Refueling Outage.No Evidence of Stress Corrosion Found1990-08-17017 August 1990 Affirms That Util Intends to Conduct Insp of Low Pressure Turbine Rotor Disks During Upcoming Refueling Outage.Insp of Low Pressure Turbine 2 Carried Out During First Refueling Outage.No Evidence of Stress Corrosion Found NRC-90-0137, Forwards NPDES Permit MI0037028 for Plant,Approved by State of Mi Water Resources Commission During 900719 Meeting1990-08-17017 August 1990 Forwards NPDES Permit MI0037028 for Plant,Approved by State of Mi Water Resources Commission During 900719 Meeting NRC-90-0136, Requests That NRC Administer Operator Licensing Exam in Dec 1990 & Postpone Operator Requalification Exam1990-08-17017 August 1990 Requests That NRC Administer Operator Licensing Exam in Dec 1990 & Postpone Operator Requalification Exam NRC-90-0133, Forwards Rev 5 to Security Personnel Training & Qualification Plan.Rev Establishes App D & Records Retention Matrix to Provide Central Location in Plan for Info on Records Retention Pages 3-4,3-8 & 3-9.Rev Withheld1990-08-0909 August 1990 Forwards Rev 5 to Security Personnel Training & Qualification Plan.Rev Establishes App D & Records Retention Matrix to Provide Central Location in Plan for Info on Records Retention Pages 3-4,3-8 & 3-9.Rev Withheld NRC-90-0112, Responds to NRC Re Violations Noted in Insp Rept 50-341/90-07.Corrective Actions:Review of RF01 Turbine Work Packages to Identify Where Addl Controls Should Be Placed in Similar Future RF02 Packages Conducted1990-08-0303 August 1990 Responds to NRC Re Violations Noted in Insp Rept 50-341/90-07.Corrective Actions:Review of RF01 Turbine Work Packages to Identify Where Addl Controls Should Be Placed in Similar Future RF02 Packages Conducted NRC-90-0111, Responds to Concerns Re Open Item 90-007-04,per NRC 900627 Request.Potential Enhancements to Drawings Being Reviewed & to Be Resolved by Dec 19901990-08-0303 August 1990 Responds to Concerns Re Open Item 90-007-04,per NRC 900627 Request.Potential Enhancements to Drawings Being Reviewed & to Be Resolved by Dec 1990 ML20055H8921990-07-26026 July 1990 Forwards Certification of Financial Assurance for Decommissioning of Facility,Per 10CFR50.33(k) & 50.75. Util Intends to Retain Unit 1 in Safe Storage Status Until Unit 2 Shut Down & Decommissioned NRC-90-0131, Forwards Rev 15 to Physical Security Plan.Rev Withheld1990-07-24024 July 1990 Forwards Rev 15 to Physical Security Plan.Rev Withheld NRC-90-0108, Discusses Deletion of Commitment for Temporary Mod Program, Per Insp Rept 50-341/84-25.Requirement for Operations Engineer to Approve Extensions of Temporary Mods Beyond 30 Days Being Deleted from Procedure FIP-OP1-021990-07-18018 July 1990 Discusses Deletion of Commitment for Temporary Mod Program, Per Insp Rept 50-341/84-25.Requirement for Operations Engineer to Approve Extensions of Temporary Mods Beyond 30 Days Being Deleted from Procedure FIP-OP1-02 NRC-90-0093, Submits Clarification of Design for Plant Suppression Pool Temp Monitoring Sys.Design Adequate to Ensure Suppression Pool Water Temp within Allowable Tech Spec Limits1990-07-18018 July 1990 Submits Clarification of Design for Plant Suppression Pool Temp Monitoring Sys.Design Adequate to Ensure Suppression Pool Water Temp within Allowable Tech Spec Limits NRC-90-0091, Requests Relief from Commitment to Perform 100% Audits of Tech Spec Line Items.Tech Spec Improvement Program Has Been Completed Which Provides Extensive Review of Tech Spec Line Items1990-07-0202 July 1990 Requests Relief from Commitment to Perform 100% Audits of Tech Spec Line Items.Tech Spec Improvement Program Has Been Completed Which Provides Extensive Review of Tech Spec Line Items NRC-90-0101, Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. Table Listing Status for Each Issue Encl1990-06-29029 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. Table Listing Status for Each Issue Encl NRC-90-0100, Discusses Installation of Motor Operated Valve Limiter Plates,Per IE Bulletin 85-003.Commitment to Install Limiter Plates Deferred Until Time When Valve or Valve Operator Would Be Disassembled for Another Reason1990-06-27027 June 1990 Discusses Installation of Motor Operated Valve Limiter Plates,Per IE Bulletin 85-003.Commitment to Install Limiter Plates Deferred Until Time When Valve or Valve Operator Would Be Disassembled for Another Reason NRC-90-0088, Discusses Changes Made to Commitment Addressing Calibr Frequency for Inservice Test Instrumentation,Per Violation 87009-03.Nine-month Calibr Frequency for Subj Instrumentation No Longer Appropriate or in Use1990-06-14014 June 1990 Discusses Changes Made to Commitment Addressing Calibr Frequency for Inservice Test Instrumentation,Per Violation 87009-03.Nine-month Calibr Frequency for Subj Instrumentation No Longer Appropriate or in Use NRC-90-0095, Provides Schedule for Implementation of Mods Re Compliance W/Reg Guide 1.97,Rev 2,per 900502 Request1990-06-0606 June 1990 Provides Schedule for Implementation of Mods Re Compliance W/Reg Guide 1.97,Rev 2,per 900502 Request NRC-90-0089, Submits Supplemental Response to NRC Concerns on RHR Operability from Insp Rept 50-341/89-17.Util Faced W/ Decision to Provide Addl Overheating Protection to RHR Sys Pump Vs Maintaining Necessary Water Coverage of Fuel1990-06-0404 June 1990 Submits Supplemental Response to NRC Concerns on RHR Operability from Insp Rept 50-341/89-17.Util Faced W/ Decision to Provide Addl Overheating Protection to RHR Sys Pump Vs Maintaining Necessary Water Coverage of Fuel NRC-90-0085, Provides Plans for Eliminating Temporaary Mods at Plant,Per Insp Rept 50-341/90-051990-05-29029 May 1990 Provides Plans for Eliminating Temporaary Mods at Plant,Per Insp Rept 50-341/90-05 NRC-90-0074, Discusses Insp of Flash Tanks & Reactor Feed Pump Strainers. No Further Evidence of Moisture Separator Reheater Debris Discovered in Strainers,Stub Tubes,Wire Mesh or Structural Members1990-05-18018 May 1990 Discusses Insp of Flash Tanks & Reactor Feed Pump Strainers. No Further Evidence of Moisture Separator Reheater Debris Discovered in Strainers,Stub Tubes,Wire Mesh or Structural Members NRC-90-0083, Discusses Action Plan to Review Socket Weld Failures at Plant.Failure History of Socket Welds Will Be Investigated to Determine Whether or Not Significant Common Mode Failure Mechanism Evident.Plan Expected to Be Completed by 9005251990-05-18018 May 1990 Discusses Action Plan to Review Socket Weld Failures at Plant.Failure History of Socket Welds Will Be Investigated to Determine Whether or Not Significant Common Mode Failure Mechanism Evident.Plan Expected to Be Completed by 900525 NRC-90-0082, Documents Commitments Made During Recent Meetings & Telcon on RHR Sys Small Bore Connections1990-05-11011 May 1990 Documents Commitments Made During Recent Meetings & Telcon on RHR Sys Small Bore Connections NRC-90-0068, Forwards 1989 Annual Financial Repts for Detroit Edison Co & Wolverine Power Supply Cooperative,Inc1990-05-0101 May 1990 Forwards 1989 Annual Financial Repts for Detroit Edison Co & Wolverine Power Supply Cooperative,Inc NRC-90-0071, Responds to NRC 900316 Ltr Re Violations Noted in Insp Rept 50-341/90-03 Re Emergency Preparedness Exercise Weaknesses. Corrective Actions:Case Studies Will Be Developed & Presented in Licensed Operator Requalification Training1990-04-30030 April 1990 Responds to NRC 900316 Ltr Re Violations Noted in Insp Rept 50-341/90-03 Re Emergency Preparedness Exercise Weaknesses. Corrective Actions:Case Studies Will Be Developed & Presented in Licensed Operator Requalification Training NRC-90-0078, Responds to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Bow. Util Has Decided That Fuel Channel Boxes Will Not Be Used After First Bundle Lifetime1990-04-25025 April 1990 Responds to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Bow. Util Has Decided That Fuel Channel Boxes Will Not Be Used After First Bundle Lifetime NRC-90-0051, Responds to SALP 11 Board Rept 50-341/90-01.Outage Critique Action Plan Issued for First Refueling Outage Identifying Lessons Learned & Areas Needing Improvement1990-04-12012 April 1990 Responds to SALP 11 Board Rept 50-341/90-01.Outage Critique Action Plan Issued for First Refueling Outage Identifying Lessons Learned & Areas Needing Improvement NRC-90-0060, Responds to 900104 Request for Supplemental Station Blackout Submittal1990-03-29029 March 1990 Responds to 900104 Request for Supplemental Station Blackout Submittal NRC-90-0061, Forwards Addl Info Re Proposed Drywell Level Instrument Line Configuration,As Followup to 890927 Tech Spec Change Request.Rept Provides Info Re Reasons for Designating Primary Containment Isolation Valve Normally Opened1990-03-27027 March 1990 Forwards Addl Info Re Proposed Drywell Level Instrument Line Configuration,As Followup to 890927 Tech Spec Change Request.Rept Provides Info Re Reasons for Designating Primary Containment Isolation Valve Normally Opened NRC-90-0055, Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47 - Safety Implications of Control Sys in Lwrs. Overfill Protection Sys Adequately Separated from Main Feedwater Control Sys1990-03-19019 March 1990 Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47 - Safety Implications of Control Sys in Lwrs. Overfill Protection Sys Adequately Separated from Main Feedwater Control Sys NRC-90-0024, Suppls Response to Violations Noted in Insp Rept 50-341/85-47 Re Security Records.Util Intends to Rely Solely on Historical Tapes to Retrieve Records Required by Physical Security Plan.Hard Copy Computer Logs Will Be Discarded1990-03-16016 March 1990 Suppls Response to Violations Noted in Insp Rept 50-341/85-47 Re Security Records.Util Intends to Rely Solely on Historical Tapes to Retrieve Records Required by Physical Security Plan.Hard Copy Computer Logs Will Be Discarded NRC-90-0045, Forwards Inservice Insp Summary Rept of 1989 Inservice Insp at Fermi 2 Nuclear Power Plant.1990-03-13013 March 1990 Forwards Inservice Insp Summary Rept of 1989 Inservice Insp at Fermi 2 Nuclear Power Plant. NRC-90-0054, Responds to NRC 900212 Order Modifying License & Notice of Violation.Corrective Actions:Former Director of Nuclear Security No Longer Works for Util & Extensive Actions Taken to Improve Communications W/Nrc1990-03-0909 March 1990 Responds to NRC 900212 Order Modifying License & Notice of Violation.Corrective Actions:Former Director of Nuclear Security No Longer Works for Util & Extensive Actions Taken to Improve Communications W/Nrc NRC-90-0043, Responds to NRC 900224 Ltr Re Weaknesses & Violations Noted in Insp Rept 50-341/89-24.Corrective Actions:Nuclear Fire Protection Specialist Provided Training to Appropriate Personnel on 9002021990-03-0909 March 1990 Responds to NRC 900224 Ltr Re Weaknesses & Violations Noted in Insp Rept 50-341/89-24.Corrective Actions:Nuclear Fire Protection Specialist Provided Training to Appropriate Personnel on 900202 NRC-90-0037, Forwards Completed Questionnaires for Types of Insps,Audits & Evaluations,In Response to Generic Ltr 90-01, Voluntary Participation in NRC Regulatory Impact Survey.1990-03-0505 March 1990 Forwards Completed Questionnaires for Types of Insps,Audits & Evaluations,In Response to Generic Ltr 90-01, Voluntary Participation in NRC Regulatory Impact Survey. NRC-90-0029, Responds to Violations Noted in Insp Rept 50-341/89-36. Corrective Action:All Personnel in Operations & I&C Viewed Professionalism Video Which Included Presentation of Facts Concerning Event1990-03-0505 March 1990 Responds to Violations Noted in Insp Rept 50-341/89-36. Corrective Action:All Personnel in Operations & I&C Viewed Professionalism Video Which Included Presentation of Facts Concerning Event NRC-90-0028, Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1989 & Revised Pages of Rept for Jul-Dec 1988, Containing Recalculated Noble Gas Releases & Doses1990-03-0101 March 1990 Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1989 & Revised Pages of Rept for Jul-Dec 1988, Containing Recalculated Noble Gas Releases & Doses NRC-90-0034, Forwards, 1989 Annual Operating Rept for Fermi 2 & Main Steam Piping Dynamic Response Test Results1990-02-26026 February 1990 Forwards, 1989 Annual Operating Rept for Fermi 2 & Main Steam Piping Dynamic Response Test Results NRC-90-0036, Forwards Response to NRC Survey on Nuclear Fuel Cycle Industry Future Activity,Per 900122 Request1990-02-26026 February 1990 Forwards Response to NRC Survey on Nuclear Fuel Cycle Industry Future Activity,Per 900122 Request NRC-90-0026, Forwards Monthly Operating Rept for Jan 1990 for Fermi Unit 2 & Revised Rept for Dec 1989,correcting Error in Net Electrical Generation Figure1990-02-15015 February 1990 Forwards Monthly Operating Rept for Jan 1990 for Fermi Unit 2 & Revised Rept for Dec 1989,correcting Error in Net Electrical Generation Figure NRC-90-0020, Forwards Response to Violations Noted in Insp Rept 50-341/89-31 Re Maint Support for Security Equipment.Addl Instrumentation & Control Repairmen Hired.Encl Withheld (Ref 10CFR73.21)1990-02-12012 February 1990 Forwards Response to Violations Noted in Insp Rept 50-341/89-31 Re Maint Support for Security Equipment.Addl Instrumentation & Control Repairmen Hired.Encl Withheld (Ref 10CFR73.21) NRC-90-0010, Responds to NRC 900102 Ltr Re Violations Noted in Insp Rept 50-341/89-30.Corrective Actions:Storage Area in Machine Shop closed-out & QA1 Matl Returned to Warehouse Where Positive Controls in Effect & Shift Turnover Procedure Revised1990-02-0101 February 1990 Responds to NRC 900102 Ltr Re Violations Noted in Insp Rept 50-341/89-30.Corrective Actions:Storage Area in Machine Shop closed-out & QA1 Matl Returned to Warehouse Where Positive Controls in Effect & Shift Turnover Procedure Revised NRC-90-0012, Forwards Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Monitoring & Treatment Programs to Reduce Incidents of Flow Blockage Due to Biofouling Will Be Implemented During Early 19911990-01-26026 January 1990 Forwards Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Monitoring & Treatment Programs to Reduce Incidents of Flow Blockage Due to Biofouling Will Be Implemented During Early 1991 NRC-90-0016, Responds to 10CFR26 Re fitness-for-duty Programs.Util Conducting Testing for Drugs Described in 10CFR26,App a, Section 2.1(a) & at Cutoff Levels Defined in Sections 2.7(3)(1) & 2.7(f)(2) as of 9001031990-01-26026 January 1990 Responds to 10CFR26 Re fitness-for-duty Programs.Util Conducting Testing for Drugs Described in 10CFR26,App a, Section 2.1(a) & at Cutoff Levels Defined in Sections 2.7(3)(1) & 2.7(f)(2) as of 900103 NRC-90-0013, Responds to NRC Bulletin 89-002, Stress Corrosion Cracking of High Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor Darling Model S350W Swing Check Valves or Valves of Similar Design. Subj Valves Not Used by Util1990-01-26026 January 1990 Responds to NRC Bulletin 89-002, Stress Corrosion Cracking of High Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor Darling Model S350W Swing Check Valves or Valves of Similar Design. Subj Valves Not Used by Util NRC-89-0297, Forwards Supplemental Response to NRC Request for Addl Info on Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. All Welds Accessible for Ultrasonic Insp1990-01-12012 January 1990 Forwards Supplemental Response to NRC Request for Addl Info on Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. All Welds Accessible for Ultrasonic Insp NRC-89-0240, Advises That Info in NRC 891010 Ser,Section 4.13 Re Alternate Rod Insertion/Recirculation Pump Trip Initiation Installed on Divisional Basis,Per ATWS Rule,Deemed Correct. Addl Alarm Also Provided for Arm Position of Switches1990-01-11011 January 1990 Advises That Info in NRC 891010 Ser,Section 4.13 Re Alternate Rod Insertion/Recirculation Pump Trip Initiation Installed on Divisional Basis,Per ATWS Rule,Deemed Correct. Addl Alarm Also Provided for Arm Position of Switches 1990-09-07
[Table view] |
Text
'f' /C Edward Hines Ancris.., -
Q ,.3 ' , A s,- / .s Detroit s
Edison w. . .- ~
October 30, 1979 EF2-50,63)
Mr. James G. Keppler Regional Director Directorate of Regulatory Operations Region III U.S. Nuclear Re_ ulatory Commission 799 Roosevelt Road Glen Ellyn. Illinois 60137
Dear Mr. Keppler:
Detroit Edison's Response to NRC IE Bulletin 79-14 NRC IE Bulletin 79-14, including Rev. 1, and supplements 1 & 2, concerned Seismic Analysis for As-Built Safety-Related Piping Systems. Detroit Edison has investigated this matter for the Enrico termi Power Plant, Unit 2, and our response is contained in the enclosed Edison memorandum (EF2-50,595 of October 29, 1979).
If you require additional action by Edison in this matter, please advise us.
Very truly yours,
-I'S?t t.
HE/Im Attachment cc: Mr. John G. Davis Acting Director Office of Inspection and Enforcement Division of Reactor Inspection Programs U.S. Nuclear Regulatory Commission Washington D.C. 20555 Director Division of Opera,ing Reactors Office of Nuclear Reactor Regulation g', \-
U.S. Nuclear Regulatory Commission Washington D.C. 20555 hp 1215 333 p 7911120 / A7 g
Deholt 4
Edisor ENRICO FERMI 2 PROJECT October 29, 1979 ENGINEERING EF2-50,595 To: R. W. Barr From: W. F. Colbert M g ,,p,q
References:
- 1) Enrico Fermi Power Plant - Unit 2
- 2) USNRC Licensing Docket 50-341
- 3) Letter on Docket 50-341 Dated July 2, 1979 from J. C. Keppler, USNRC to Edward Hines, Edison.
- 4) Letter on Docket 50-341 Dated July 20, 1979 from J. C. Keppler, USNRC to Edward Hines, Edison.
- 5) Letter on Docket 50-341 Dated August 20, 1979 f rom J. C. Keppler, USNRC to Edward Hines, Edison.
- 6) Letter on Docket 50-341 Dated September 12, 1979 from J. C. Keppler, USNRC to Edward Hines, Edison
- 7) USNRC IE Bulletin 79-14, Revision 1, Plus Supplements 1 and 2 to that Bulletin.
- 8) EF2-50, 253, Revision A, Dated October 16, 1979
Subject:
Detroit Edison Response to NRC IE Bulletin 79-14 This memo advises you of Edison's actions to date, and future plans, formulateo to effectively address the concerns expressed in NRC IE Bulletin 79-14 relative to the accuracy of the input data used as the basis for the conduct of the Seismic Analysis of Category I Piping Systems on Fermi 2.
Those Piping Systems on Fermi 2 which have been designed to Category I (Edison Seismic Class I) requirements are identified in the FS AR ,
Table 3.2-1. The Piping Stress Analysis, including Seismic Analysis was prepared for each of these systems using the design documents which are listed, generically, below: (See Table I)
- 1) Piping Fabrication & Installation Drawings These documents specify the pipe routing, size, wall thickness, insulation inf ormation, and the location of in-line components.
121 3 334 19/90/6
Octobe r 29, 1979 EF2-50,595
- 2) Component Drawings These specify the size, weight, location of the center of gravity and overall geometry of the major in-line components (valves, flanges, etc)
- 3) Equipment Drawings These specify the equipment terminal (nozzle) locations, nozzle movements, allowable loads, etc.
- 4) Hanger Location Drawings These identify the support system components by mark number and type (spring, snubber, rigid, etc.) and locate the attachment point to the pipe.
- 5) Hanger Detail Sketches These give specific information as to the support design, orientation and function.
() W c. t . .. . . . c . '.,,<;.. ca m _ 4 .. 11.' O, 3 t e:.r ;
- AND -
- 7) System Design Instructions (B.31.1 Systems)
The above documents specify the various design, code and licensing r? lated requirements which must be addressed in the piping stress analysis.
- 8) Reactor-Auxillary Building Seismic Report This document provides the relevent seismic response spectra for both the OBE & SSE load cases.
The exact listing of all documents actually used is not included here due to the great volume of information involved. That exact listing, plus a listing of any supplemental documents used, such as notes of conferences, letters, non project related techaical reference documents, etc. , is readily available by reviewing the " Reference" section of the appropriate Piping Stress Analysis Report.
Due to the status of construction of the Fermi 2 piping systems, no reconciliation of the piping system seismic analysis to the "As-Built" condition has been eccomplished to date. Edison's present plans, relative to this activity are outlined below:
1215 335 19/90/6.1
1 t October 29, 1979 EF2-50,595 The Fermi 2 primary pressure boundary pipirg systems,1 1/4 inch and larger, out to the outer isolation valves are designed and constructed to the rules of ASME III, Class I or ANSI B.31.7, Class I and have been stress-analyzed to the rules of ASME III, Subsection NE-3000. For these lines Edison will provide for the reconciliation of these stress analyses with the "As-Built" condition of the piping prior to the issuance of the Certified Stress Report. This reconcili-ation will be accomplished by re-analysis or engineering evaluation, depending upon the deviation of the final "As-Built" configuration from the originally analyzed design con-figuration. This reconciliation will be conducted in accordance with the rules of Subsection NA-3355 of the ASME III 'ude and is planned to be completed prior to the conduct of the initial primary pressure boundry systems hydrostatic test. For a synopsis of the type of information considered in the reconciliation, see the attached Reference 8.
For Seismic Class I Systems designed to ASME III Class 2 & 3 or B.31.1 requirements, Engineering feels that the input to the seismic analysis does ef]ect the as-built condition beenuse of the canner in which Ediscn handles design chances to Seismic Class I piping systems which are required as a result of field conditions, as described.
All field generated requests for a change from the design configuration of Seismic Class I piping or pipe supports in excess of established tolerences must be submitted to Edison engineering for approval prior to actual implementation. If the request involves a minor change to the piping er hanger configuration, such as a hanger relocation or piping fit-up adjustment, which in Edison Engineering's judgement will not compromise the validity of the seismic analysis, the change is authorized. If the change is major in nature, such as a significant piping re-route or elmination of a pipe support, the stress analysis, including seismic analysis, is re-run and the ef fects of the change evaluated.
In either case described above, the Project design drawings are updated to reflect the change to the configuration of the piping system.
As construction nears the completion phase, the revised design drawings will be re-rev!ewed by the engineering firms who performed the original piping analysis. Where re-analysis is indicated as necessary due to the number and/or nature of the changes, that re-analysis wil] be accomplished. Where no significant changes have been found to occur, the analysis will not be re-done. .
1215 336 19/90/6.2
- October 29, 1979 EF2-50,595 Edison believes that the above described approach is adequately conservative to insure that field generated changes will not compromise the integrity of the seismic analysis of safety related piping systems on Fermi 2.
If you require our further input in this matter, please advise us.
WRITTEN BY: J. H. CASIGLIA EH/JHC/
ATTACHMENT-Table 1 & EF2-50, 253, Rev. A o
1215 337
TABLE I METHODS Ek1 PLOYED 7D SE/SM/ Call' YAM 42YZE ~
~
SE/SM/C CLASS I P/P/A/G ON FEA?M/ 2 P/PE CODE $ G/MPL/f/ED COMPO76P/ ZED S/ZE cl4SS 44MLYS/S (!) ANALKS/S ..
~~ 5T{ C' ASME R y
()P GASS /
~ S f ASME E X ~
OF Cf. ASS?{3 E.N e"- A S M E .227 , g, ,
4 CLASS 2W3 2'" 5' ASME.Z77 x
/Nm?P . des *S2'g'S
/ ,.
ASME M X OF I
X CL,4SS / (k')
B 3/ /
AlL. ><
SE/SM/CI NorES: /) S/MPL/f/8D AAMZWS/S /SOsscF/8E.O
/N'7HE FAPM/ 7 FSMA=', SUB S&970N
~~
. 3. 9. E. 7.
ASME.2Zi~, cf. ASS /..P/Ph' VG, /~ NOM E) P/Pd S/ZE AND (JNDEA*/S LESkWE To 7WE A='l// ES Of ASAff.2ZG SUBMC7/ON .NC -3G EO : .
Attachment to EF2-50,595 of October 29, 1979 I Deholt Edison
~
ENRICO FERMI UNIT 2 PROJECT ENGINEERING ,
October 16, 1979 EF2-50,253 Revision A To: W.M. Everett Site Superintendent From: W.F. Colbert Project Engineer
Subject:
As-Built Drawing Package Content for Class I Systems In order to finalize and certify the Class I piping analysis for Enrico Fermi Unit 2, e thorough and complete "as-bufIt" piping and hanger package needs to be developed for each stress report. The drawing content of each package was identified in letter FF2-43,107.
In an effort to support the proper development and coordination for this activity, engineering has developed minimum requirements for the content of each as-built package. The following are the re-quirements:
1). Two (2) marked prints each of the most current revision of the appropriate piping fabrication (-1), hanger installation
(-2) and hanger sketches shall be provided, each marked up as follows:
A). For all pipe-to-pipe dimensions for which the de-viation from the design dimension is k inch or less, the dimension shall be considered correct (equal to design) and the appropriate dimension shall be shaded in yellow.
B). For all pipe-to-structure (building column centerline) dimensions for which the deviation from the design di-mension is 1-inch or less, the dimension shall be con-sidered correct (equal to design) and the appropriate dimension shall be shaded in yellov.
C). For all dimensions in excess of the above limits, a deviation shall be assumed to exist and the actual dimension shall be reported, this shall be accomplished by crossing out the design dimension and providing the corresponding "as built" dimension in red. Actual di-mensions shall be reported to the nearest 1/8-inch.
) } \ *)
, MEMO TO: October 16, 1979 W.M. Everett EF2-50,253 Page 2 Revision A D). For pipe-to-hanger attachment points and hanger-to-structure attachment points which deviate 3-inches or less from the design dimension, the dimension shd11 be considered correct and shall be shaded in yellow. De-viations in excess of 3-inches shall be crossed out and the actual dimension reported in red.
2). Information necessary on (-1) drawing:
A). As-built pipe-to-pipe dimensions B). As-built dimensions from pipe to referenced building members & coordinates.
C). Valve ID no. , type and end to end dimensions.
D). Valve operator orientation E). Pipe 0.D. & Wall thickness
F). As-built location of all flanges, reducers, pressure taps, thermal welle, shear lugs and other inline com-pononts.
jhk G). As-built location of all field welds and shop welds.
3). Information necessary on (-2) drawings:
A). As-built dimensions to hanger, restraint or snubber pipe attachments.
B). Valve body and operator weight.
C). Hanger mark no. , type and cold load setting (spring hangers) .
4). Information necessary en hanger sketches:
A). Mark-up to show as-built configuration of the permanent hanger.
B). Verification of hanger type (i.e. , spring, snubber, rigid, etc.).
C). Dimensional location of building attachment point.
D). For dummy snubbers or temporary hangers, a sketch shall be provided showing the above information.
- Verify wall thickness using UI thickness gauge at three locations on each piece of straight pipe or fitting.
1215 340
6 MEMO TO: October 16, 1979
. W.M. Everett EF2-50,253 Page 3 Revision A As a guide we are enclosing a sample as-built package identifying all of the above requirements. -
Please advise us as to your ability and schedule to supply the above-listed information, in the format specified by October 5,1979.
M tten by: R. Kennedy cc: T.H. Dickson L. Bertani I g/s' 'jj F.E. Gregor jo'k J.il Casiglia D.E. Seifert K. Dempsey C.R. Bacon M.G. Sigetich F.M. Faubert Doc. Control 121 r-3 l [+ l