APPENDIX A
- (
NOTICE OF VIOLATIO::S Metropolitan Edison Conpany P. O. Box 542 Reading, Pennsylvania 19603 Docket "o. 50-289 Based on the results of the NRC inspection conducted on September 17-19, 1971, it appears that one of your activities was not conducted in full compliance with the conditions of your NRC Facility License No. DPR-50, as Indicated below:
Contrary to Section 6.5.c of the Appendix B, Technical Specifica-tions, notifications were not nade to the Co==ission by telephone and telegraph.within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> on,two occasions in uhich the Limiting Conditions for Operation were exceeded and the required follouup written reports were not subsitted within 7 days of the occurrences.
i This ites is a deficiency.
MI g
Other deficiencies identified through'your internal audit progras which were reported in a timely canner and corrected are' identified !
in the inspection report. No additional inforeation is needed for i ig.
these ite=s at this time.