Forwards Insp Repts 50-289/71-03 & 50-320/71-03 on 710624-25.No Noncompliance Noted
ML19210B662
Person / Time
Site: Crane  Constellation icon.png
Issue date: 07/30/1971
From: Howard E
US ATOMIC ENERGY COMMISSION (AEC)
To: Henderson J
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 7911110130
Download: ML19210B662 (1)


Text

_ _

.[

m g..

UNITED STATES T [J-ATOMIC ENERGY COMMISSION o: vision OF COMPWANCE 201 645 3942

^l

'l l

REGION I 970 BROAD STREET m.,.

wzw

,w

, v7 ivic, Jaly 30, 1971 J. B. Henderson, Chief, Reactor Construction Branch, Division of Compliance, HQ.

METROPOLITAN EDISON CCMPANY THREE MILE ISLAND UNITS 1 AND 2 DOCKET NOS. 50-289 and 50-320 The~ enclosed report of inspection of the Metropolitan Edison Company's Three Mile Island 1 and 2 construction site, performed by J. H. Tillou, A. V. J. Burzi, and D. M. Hunnicutt, on June 24-25, 1971, is forwarded for informaeion.-

This licensee's continuing efforts to reinforce ar.d amplify the site QA/QC surveillance activities are reassuring, although the efforts have been some-what less than an unqualified success.

]

We have concerns regarding the continuing series of concrete problems which indicate repeated failure of the site personnel to implement the details of concrete placement procedures.

The work stoppage by the operating end neers was settled on July 9, 1971, i

so activity on site should gradually cecelerate back to normal.

m Y

//

o-6/s-es f a }

E. M. Howard Senior Reactor Inspector

Enclosure:

CO Report No. 71-03, by J. Tillou, A. V. J. Burzi

& D. Hunnicutt, dated 7/29/71 cc:

E. G. Case, DRS (3)

P. A. Morris, DRL R. S. Boyd, DRL (2)

R. C. DeYoung, DRL (2)

D. J. Skovholt, DRL (3)

H. R. Denton, DRL (2)

A. Giambusso, CO 1586 050 L. Kornblich, Jr., CO R. H. Engelken, CO j

' Regional Directors, C 7911110/3 o DR Central File's

~,

l*.

U. S. ATOMIC ENERGY COMMISSION DIVISION OF COMPLIANCE

~'

REGION I INSPECTION REPORT CO Report No.:

71-03 050-00320

Subject:

Metropolitan Edison Company Docket No.(s): 050-00289 Three Mile Island Units 1 and 2 License No. (s): CPPR-40 & 66 Location: On Susquehanna River, South'of Category A

Harrisburg, Pennsylvania Date of Inspection:

June 24-25, 1971 Date of Previous Inspection: April 5-8, 1971 Type of Licensee:

PWR, 2535 MWt (B&W)

Type of Inspection: Routine, Announced y

Principal Inspector:

N 3 // ) M/~

7.29-7/

J. H. Tillou, Reactor Inspector Date

[ 2/9 *//

Accompanying Inspectors:

t A./V. J. Burzi, Keactor Inspector (Const.)

Date

/

D.

. Hunnicutt, Sr. Reactor Inspector, CO:III Other Accompanying Personnel: W. H. Baunack, Reactor Inspector (Operations)

Reviewed by.

7-M-7 /

E. M. Howard, Senior Reactor Inspector Date Proprietary Information:

NONE DUPLICATE DOCUMENT 5 8 60 5 i Entire document previously entered into system under: