ML19210B630

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-289/69-01 on 690107.No Nonconformance Noted
ML19210B630
Person / Time
Site: Crane Constellation icon.png
Issue date: 02/05/1969
From: Moseley N
US ATOMIC ENERGY COMMISSION (AEC)
To: James O'Reilly
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19210B631 List:
References
NUDOCS 7911110105
Download: ML19210B630 (2)


Text

.

a b*,

.a4

s..

.s.,

...... -. v

....w.s G.V.

.C.'. C." 30 :...%.n.sc:

2c'.

5 AZO.ON.

'n70 OAca0 S7RICT v

1 -

N:wA.u..scw ;zA;zy c7:c2

($\\

February 5, 1969 2.

O'Reilly, C.,i e f, Reactor Inspection and Enforcement

~

3 ranch Division of Ccnpliance, HQ

..EORC?CLITAN EDISON COMPANY COCXZO NO. 50-289 The attached report of 2. visit to the subject facility on J,anuary 7, 1969 is forwarded for information.

No items of nonconformance and no safety items were found.

Infor.arion about the concrete voids in the tendon galley is included in this report.

The repair procedure is in-ciudad as an attachment to the report.

This procedure has been reviewed by Region I and we believe that it is adequa:e oince no structural-integrity has been lost.

Our feeling is that protection of the exposed rebar is the primary necessity for re_: sir / Since DRL has expressed an interest in reviewing the repair procedure before the repairs are made, our in-spec:crs have told the licensee that we would defer comnents n'o MZO-ED until the review by Headquarters is completed.

I: :.s noted that MET-ED is holding up repairs in the areas Of the tendons to be used until we notify them that the procedure is considered to be adequate.

Repairs in the areas of the unused tendon conduits, however, will proceed.

nadaquate inspection of the concrete forms, prior to pouring, appears to be the cause of the voiding.

Subsequent to the voiding, the licensee tightened up on this inspection area.

?o further evidence of this deficiency has been detected.

7ae licensee believes that additional testing is not necessary to confirm that there are no more voids.

Reasons for this posizion are discussed in the report.

1

/ /. }u. h w :'

s~

N N.

C. Moseley g7n

, g., g U<d Senior Reactor Inspector l;UU Inc10 sura:

OE

-3M's"" Cal;!!-

7911110 dated 1/29/69 D

/

T

, cc:

2.

G.

Case, DRS

.T.

S.

Boyd, DRL (2)

S.

Levine, DRL (6)

D.

J.

Skovholt, DRL (3)

L.

Xornblith, Jr.,

CO Regional Directors, CO Rza files D*P D

]D W j

//d F

MJul.i1 @

3 W4 O

1svo'

\\

4 C

em._ _ _.

~

U. S. ATOMIC ENERGY COMMIS.SION REGION I DIVISION OF COMPLIANCE Report of Inspection CO Report No. 289/69-1 Licensee:

METROPOLITAN EDISON COMPANY (Three Mile Island Nuclear Station No. 1)

Provisional Construction Permit No. CPPR-40 Date of Inspection:

January 7, 1969 Date of Previous Inspection:

September 18-19, 1968

'W b

/ ff Inspected By:

F.

. Cantrell, Re2(ctor Inspector

'Dat6

/= 19 'b9 D.

E. Whitesell, Reactor Inspector (Constr)

Date M '.i W A

[f Reviewed By:

N.

C Moseley, S'enior Reactor Inspector

' Da te -

SCOPE A special announced inspection was made at the 2452 Mwt Pressurized Water Power Reactor under construction on Three Mile Island near Middletown, Pa.

The purpose was to inspect the concrete voids uncovered when the forms were removed from the ceiling of the tendon galley.

Mr. D. Whitesell, Reactor Inspector (Construction),

Region I, accompanied the assigned inspector and wrote portions of this report.

DUPLICATE DOCUMEN3 5 8 8 0 8 0 Entire document previously entered into system under:

ANO No. of pages: