Action Control Form CDR 122 Requesting Evaluation of Technical Adequacy of Corrective Action & Final Resolution of Deficiency Re Incomplete Documentation for Welding Filler Electrodes Used by B&W for Manual Metal Arc Process
ML19210B454
Person / Time
Site: Crane  Constellation icon.png
Issue date: 06/20/1973
From: Knuth D
US ATOMIC ENERGY COMMISSION (AEC)
To: Engelken R
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19210B453 List:
References
CDR-122, NUDOCS 7911080672
Download: ML19210B454 (1)


Text

R. H. Engelken, RO JUN 2 0 1973 FS&EB ACTION CONTROL h.di A.

Action Code CDR#122 Name of Licensee and Facility Metropolitan Edison Co. (Three Mile Island 1 Docket No. or License No.

50-289 & 50-320 Title Origin CDR Report (licensee)

Date Rec'd 6/15/73 B.

FS&EB Branch Coordinator:

Bryan Dreher X

Ellis Paulus Completion Requested by C.

Action Requested of:

ADREMP M&PPOB EPB RPB ADCO X

OB CB TAB ~

OOE Region Date Requested 6/19/73 Completion Requested by A Reference Letter J. G. Miller (Met. Ed.) to F. E. Kruesi dated 6/13/73.

D.

Action Requested F

In accordance with PI 0600/6, " Construction Deficiency Reporting" the Metropolitan Edison Company (Three Mile Island 1 & 2) deficiency report of 6/13/73, covering incomplete documentation for welding filler electrodes used for the manual metal arc process by Babcock Wilcox, Mt. Vernon, Ohio, on Units 1.& 2 reactor vessels, is being assigned to ADC0 for evaluation of the technical adequacy of the corrective action being taken and final resolution of the deficiency.

E.

Date Action Completed Close-out (Date & Method)

Com=ents: If completion Jate is not consistent with your work schedule, please let us know.

Q of

.~

v.I..

jpa th D. F. Knuth, Deputy Director for Field Operations Directorate of Regulatory Operations 1584 070 c m _..

0,.,m..y,

..m z 7911080 (72