ML19210B443

From kanterella
Jump to navigation Jump to search
Action Control Form CDR 184 Requesting Evaluation of Technical Adequacy of Corrective Action & Final Resolution of Deficiency in Walworth/Aloyco Co Valves Per J Miller to DF Knuth
ML19210B443
Person / Time
Site: Crane  Constellation icon.png
Issue date: 10/31/1973
From: Jennifer Davis
US ATOMIC ENERGY COMMISSION (AEC)
To:
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19210B441 List:
References
CDR-184, NUDOCS 7911080664
Download: ML19210B443 (1)


Text

'

B. H. Grier, ADC0

_FS&E3 ACTION CONTROL FORM A.

Action Code CDR#184 Naec of Licensee and Facility Metropolitan Ed. Co. (Three 11tle Is.1 & 2)

Docket No. or Li:ense No.

50-289 & 50-320 Title Utlworth valve deficiency Origin utility Date Rec'd 10/1/73 B.

FS&EB Branch Coordinator:

Bryan Dreher X

Ellis Paulus Completfon Requested by C.

Action Requested of:

I ADREMP M&PPOB EP3 RPB ADC0 X

OB CB TAB 00E Region l

Date Requested 10/31/73 completion Reques ted by 11/21/73 Reference CDR dated 9/26, mem o d'. Miller to D. F. Knuth' u

D.

Action Requested The !!etropolitan Edison Co. CDR of'9/26/73 covering Walworth yalve j

deficiency is being assigned to ADC0 for evaluation of technical adequacy of the corrective action being taken and final resolution of the deficiency.

Also review for possible generic possibilities.

E.

Date Action Completed close-out (Date & Method)

Com=ents: If completion date is not consistent with your work schedule, please.let us know.

4 L -A(&.,_

)

J[ 8" Davis, Deputy Director r,

G.

for Field Operattens Directorate of Regulatory Operations 1584 056

'3911080 @

'