ML19210B379
| ML19210B379 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 10/24/1973 |
| From: | John Miller METROPOLITAN EDISON CO. |
| To: | Deyoung R US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 7911070701 | |
| Download: ML19210B379 (2) | |
Text
AEC '"
'1IEUTION FOR PART 50 DOCKET W" 3
(TDiPCRARY FOPJI)
CONTROL NO:
7910 FILE:
FROM:
DATE CF DOC DATE REC'D LTR Met 0 RPT OTHER Metropolitan Edison Company Reading, Pa.
19603 10-24-73 10-30-73 X
J. G. Miller TO:
R. C. DeYoung 1 signed SENT LOCAL PDR X CLASS UNCLASS PROP IhTO INPUT NO CYS REC'D DOCKET NO:
XXX 1
50-289 DESCRIPTION:
ENCLOSURES:
Ltr re our 9-27-73 Itr,....... furnishing info regarding Reactor Containment Concrete Examin-ation..............
ACKNOWLEDGED DO NOT RDIOVE PLANT NAME:
Three Mile Island Unit 1 FOR ACTION /INFORMATION 10-31-73 GC BUTLER (L)
,4CWENCER(L)
ZIEMANN(L)
REGAN(E)
W/ Copies W/4 Copies W/ Copies W/ Copies CLARK (L)
STOLZ(L)
DICKER (E)
W/ Copies W/ Copies W/ Copies W/ Copies GOLLER(L)
VASSALLO(L)
KNIGHION(E)
W/ Copies W/ Copies W/ Copies W/ Copies KNIEL(L)
SCHDiEL(L)
YOUNGBLOOD(E)
W/ CJpies W/ Copies W/ Copies W/ Copies INTERNAL DISTRI3UTION
~
G FILE )
TECH REVIEW A CiTON A/T IND LIC ASST
/AECPDR vfIENDRIE GRIMES BRAID!AN A GC, ROCM P-506A SCHROEDER CAPMILL DIGGS (L)
SALTZ::AN MUNT2ING/ STAFF vifiACCARY KASTNER GEARIN (L)
B. HURT CASE KNIGHT BALLARD A;0ULBOURNE (L)
PMNS GIAMBUSSO PAWLICKI SPANGLER LEE (L)
MCDONALD BOYD SHA0 MAIGRET (L)
DUBE MOORE (L)(EWR)
/TELLO ENVIRO _
SERVICE (L) gA)EYOUNG(L)(PWR)
HOUSTON MULLER SHEPPARD (E)
INFO SKOVHOLT (L)
NOVAK DICKER SMITH (L)
C. MILES P. COLLINE ROSS KNIGHTON TEETS (L)
/ Kenneke IPPOLITO YOUNGBLOOD WADE (E)
/ Klecker fEGOPR VIEDESCO REGAN WILLIAMS (E)
FILE a REGION (3)
LONG PROJECT LDR WILSON (L)
MORRIS LAINAS 1584 319 STEELE BENAROYA HARLESS VOLIMER EXTERNAL DISTRIBUTICN
/1 - LOCAL PDR_Harrisburg. Pa.
1 - DTIZ(A3E?J:ATHY)
(1)(2)(10)-NATIONAL LAB'S 1-PDR-SAN /LA/NY 1 - NSIC(BUCFXiAN) 1-GEP).LD LELLCUCHE 1 - ASLB(YORE /SAYRE/
1-W. PENNINGTON, Rm E-201 GT ERC0KHAVIN NAT. LAB WOODARD/"H" ST.
1-CONSULT /J:T' S 1-AG'-iED ( Ru t h Gu s ser.r.)
/16 - CYS ACRS RIMIC SENT TO LIC. ASST NEW! ARK /3LU:E/AGBABIAN Di-S-12 7. GT.
10-31-73 COULBOURNE 1-GERALD ULRIKSCli.. 0FJ;L 1-RD.. FULLER..F-309 GT v en o7 0707 9
Regubtorf Dockst File
- - ~ - '
~ ~ - - ' -
-- ~~
~ -
~
!Mel
& n,,nma
,w.x,n, METRCPOLITAN EDISON COMPANY POST OFFICE BOX 542 REACING, PENNSYLVANI A 19603 TELEPHONE 215 - 929-3601 October 24, 1073
'h fc& 3 y
Mr. R. C. DeYoung, Assistant Director U
N
'N.
,, L. - '
p R, 's d<,
fd
'Q OpgO 737J x ~f
' gO.N'#
for Pressurized Water Reactors f
[r
-- j s
Directorate of Licensing r, ",~'-
M D
Office of Regulation CO *"'
., 9
[Y
\\
j)$-
j'r,. U.) u 4-j U.S. Atomic Energy Cocnission j
Washington, DC 20545 k
fy' '-'y
^_.:. 'b, % K ':
/Q
SUBJECT:
THREE MILE ISLAND NUCLEAR TAII.ON
'~
, J.','
REACTOR CONTAINMENT CONCRETE EXAMINATION qc;
$x UNIT 1
= l DOCKET No. 50-289
Dear Mr. DeYoung:
in response to your letter of September 27, 1973, the upper bearing plates for vertical tendons number V-79 and V-105 were removed on September 28, 1973. The subsequent inspection of the concrete beneath the bearing plates was made in the presence of Mr. Seth Folsom of the Atomic Energy Comission's Regulatory Operations Region I office.
The inspection indicated the following:
(1) Typical surface voids due to air and water migration were considered normal.
(2) Honey Combing did not exist.
(3) The concrete surface was observed to be sound and capable of transferring the tendon prestress force into the structure.
(4) There was no evidence of concrete crushing, cracking, spalling, or any other destress.
It was concluded that the concrete is sound and appropriate for its intended use.
Very truly yours,
~
N. g.,
- t. N m
J. G. Miller Vice President 1584 320 cc:
Mr. H. M. Dieckamp
-,,b J.i Mr. W. A. Verrochi