ML19210A950
| ML19210A950 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 01/09/1968 |
| From: | Newmark N NATHAN M. NEWMARK CONSULTING ENGINEERING SERVICES |
| To: | Morris P US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19210A951 | List: |
| References | |
| NUDOCS 7911010661 | |
| Download: ML19210A950 (2) | |
Text
e e
' 'T
+
n e
M 3
Nathan M. New:sark y
OTHE R:
REPORT:
MEMO:
A LTR.
A (Dr. N.
. Hew:nrk)
OTHER:
cc:
QRIG,g 1
1 co"cu m "ce O
o^n aN5*t'to>
Ac' c " "Ect55^*v O
Dr. leter A. tiorris, l'aL co"*EN' O
8' '
NO ACTION NECE15A2' O
IU COO 4:
POST OFFICE
$$iF.:
DATE RECElvED BY REG.NO?
DATE REFERRED TO CRIPTION: l Muse 8. Unciew4d) r trans tne followins:
1-11-M newen w/lcy - TOL ACTI N __
(1 orig & 1 cc. Itr)
CLOSURE 5:
INIO CIS TO:
IH!,L CKiid: " Adequacy of the Etrac-H. r ice 8: Staff r
ural criteria for Three Mile Ial=ad uclear Station Unit v1" Morria/Skvohelt long/Karas(Orig fo,- Mats) 11 1 cigned cy ),
s' d,\\_
Dist d cui,pl file (Cy until Boyd
.i v.-
orig ret)
N, fy 1-GGC/T. Conner gg
'd RM DeYo q u.s. Atomic sNanov coMMISSloN MAIL CONTROL FORM ronM Acc.szes.
48 60) 1946-235519
- u. S. GOVERNMENT PalNTinG OFFICE:
\\
1 A w A\\ c h LD]iAMe 1509 2ul 79120.10
^
NATHAN M.
NEWMARK CONSULTING ENGINEERING SERVICES 1114 CIVIL ENGINEERING 6UILDING URBANA, ILLINOI3 618o1 9 January 1968 Dr. Peter A. Morris, Director Division of Reactor Licensing U. S. Atomic Energy Commission Washington, D.C.
20545 Re: Transmittal of Final Report " Adequacy of the Structural Criteria for Three Mile Island Nuclear Station Unit 1," by N. M. Newmark F,W. J. Hall (AEC Document 50-289)
Dear Dr. Morris:
We are transmitting herewith a signed copy of our final report on the Metropolitan Edison Company Three Mlle Island Nuclear Station Unit No. 1.
Sincerely yours, 1
'2] @1 9 h o w e M L N. M. Newmark bjw fCx
~N--
,N cc:
W. J. Hall Enclosu res 5 ' jig 5.
1 a. o no1 202 101