ML19210A818

From kanterella
Jump to navigation Jump to search
Discusses Tech Spec Change Request 9 to DPR-50 Re TMI-1 Power Versus Rod Withdrawal Limit Curves.Primary Sys Heatup to Begin On/Or After 750605.Zero Power & Routine Physics Test to Be within Tech Specs Restrictions
ML19210A818
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/04/1975
From: Arnold R
METROPOLITAN EDISON CO.
To: Anthony Giambusso
US ATOMIC ENERGY COMMISSION (AEC)
References
GQL-1118, NUDOCS 7910310710
Download: ML19210A818 (3)


Text

.

f4RC DISTR!3UTION FOR PART SO DOCKET MATERIAL (TEMPOR ARY FORM)

CONTROL NO: 4o17 FILE:

FROM: Metropolitan Edison Co.

DATE OF DOC DATE REC'D LTR TWX RPT OTHER Reading,ld. 19o03 6-4-75 6-7-75 XX Pa R c Arno ORIG CC

.OTHER SENTI'RC PDR N}

TO: Mr. A Gia busco

~

1 signed SENT LOCAL POR CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

50-289 XXXXXX 1

DESCRIPTION:

ENCLOSURES:

Ltr request Tech Spec change with regard to TMI-1, concerns revisions to the TMI-l Pur. vs. Rod Withdrawal Limit Curves based on additional ejected rod worth analysis....

PLANT NAME: Three Mile Island FOR ACTION /INFORMATION m 6-T-75 BUTLER (L)

SCHWENCER (L) ZIEMANN (L)

REGAN (E)

W/ Copies W/ Copies W/ Copies W/ Copies CLARK (l.)

STOLZ (L)

DICKER (E)

LE AR (L) g W/ Copies W/ Copics W/ Copics W/f,Copics PARR (L)

VASSALLO (L)

KNIGHTON (E)

!: PIES W/ Copies W/ Copies W/ Copics W/ Copies KNIEL (L)

PURPLE (L)

YOUNGBLOOD (E) tr:t W/ Copics W/ Copics W/ Copics W/ Lopics INTERN /(L DISTRIBUTION G G F il.E TECH REVIEW DENTON

_LIC ASST _

A/T IND,

/Ntil ruti SCHROEDER GRIMES R. DIGGS (L)

G R AITM AN y OGC. ROOM P 506A MACCARY GAMMILL H. GE ARIN (L)

SA LTZM AN GOSSICK/STAF F KNIGHT KASTNER E. GOU LCOURNE (L)

MdLTZ f CASE PAWLICKI BALLARD P. KREUTZER (E)

GiAMBUSSO SHAO SPANGLER J. LE E (L-)

P L Ab'S_

BOYD STELLO M. MAIGRET (L)

MCDUNALD MOORE (L)

HOUSTON E NVI RO_

S': REED (E)

CH APM AiJ DEYOUNG (L)

NOVAK MULLER M. SERVICE (L)

DUBE (Lir)

SKOVHOLT (L)

ROSS DICKER S. SHEPPARD (L)

E. COUPE GOLLER (L) (Ltr).

IPPO LITO KNIGHTON M. SLATER (E)

PETERSON P. CO L LINS TEDESCC YOUNGDLOOD H. SMITH (L)

HARTFIELD (2)

DENISE LONG REGAN S. TEETS (L)

KLECKER REG _OPR_

LAIN AS PROJECT LDR [G. M LLI AMS (E)

EISENHUT FILE & REGION (2)

BENAROYA V. WILSON (i.)

WIGGIN10N HIPC VOLLMER H AR LE SS' R. INGRAM (!.)

/E /l N S $

If, EUTCM:

EXTERNAL CISTR_f.UU _5E V-r 1 - LOCAL PDR__ Harrisburg, P2.

/1 -- TIC (ABERN ATelY) (1)(2)(10)

N ATION A L L A BS ___.___

1 - PDR SAN /LA/NY e 1 - NSIC (BUCHANAN) 1 - W. PENNINGTON. Rm E ' 01 GT 1 - BROOKH AWN N AY i.AR 2

1 - ASLB 1 - CONSU LTANTS 1 - G. ULRIKSON CR.N L 1 - New ten Anderson NEWM AR K/B LUME/AG E A0! AN lr nnJOY lUb

/[- ACRS HOLDING.'SENT 7910810 9 / O

[

k

/ 4

]WS

  • a.,.,

/%

rewra roe rooonass

ET:iOPCLITAN EDISON COMPANY 23T OE:'CE 2CX 342 READING, PENNSYLVANI A 15603 TELEPHONE 215 - 929 3601

[.h-June h, 1975 l' /

c.

GQL 1116

'f

'A4 /'

? 7~

v,,.g.

-f j m. ;[ *3 s y$M N, y

Q r--

m 1 g,$ M 2 g

s U

D p'

Mr. A. Giambusso, Director Division of Reactor Licensing g

th,

U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Giambusso:

q Ihree Mile Island Nuclear Station Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 This letter is with regard to TMI-l Technical Specification Change Request (T.S.C.R.) No. 9 - which change concerns revisions to the TMI-l Power vs.

Rod Withdrawal Limit Curves based on additional ejected rod worth analyses-and serves to 1.

state our understanding ut the status of the subject change request, and 2.

based on our understanding, stat;e our present intentions regarding the continued operation of TMI-1.

With regard to item number 1., based on conversations that our Messrs.

Lawyer and Grace have had with your E. Jaffe and Dr. Eridges, it is our understanding that at this time your office has no further unresolved concerns regarding the technical adequacy of the change request; anticipates being able to act favorably on the subject change request; and anticipates being able to issue the change request as an amendment to our operating licenso as soon as possible after June 4,1975.

With regard to item number 2., in light of (a) our understanding as expressed above and (b) the f act that we presently anticipate completing the currently in process maintenance / control rod interchange outage by June 5,1975, please be informed that we currently intend to 1.

commence heat-up of the prima y system sometime on or af ter June 5,1975, 2.

following heat-up, conduct zero power physics tests, part 1539 167 j_ - n 61/7

.h of which will encompass ejected rod worth measurements to further verify the adequacy of the subject Power vs.

Rod Withdrawal Limit curves (ref: TMI-1 T.S.C.R. No. 9) 3.

provided the ejected rod worth measurements fall within an acceptable range of values, conduct the remainder of the routine p.hysics testing (note: the physics testing of items

2. and 3. is expected to last a total of five or six days) 4.

following completion of the routine physics testing, proceed with normal full power operations, and 5.

conduct all operations above within the most restrictive of both the existing Technical Specification Power vs. Rod Withdrawal limits and those proposed in T.S.C.R. No. 9 so as to meet the intended requirements of Technical Specification 3.5.2.5 and thereby ensure meeting the ejected rod worth limits of Technical Specification 3.5.2.3.

We trust that with this submittal we have adequately communicated our undar-standing of the status of IMI-1 T.S.C.R. No. 9, and our intentions re-garding the continued operation of TMI-1.

Should you, however, have any additional questions or concerns, please do not hesitate to contact me.

Sincerely, R. C.

rnold Vice President RCA:DNG:tas File: 7 7.h.3.3.1

/ 20.1.1 q

r

)

}UO sui

.