ML19210A815
| ML19210A815 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/14/1975 |
| From: | Arnold R METROPOLITAN EDISON CO. |
| To: | Anthony Giambusso US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19210A816 | List: |
| References | |
| NUDOCS 7910310707 | |
| Download: ML19210A815 (3) | |
Text
-
j NRCn RIBUTION FOR PART 50 DOCK" _ ATEPIAL (TEMPORARY FORM) 5 398 CONTROL NO:
FILE:
FROM:
Metropolitan Edison C DATE OF COC DATE REC'D LTR TWX RPT OTHER Reading, Pa
^
R C Arnoldd 5-14-75 5-16-75 n
TO*.
~
Mr Giambusso 3 signed y
SENT LOCAL POR H
CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
l000at 3
50-289 DESCRIPTION:
ENCLOSURES:
- 6 Ltr notarized 5-14-75...trans the following:
Amde to OL/ Change to Tech Specs; Consisting of revisions to Appendix A.'...& effects th'e
,^'ng Tendon Surveillance program requirements....
(40 cys enci ree'd) h eW1 dQGED -
PLANT NAME:
FOR ACTION /INFORMATION 5-16-75 ehf BUTLER (L)
SCHWENCER (L) ZIEMANN (L)
REG AN (E)
W/ Copies W/ Copies W/ Copies W/ Copies CLARK (L)
STOLZ (L)
DICKER (E)
LEA
/ W@fl (L)
W/ Copies W/ Copies W/ Copies Cocies pr.a n a i vassa; in p 3 min u nyq ig,.
spr. 3 W/ Copies W/ Copics W/ Copies W/ Copies KNIEL (L)
PURPLE (L)
YOUNGB LOOD (E)
LICIMSII:0 PROJECT MANAGER
_ / Copics W/, Copies W/ Copies W/ Copies W
INTERNAL DISTRIBUTION NG FILK TECH REVIEW DENTON LIC ASST.
_A/_T I N D.
C.NRC PDri SCHROEDER GRIMES R. DIGGS (L)
BR AITi.iAN f0GC, ROOM P 506A MACCARY GAMMILL H. GEARIN (L)
SALTZMAN GOSSICK/STAF F KNIGHT KASTNER E. GOU LBOURNE (L)
MELTZ f CASE DAWLICKI BALLARD P. KREUTZER (E)
GIAMBUSSO SHAO SPANGLER J. LEE (L)
PLANS BOYD STELLO M. MAIG RET (L)
MCDONALD MOORE (L)
HOUSTON
_ ENVIRO S. REEO (E)
CHAPMAN DEYOUNG (L)
NOVAK MULLER M. SERVICE (L)
DUBE (Ltr)
SKOVHOLT (L)
ROSS DICKER S. SHEPPARD (L)
E. COUPE GOLLER (L) (Ltr)
IPPO LITO KNIGHTON M. SLATER (E)
PETERSON P. COL LINS TEDESCO YOUNG 8LOOD H. SMITH (L)
HARTFIELD (2)
DENISE J. COLLINS REGAN
,s. TEETS (L)
KLECKER REG OPR LAINAS PROJECT G. WI LLI AMS (E)
EISENHUT
_ 8e.ve.LDR
' / FILE & REGION (2)
BENAROYA
~
V. WILSON (L)
WlGGINTON MPIC VOLLMER
' HAH LESS R. INGRAM (L)
STEELE i
. EXTERNAL DISTRIBUTION y
l - LOCAL PD R M a > w.s bu v,3, E f
r1 - TIC (ABERN ATHY) (1)(2)(10)- NATIONAL LABS 1 - PD R SAN /LA.'NY 1 - NSIC (SUCHANAN) 1 - W. PENNI :GTO.'J. Rm E 201 GT 1 - BROOKH AVEN : AT LAS f 1 - ASLB 1 - CONSU LTANVS 1 - G. ULRIKSON. ORT L 1, Newton Anderson NEWM AR K/3 LUM E/AG 8 ABI AN 1 - AGMED (RUTH GCS$.iAN)
-/4/- ACRS MO' 9 J ~/SENT Rm B-127 GT 76 6 M ge,hJ 1
.J. D. RUNK LE'S', Rru E 201 jro9 150
~
707 F
7910310
i
.2GULATORY DOC 78ILE COPY N}7%H WC--m METROPOLITAN EDISON COMPANY PCST CFFICE BOX 542 READING, PENNSYLVANI A 19603 TELEPHONE 215 - 929-3601 May 14,1975
, 3. ~
zy D
Ts., p
\\&
sac
/[
Nyh f',
Mr. A. Giambusso, Director if 7
Division of Reactor Licensing
-j 1
o g
[6 U.S. Nuclear Regulatory Commiss p%
u-o.s. 'Oh* gc
[p/.
,Q Washington, D.C.
20555
.a s,
s
Dear Mr. Giambusso:
D/ / Q g t cof-Three Mile Island Nuclear tation Unit 1 Docket No. 50-289 Operating Licence No. DPR-50 Technical Specification Change Request No.11 Attached are three signed originals and thirty-seven copies of Technical Specification Change Request No.11, requesting amendment to Appendix A of Operating License No. DPR-50. As a part of this request, proposed replacement pages for Appendix A are attached.
Also attached is one signed copy of a certificate of service of Technical Specification Change Request No.11 to the chief executives of the township and county in which the facility is located.
Please note that part of the enclosed change request serves to alter the Tendon Surveillance program requirements so as to change some of the specific tendons to be tested. This change is necessary in that it has been discovered that some of the tendons originally scheduled for surveil-lance testing are inaccessible to our testing equipment, and to test them could require extreme, inappropriate measures such as chipping of concrete.
Further, please be advised that:
- a. the next Tendon Surveillance Inspection is currently scheduled to begin June 10, 1975, and it is anticipated that it will last for 8 to 9 weeks,
- b. for reasons as stated in the enclosed change request, this change has been determined to not constitute an unreviewed safety question,
- c. due to the previously referenced inaccessibility of some of the tendons, our current intentions are to perform the inspection in accordance with the requirements of the enclosed change request, and
- d. in light of a. b. and c. above, it is therefore requested that the Nuclear Regulatory Commission act on this request by June 4,1975.
- Cj
)gnn lJ J07
_2_
We trust that with this submittal we have adequately communicated our need for the subject Technical Specification change, and that it contains an adequate safety analysis to justify making the change. Should you, however, have any additional questions or concerns, please contact me.
Sincerely, I
R. C. Arnold Vice President RCA:RSB:cas File:
20.1.1/7.7.3.3.1 I
J o' y
.32
.