Text

'^

8

  • EGLLATCWY I '.F C E M A T I O N C I S i e IB U T ICis SYSTL* (RIDS)

DIbimIcLTIUF FLd INCL *1AG MATEWIAL 50-209 REC MCDCNate w G csG: wtweEIN JG OCCoATE: 02/10/79 AnC

  • ETWUPut EDISCN CATE WCVC8 C2/14/76 00CTYPE LETTtR NCIARIZEC 60 COPIES RECEIVEC SUBJECit LTE 1 ENCL 1 MUNTHLy CPEN A II' G EtEURT F0E THE MCNTm CF JANUARY 1978, PLANT Naut: IwwEE FILE ISLANC = UNIT 1 REVIEWE8 IkITIAL:

xEF CISTRIBUTCA INITIAL!

                                  • CIS1hIeLTICa CF TMla = ATE 8IAL Ib AS FULLcwS ******************

NCNTmLY GPLQATIAG NEPCRT FOR GRAY decn DREPARATILh, (0ISidIduTIC4 CCuE A003)

FCd ACl! UNI cEAhCW CHIE WEIO**W/2 ENCL INTENNAL:

' f t 5 * * '.r..

NRC pop ***/ ENCL MIPC FCA ACTICN**a/2 ENCL EXTERAAL:

LADEt3 PARaISeuRG, Pa***/ ENCL TIC ***/tsCL NSICoes/ ENCL BNL(NATLad)***/ ENCL ACm!

CAT e**a/0 ENCL 15;9 072 DISTEleviICr.

LTE 10 ENCL 1G C C A. T R C L ARat 160ue0254 SIZEt id+5p

~

7910310 b77 J3 m

s

NJ f76 a,

u9M, me a nxnss METROPOLI FAN EDISON COMPANY POST OFFICE BOX 542 READING, PENNSYLVANI A 19603 TELEPHONE 215 - 929 3601 February 10, 1978 SQL 0199 7-

.3 Director of Nuclear Reactor Regulation v,3,.,.,

Attn:

Mr. W. G. Mcdonald, Director y,

Office of Management Information & Program Control U. S. Nuclear Regulatcry Cc==issien Washingten, D. C. 20555 Operating License No. DPR-50 Docket No. 50-289 Enclosed please find the January Operating Status Report for Three Mile Island Nuclear Station Unit 1.

^1.cerely, J. G Herbein Vice President-Generation JGH:DGM:ejg Enclosure ec:

Mr. J. P. O'Reilly, Director Office of Inspection & Enforcement, Regicn 1 U. S. Nuclear Regulatory Ccc=ission 631 Park Avenue King of Prussia, Pennsylvania 19hC6 b

4 0

A0

'(

i 78046034

TMI-l CPERATING SU'C!ARY January 1978 Unit Performance The Unit operated at essentially 100% full power for the entire month except for the brief unplanned power reductica to 88% power on 01-07-78 due to a heatet drain pump seal failure and the planned power reduction to 50% power en 01-27-73 to conduct turbine stop valve testing and shift into an all-reds-out mode of operation.

The new comprehensive In-Service-Inspection program as required by 10 CFR 50.55a vent into effect this scnth requiring extensive operational testing of safety re-lated pumps and valves.

Sicnificant Pcver Reductions The Unit was reduced to about 88% power en 01-07-78 as a result of the seal failure en HD-F13.

Because ED-PlA was being overhauled when the "B" pump seal failed, only ED-Plc was available, resulting in the reduction of total feedvater flow to the steam generators. The overhaul of ED-PlA was cc=pleted and the Unit was returned to 100%

power within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

The Unit was reduced to about 50% power on 01-27-78 to conduct the turbine step valve testing. While at 50% power the Reactor Centrol Rods were withdrawn to an "All-Rods-Cut" configuration as part of the planned end of cycle mode of operation.

The Unit was returned to 100% power in 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br />.

I O

fId sU/

J'

TMI-1 OPERATING SUICIARY January 1978 Unit Performance The Unit operated at essentially 100", full power for the entire month except for the brief unplanned power reduction to 885 power on 01-07-78 due to a heater drain pump seal failure and the planned power reduction to 50", power on 01-27-78 to conduct turbine stop valve testing and shift into an all-rods-cut mode of operation.

The new comprehensive In-Service-Inspection program as required by 10 CFR 50.55a vent into effect this =onth requiring extensive operational testing of safety re-lated pumps and valves.

Sirnificant Power Reductions The Unit was reduced to about 88% power on 01-07-78 as a result of the seal failure on HD-F13.

Because HD-P1A was being overhauled when the "B" pump seal failed, only HD-Plc was available, resulting in the reduction of total feedwater flow to the steam generators. The overhaul of HD-P1A was ec=pleted and the Unit was returned to 100",

power within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

The Unit was reduced to about 50% power on 01-27-78 to conduct the turbine stop valve testing. While at 50", power the Reactor Control Rods were withdrawn to an "All-Rods-Out" configuration as part of the planned end of cycle mode of operation.

The Unit was returned to 100% power in 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br />.

e 1JJ /

. 8

%