ML19210A713

From kanterella
Jump to navigation Jump to search
Forwards Tech Spec Change Request 30,Amend 1,to DPR-50, App A,& Certificate of Svc.W/O Encl
ML19210A713
Person / Time
Site: Crane Constellation icon.png
Issue date: 02/11/1976
From: Arnold R
METROPOLITAN EDISON CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
GQL-0159, GQL-159, NUDOCS 7910310532
Download: ML19210A713 (2)


Text

NRC, hu 11:5 U.S. NUCLE AR REGULATORY.

T JN DOCKET NUMBE P.

e.,.

50-289 NRC DISTRf BUTION FOR PART 50 DOCKET MATERI AL

^ '

Metropolitan Edison Co.

2-11-76 R.W. Reid Reading, Pa.

ATE RECEIVED R.C. Arnold 2-12-76 OLETTsR O N OTO RIZ E D PROP INPUT FORM NUMBER OF COPIES RECEIVED OX)RIGIN AL

@ UNC LASCIFIE D OCOPY 37 DESCRIPTION ENCLOSU R E Ltr. notarized 2-11-76...trans the following.

Proposed Amdt. # 1 to OL/Chege # 30 to the Tech. Spec; Consisting nf' revisions to Tech.

Specs, with regard to Appendix A of OL # DPR-

50.....W/ Proposed Replacement pages for appen-dix A...

(37 Cys. Received)

Certificate of Service showing service upon Local Officials...

s.

M S8 DO NOT RIDMOVE PLANT NAME:Three Mile Island # 1 S A F 2T'_'

FOR ACTION /lNFORMATION 2.lVIRO Mb 4 = 1c= / b AST10NEO.'.3 ASSIGNED.'.2.-

~

3

/

dRANCH CNIE7 :

Keld W/b BRANCH C1.ICF.

IgJECT 1% NAGER:

PROJECT MANAGER s dlC. ASYT. :

Ingram LIC. ASST...__,

INTERNAL DISTRIBUTION TREG PTLD JYSTEMS SAbsTY PT ANT 9YRTEMk v

FWTun 'rvcu HRC PDR imnEMAN TFDP4cn ERNST

  1. _& E scHROFDER LENAROYA BALLARD I

7 v

0 ELD LAINAS SPANCLER

/ COSSICK & STAFF ENGINEERIljG IPPOLITO MI2C MAccARy SITE TECH

__ CASE KNIGHT OPERATING REALTORS GAMMILL

__lWHAIJER SIEWEIL STELLO STEPP I!ARLESS PAWLICKI HUU1AN OPERATING TECH PROJECT MANAGEMENT REACTOR SAFETY

'EISENHtrr SITE APALYSIS BOYD ROSS

-0FAO VOLUER P. COLLINS NOVAK

--BAER BUNCH HOUSTON ROSZTOCZY

'5CHWENCER J. COLLINS w

PETERSON CHECK g- -'URIFES KREGER tjELTZ llELTEMES AT & I SITE SAFETY &_ENVIRC SKOVHOLT SALTZPAN ANALYSIS RITTRERG DENTON & MULLE3 EXTERNAL DISTRIBUTION L11DR; Harrisburg, Pi NATL L\\B BR00Kl'1VEN NATL LAB ~

CONTROL NUMBER

' TIC REG. V-IE ULRIKSON(ORNL) e

-'?*S.I C LA PDR 1397 ASLB CONSULTANTS d,S 16 ittg[gyg to L.A.

y 490 313

' "' "3 2 0 " Y '

. r one. 1ss (2 7s:

1 N.O S2.c.!A_

L__ j '

CYe cOfc_ c-l 4,

,*]7_f_,

efid -40 f

27M (n98

' ~ ~ ~

g METROPOLITAN EDISON COMPANY susuotARY Of GE?dERAL PUBLIC UTILITIES CCRPORATin')

i q,7 e

cv, POST OFFICE BOX 542 READING, PENNSYLVANI A 19603 N

929-3601 g

February 11, 197 3

GQL 0159 3

.g ggl'2,gs

-lg g

iszs >

Director of Nuclear Reactor Regulation 2

Attn: R. W. Reid, Chief i Ac u

s.<*,.

Operating Reactors Branch No. 4 4 S*

D*** "

6

'U. S. Nuclear Regulatory Commission

[b Washington, D. C.

20555 co

-4

'IHREE MILE ISLAND NUCLEAR STATION, UNIT 1 (

-1)

DOCKET NO. 50-289 OPERATING LICENSE NO. DPR-50 TECHNICAL SPECIFICATION CHANGE REQUEST No.30, AMENDMENT NO.1

Dear Sir:

Enclosed are three signed originals (thirty-seven conformed copies sent separately) of Technical Specification Change Request No. 30, Amendment 1, requesting amendment to Appendix A of Operating License No. DPR-50.

As a part of this requnst, proposed replacement pages for Appendix A are enclosed.

Also enclosed is one signed copy of Certificate of Service for proposed Technical Specification Change Request No. 30, Amendment 1, to the chief executives of the township and county in which the facility is located.

This amendment serves to modify our previous Change Request No. 30 to reflect the actual Cycle 1 burnup achieved.

We are aware that you require 90 days in which to review a reload request and as a result of telephone conversations with Dr. D. Bridges of your office we understand that the 90 day period began with the date of our original sub-mittal on January 13, 1976 and is not changed by this submittal. If you are not in full agreement with this please inform me as soon as possible.

Sincerely,

k. C.

OLD VICE PRESIDENT RCA:CWS:rk

Enclosures:

1.

Technical Specification Change Request No. 30, Amendment 1 Specification proposed changed pages, ii.

Certificate of Service for Technical Specification Change Request No. 30, Amendment 1 iii.

Babcock & Wilcox Cycle 2 Reload Report (Based on a Cycle 1 Burnup of 466 10EFPD) 1490 314