Notifies That Decay Heat Pump 1A Ran in Excess of 1-h at Over 550 Gallons Per Minutes During Modified Program for Vibration Test & Ultrasonic Insp of Installed Decay Heat Pump Shafts.Not Consistent W/Level Permitted in
ML19210A670
Person / Time
Site: Crane Constellation icon.png
Issue date: 02/10/1978
From: Herbein J
METROPOLITAN EDISON CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
GQL-0198, GQL-198, NUDOCS 7910300700
Download: ML19210A670 (3)


Text

.

= E a t.L A T C - Y INF0H r1 A T ION DISTWI9uTICN dTSTEM (cIDS)

OIST4f et: TION Fun INCC*1NG NalEWIaL 50-234 REC KEIU R a LWbl btWeEIN JG DCCOATE: 02/10/7d NHC 4hiEuPLL EDISCN CATE kCVCl 02/14/75 00C TYPE: LEITER NCTARTZEC NU CCPIES kECEIVEC SudJECT L TG 1 EACL 1 RE3PL4SE TC NaC L1E CIC 12/2//7 FUENIdaING IhFL CUNCERNING PCDIFIEC P r< C h 2 A " FuG VIRwATIUN TESTING A r, C LLTkASCNIC IN3DEC1IUN CF CuhmE*TLT I N S T A L.L 6 0 CLCAy wtAi PLNP SNA>TS, UNIT 1 EEVIEFE8 th!TIALI xEF PLANT NA*EllkREE MILE ISLANC DISTAIBUTCG INITIAL:

                                  • CISTEleLIICN LF THIS wATEnIAL IS AS EnLLC*S ******************

GENEMAL UISTm!6L11LN FCE AFTER ISSLA>.CE OF C9EnaTING LICENSE.

( C I S T 418 u T 10 t4 CCDE A001)

FUN ACTIuN e n A N C $. e m t0***/7 ENCL INTEkNAL:

rTLE**a/

CL NRC PCR***/ ENCL 1 's E R O I'fRl"C uELO**LTA CNLY NANAuER***/ ENCL LNEC<**k/ ENCL EI5ENktT***/tNCL SMA0**w/ ENCL oAER***/ ENCL eLTLEE**w/ ENCL bRIFES***/ ENCL J CCLLIAS***/ ENCL J. "CGCUGb**a/ ENCL EtlENSAL:

LAUN'S Hapa!SdLWu, PA***/ ENCL TICa**/ ENCL wSIC**n/ ENCL ACkS CAT d**a/io ENCL 1490 117 OISikleVi1CN:

LTA do ENCL 39 CCNTRCL N8at 780460255 SIZLt 2W V

0' 7910300 7 0 0

=92J tw I:wom MMIM/00P40Gof33 4

MEITROPOLIFAN EDISON COMPANY POST OFFICE BOX 542 READING, PENNSYLVANI A 19603 TELEPHONE 215 - 929-3601h'-

February 10, 1978

~

GQL 0198 77';

[~_," '

2.

Director of :Tuclear Reactor Regulation

t.,

12 Attn:

R. W. Reid, Chief

,,.?

Operating Reactors Branch :To.h

-- ^

y.

U.S. Nuclear Regulatory Cc==ission Washington, D.C.

20555

].j..

Dear Gir:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Docket No. 50-289 Operating License No. DPR-50 Decay Heat Pumps Your letter of December 2,1977, granted approval of a mcdified program for vibration testing and ultrasonic inspection of the currently installed decay heat pump shafts that we had requested in our letter of October 27, 1977, Gol 1477, subject to your revision / clarification.

This letter is to inform you that DH-P1A vas run in excess of one hour at great'er than 550 gpm in a manner not quite censistent with that permitted in your letter of December 2, 1977 The DH-P1A chronclogy of testing events was as follows:

Time Time Start Stop Date Ccrments N/A N/A 12/05/77 Last pump Vibration / Ultrasonic test 4 7

ccmpleted satisfactorily.

0309 Oh20 01/11/78 First ISI Surveillance Test - Vibration data was recorded. incorrectly necessitating veri-fication run.

Times not available 01/11/78 Engineered Safeguards Surveillance Testing.

(Approximately 9 minute run) 2137 2230 01/11/78 Second ISI Surveillance Test. Verified that pump was acceptable and that previous vibration data had = cst li.<ely been recorded on vreng scale. Shift Superviser secured DH-PIA operation until Vibration /Ultrascnic program ccepleted cn 01/13/78.

1490 118 Total cumulative DH-P1A run time @ > 550 gym - 133 minutes Total cumulative DH-Pla run time @ < 550 sp= - none N/A N/A 01/13/78 Pump Vibratic,n/ Ultrasonic testing c- '.pleted ' g satisfactcrily.

p\\

78046025=;

O O

February 10, 1978 P. W. REID GQL 0198 Althctgh DH-P1A was restarted after having accumulated in excess of one hour of operation at greater than 550 gym, it was done in order to attain the objectives of the run, i.e., verifying acceptable operation of the pump.

S'_nce particular pump ISI tests require bearing temperatures, the pumps have to be run longer to obtain the bearing temperatures than for taking just vibration data.

In view of this requirement, Met-Ed is requesting that the greater than 550 gym accumulated run time be increasef to three hours in Order to prevent a recurrence of the above situation. Furthert.e, this increased accumulated run time shculd facilitate the monthly ISI testing between the quarterly Vibration /Ultrasenic testing.

Sincerely,

/

J. G. Herbein Vice President - Generaticn JGH:RJS:Jmr 1490 119