ML19210A666

From kanterella
Jump to navigation Jump to search
Forwards Info on Individual at Reactor Site Responsible for Completing Standby Diesel Generator Units Questionnaire, Completed Questionnaire & TMI-1 Surveillance Procedures 1303-4.16,1303-11.10 & 1303-8.2.W/o Encl
ML19210A666
Person / Time
Site: Crane Constellation icon.png
Issue date: 01/20/1978
From: Herbein J
METROPOLITAN EDISON CO.
To:
Office of Nuclear Reactor Regulation
References
GQL-0078, GQL-78, NUDOCS 7910300696
Download: ML19210A666 (3)


Text

.

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DISTRIBUTION FOR INCOtIING MATERIAL 50-2S9 I

ORG: HERBEIN J G DOCDATE: 01/20/79 METROPOL EDISON DATE RCVD: 01/26/78

/PE: LETTER NOTARIZED: NO COPIES RECEIVED ECT:

LTR 1 ENCL 1

RDIf4G RESPONSE TO NRC"5 GUESTIONNAIRE CONCERNING STANDBY DIESEL GENERATOR 5

W/ATT NAME OF PERSON RESPONSIBLE FOR QUESTIONNAIRE, TMI-1 EILLANCE PROCEDURE 1505-4.16 TMI-1 SRVEILLANCE PROCEDURE 1503-11.10 AND 1 SURVEILLANCE PROCEDURE 150 f h f g' e.

T NAME: THREE MILE ISLAND - UNIT 1 REVIEWER INITIAL:

XJM DISTRIBUTOR INITIAL.

                          • DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ******************

ELIABILITY OF STANDBY DIESEL GENERATOR UNITS.

DISTRIBUTION CODE A014)

FOR ACTION:

Pe aC 'NJ{REID**W/7 ENCL

  1. T INTERNAL:

SE d LE**W/ENCE NRC PDR**W/ ENCL

  • '
  • Nn OELD**W/ ENCL HANAUER**W/ ENCL CHEOK**W/ ENCL EISENHUT**W/ ENCL SHAO**W/ ENCL BAER**W/ ENCL BUTLER **W/ ENCL GRIMES **W/ ENCL J.

COLLINS **W/ ENCL J.

MCGOUGH++W/ ENCL F.

CLEMENSON**W/ ENCL EXTEFNAL:

LPDR'S HARRISBURG, PA**W/ ENCL TIC **W/ ENCL NSIC+*W/ ENCL ACRS CAT B**W/16 ENCL 1490 109 1UTION:

LTR 40 ENCL 40 CONTROL NBR:

7802700?O c+S/4" 4 4 4 4-t-S *

  • 44 44 44-t 4 * +44 4-t4 * + + 4 THE END

+44*+**+444*************44****+444+

U 79108006fg g

AC)

L S.. e l w a q.

2

$2:,

na. - x ns

.,3...

r,,

--=-a~_

METROPOLi TAN EDISON COMPANY POST OFFICE BOX 542 READING, PENNSYLVANI A 19603 TELEPHONE 215 - 929 '601 s '.

GQL 0078 January 20, 1978 1~

Q AQ 1

~

.-j v.s. n, ' b 'N,

~

@l *:.:, ' ' : ** ,

m n,: s.' :'Y

+

n n.7 g

Di'.-e: tor of :Inclear Reactor Regulatiot U. S. Iluclear Regulatory Cct=ission

- -)),

Washington, D. C.

20555

..../

Dear Sir:

Three Mile Island Iluelear Station, Unit 1 Operating License !!o. DPR-50 Docket :Ic. 50-289 Standby Diesel Generator Units Questionnaire Enclosed is (1) a separate sheet containing the name, address and phone number of the person at the reactor site responsible for completing the questionnaire, (2) our completed questionnaire, (3) nE-1 Surveillance Procedure 1303-4.16,(4) nc-1 Surveillance Procedure 1303-11.10 and (5) nE-1 Surveillance Proccdure 1301-3.2.

Sincerely, l

J.G!barbein Vice P.esident-Generation v

JGF.:DGM:dkf Enclos'res 760270030 IS 1490 110 pt n n

E F.S lG C G.

Person Responsible for Ccepletion of the Diesel Generatcr ?aestiormaire:

, f. A. Kunder c

Metropolitan Edison Cc=pany Three Mile Island Nuclear Station P.O. Box h80

'tiddletovn, "ennsvivania 170>7 717-9hh h0h1 1490 ill