ML19210A628
| ML19210A628 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 01/05/1978 |
| From: | Herbein J METROPOLITAN EDISON CO. |
| To: | Reid R Office of Nuclear Reactor Regulation |
| References | |
| GQL-0009, GQL-9, NUDOCS 7910300662 | |
| Download: ML19210A628 (2) | |
Text
DISTRIBUTION AFTER ISSUANCE OF OPERATING LICENSE NRC PCRu 195 U.S. NUCLEA A RECULATCRY CO N
CCCLET NUM8ER go AQ q
- . m
~
NRC DISTRIBUTION FCR PART 50 DOCKET MATERIAL l
ROM:
CATE OF CCCUMENT Mr. R. W. Reid Met Ed 01/05/78 I
Reading, Pa.
19603 J. G. Herbein IQO CA E
%ETTER ONOTORIZEO PRCP INPUT FORM NUMBER CF CCPIES RECELVEO RIGIN A L NC LASSIFI E D I
c, ; a ne o
" c ="
OESCPIFTION EN CLOSU R E Consists of info. re torsional Critical Speed analysis on Decay Heat Pump Shafts..
I h
1492 229
(-"
PLANT NAME. Three Mile Island Unit No. 1 RJL 1/11/78 SAFETY FOR ACTION /INFORMATION i
i IBRANCH CEIEF: (7) i M f i d_
1 I
I i
l i
I l
l l
i l
I _ s M
T INTERNAL DISTRIBUTION l
T 70 F'-6%
i i i
j l
Anc enf-1 I I
i l
i c.
e (,3 I I i
i
! I I
l l
on, imiwro 1 1 I i i
i Purr'?
I l l
1 I
i r* c 1.mm I i l
t l
l j
i suso I :
i I I
I l
3 m a r7 i
i i i
1 5tm ro i
t i l
i ERTurt i I i i l
l 1
IJ. COLLI'S I I I I I
I
- d. VCCOUCR I i i i i
i l I i l l
I I
i i l
l I
i l
1 I
l 1
i i
i i i i
l i
i I
I I
4 l
t l
l i
8 e
i E.'gERNAL OlSTRIBUTICN CONTROL NUMBER I
LFOR: N A r r i S b u re. ' t'R.
6 i
/,7
~
IIC i# I i '
730110124 NSIC I '
i a
g i ACRS 10 CYS SENT CAIETR7 D
l 1
~
791030g f g gi i i i
&,.q}
h((
j
=
m METROPOLITAN EDISON COMPANY POST OFFICE BOX 542 READING, PENNSYLVANI A 19603 TELEPHONE 215 - 9 3 0601 January 5, 1978
~
GQL 0009
~
^
,%., -4 uyQ1 Director of Nuclear Reactor Regulation S,.7 b il Attn:
R. W. Reid, Chief i _'
-1
/"
Operating Reactors Branch No. h
~
u.,, Mf%[. " )D 1
- 'k
'C*r
/
U. S. Nuclear Regulatory Cennission Washington, D.C 20555
\\,,
g/
Q* l.
- 99 \\
Dear Sir:
Three Mile Island Nuclear Station Unit 1 (TMI-1)
Docket No. 50-280 Operating License No. DPR-50 Decay Heat Dump Shafts Metropolitan Edison Cc=pany letter GQL 1h77, October 27, 1977, stated that a torsional vibration analysis would be performed to provide further assurance that torsional critical speeds are not a problem with respect to imposing significant torsional loads on the shafts.
Werthington Corporation has performed a torsional critical speed analysis, which we received en December 8, 1977. As a result of their analysis, Werthington Corporatien has stated.nat since the torsional critical speed is apprcximately three times the rotative speed, torsional excitation is not a problem with these pumps. Met-Ed has reviewed the detailed analysis and concurs with Worthingten that torsional excitation is not a problem.
Sincerelv, A
J. G. Herbein Vice President-Generation JGE:RJS:tas 1492 230 7801 o