ML19210A554
| ML19210A554 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 02/09/1978 |
| From: | Herbein J METROPOLITAN EDISON CO. |
| To: | Reid R Office of Nuclear Reactor Regulation |
| References | |
| GQL-0204, GQL-204, NUDOCS 7910300594 | |
| Download: ML19210A554 (2) | |
Text
.'
REGULATORY INFORMATION DISTRIEUTION SYSTEM (RID'E)
DIS TRIBUTION FOR INCOMING MATERIAL 50-289 FEC: FEID R W ORG. HEREEIN J G DOCDATE: 02./09D9 NRC METF0FOL EDISCN DATE RCD: 02/12/'?
DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED LTR 1 ENCL 0
SUBJECT:
FORWARDING COPY OF THE SECOND TENDON SURVEILLANCE TEST OF THE REACTOR CONTAINMENT GLDG THREE YEARS AFTER S.I.T.
fb a
REVIEWER INITIAL:
XJM PLANT NAME: THREE MILE ISLAND - UNIT 1 DISTRIBUTOR INITIAL:
- ++***++******** DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS
- +4 GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LICENSE.
(DISTRIBUTION CODE AOO1)
FOR ACTION:
ERANCH 9'"
CCTW&
~' ONLY(7)
D INTERNAL:
c W, cTLE**LTR ONLY(1)
NRC PDR**LTR ONLY(1)
OELD**LTR ONLY(1)
I & E++Lin t..
i._>
HANAUER**LTR ONLY(1)
CHECK **LTR ONLY(1)
EISENHUT**LTR ONLY(1)
SHAO**LTR ONLY(1)
BAER**LTR ONLY(1)
BUTLER *4LTR ONLY(1)
GRIMES **LTR ONLY(1)
J COLLINS **LTR ONLY(1)
J.
NCGOUGH**LTR ONLY(1)
EXTERNAL:
LPDR'S HARRISElJRG, PA**LTR ONLY(1)
TIC **LTR ONLY(1)
NSIC**LTR ONLY(1)
ACRS CAT B**LTR ONLY(16) 1488 105 DISTRIBUTION:
LTR 40 ENCL 0 CONTROL NER:
7SO4400'M SIZE.
1P+1.4" 4 4 4 4 * ++
- 4 4 * + w + + + + + + + + + + + + + + + + + + + +
- THE END
+++++++++***+**++4*+-$**+4*++a44~
~
m' w#
7910309pp
[
h
'{ f j Tj9;,,-
u _.,
n o* rca s.oonass pt
?
- 19..c 0,,.. :
4. :..u a METROPOLil'AN EDISON COMPANY POST OFFICE BOX 542 RE 4ntNG, FENNSYLV ANI A 19CO3 TELEPHONE 215 - 929 3601 February 9, 1973 GQL 020h Director of :luelear Reactor Regulatien Attn:
R. 'd.
Reid, Chief
/>
%,,,[b,. -',
Operating Reactors Branch :1o. h
~
U. 3. Nuclear Regulatory Cc=missicn
(
'4ashington, D. C.
20555
Q
),
n>
Dear Sir:
'"hree Mile Island Nuclear Station, Unit 1 (TMI-1)
Cperating License No. DPR-50 Docket No. 50-289 Selosed please find h0 copies of the seccnd Tendon Surveillance Test of the Reactor ContMntent Building, Three Years After S.I.T.
This sub-mittal is in accordance with the requirements of Technical Specifications Section h.4.2.1.
- ncerely,
\\
-/
J. G. Herbein
/
Vice President-Generation
/
/
JGH:DCM:cjg
/
helesure 1488 106
/$0440051
[i4D i