Forwards Tech Spec Change Request 32 Requesting Amend to App a Re TMI-1 Surveillance Holder Tube Rept. App H Exemption Requested Separately.Certificate of Svc Encl
ML19210A546
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/23/1976
From: Arnold R
METROPOLITAN EDISON CO.
To: Reid R
Office of Nuclear Reactor Regulation
Shared Package
ML19210A547 List:
References
GQL-0440, GQL-440, NUDOCS 7910300586
Download: ML19210A546 (4)


Text

U.S. NUCL EA R REGULATORY COP ION DOCKET NUMBER NRC FOw 193 (2 76) f (

2 y L/

NRC DISTRIBUTION FOR PART 50 DCCKET MATERIAL 4

lTO:

FROM:

DATE OF DOCUMENT 2,;g... _.. :i....

u DATE RECEIVED,,

l s

w 5 LETTER O NOTO RIZ E D PROP (NPUT FORM NUMBER OF COPIES RECEIVED DORIGINAL E UNC LASSIFI E D OCOPY

, CESCRIPTION EN C LOSU RE

.. eu..,

...,,,m

',.:.g...

-I"...

_~v

/ i.

? '- " _ s' c

d.O C.a i ~ i..,

O'

'" 2 " ). ' cts i

' 6 -. ! :

C y s ? *. J T.

J '. 3,. 7 C '.

', w c ',., c::c t r i. c '.D 1;4.88.071 PLANT NAME:

' zc

s-

..a

~

SAFETY FOR ACTION /INFORMATION ENVIRO m

Wi

~

ASSIGNED AD :

ASSIGNED AD :

Bf5NCH CHIEF :

kcid (6)

BRANCH CHIEF :

PROJECT MANAGER:

I f y,./ q c e-PROJECT MANAGER :

LIC. ASST. :

q p n -o LIC. ASST. :

~

N INTERNAL DISTRIBUTION I

A_

REG FILE T SYSTELS SAFETY PT Am' 9Ysa'r'n r w ru n Tem u URC PDR MEINryAN Tynpqcn ERNST i

/

I&E (t)

ScFROFDEq BENAROYA BALL 3RD i

OELD LAINAS SPANGLER I'

GOSSICK & STAFF ENGIMEERING IPPOLITO i

SITE TECH I

MIPC MAccany CASE KNIGHT OPERATING REACTORS GAF' MILL HAFAUER SIINEIL STELLO STEPP HARLESS PAWLICKI HULMAN i

OPERATING TECH l

PROJECT MANAGEMENT REACTOR SAFETY

/

EISENHUT SITE ANALYSIS BOYD ROSS

/

SHA0 VOLLMER P. COLLINS NOVAK BAER BUNCH HOUSTCN ROSZTOCZY

/

SC1NENCER

/

J. COLLINS i

PETERSON CHECK

/

GRIMES KREGER i

MELTZ l

HELTEMES AT & I SITE SAFETY & ENVIRC SKOVHOLT SALTZMAN ANALYSIS RUTBERG DENTON & MULLER I

EXTERNAL DISTRIBUTION CONT ROL NU*.13E R

/

LPDR: % -- - - < Is_

NATL _ LAB BROCKHAVEN NATL LAB

/

TIC REG. V-IE ULRIKSON(ORNL)

NS_IC LA PDR n

  • ASLB CONSULTANTS 5['

ACRS * - 120 TDT?iG/._SEM T 64 /r 7 ".- * - t "'

7' g

{

S NRC FORM 195(2 76)

We do not consider approval of this change necessary for Cycle 2 operation; however, approval of this enange at the same time as or immediately following approval of the above referenced exemption would serve to eliminate any potential confusion.

Your prompt action on this matter is therefore requested.

Sincerely, n/

/

. C. Arnold Vice President RCA:CWS:rk b

Attachments:

(1) Certificate of Service (2) Change Request No. 32 with proposed changed pages (3) Surveillance Holder Tube Report 1488 072 4

1a
:f14H METHOPOLil AN EDISON COMPANY POST OFFICE BOX 542 READING, PENNSYLVANIA 19603 TELEPHONE 215 - 929-3601 March 23, 1976 GQL 0440

~.

Director of Nuclear Reactor Regulation

/~

Attn.: R. Reid, Director

/.J Operating Reactors Branch No. 4 i;3 U. S. Nuclear Regulatory Commission 9s D

Washington, D. C. 20555

\\,

s

Dear Sir:

Three Mile Island Nuclear Station Unit 1 Docket No. 50-289 License No. DPR - 50 Technical Specification Change Request No. 32 Attached are three signed originals (thirty-seven conformed copies sent separately) of Technical Specification Change Request No. 32, reques ting amendment to Appendix A of Operating License No. DPR-50. As a part of this request, proposed replacement pages for Appendix A are also attached.

Also attached is one signed copy of a Certificate of Service of Technical Specification Change Request No. 32 to the chief executives of the township and county in which the facility is located.

Since TMI-l must be operated during Cycle 2 with the Reactor Vessel surveillance Capsules removed and 10CFRSC Appendix H appears to anticipate the continual presence of these Capsules in the vicinity of the core, an exemption to Appendix H paragraph II.C.2 is necessary. In this regard an exemption to Appendix H has been requested separately. It is, however, our understanding that you desire that Technical Specifications address the fact that the Surveillance Capsules are not to be installed for Cycle 2 operation but must be re-installed prior to Cycle 3 operation.

In addition, we are taking this opportunity to revise our surveillance capsule withdrawal times to conform to the schedule specified in Appendix H paragraph II.C.3.C, which applies to our vessel, and to clarify other requirements.

, :.~.

^

?~

y 0

d

[

a

's O

~ l 1488 073

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION IN THE MATTER OF DOCKET NO. 50-289 LICENSE NO. DPR-50 METROPOLITAN EDISON COMPANY This is to certify that a copy of Technical Specification Change Request No. 32 to Appendix A of the Operating License for Three Mile Island Nuclear Station Unit 1, dated March 23, 1976 and filed with the U.S.

Nuclear Regulatory Commission on March 23, 1976 has this 23rd day of March been served on the chief executives of Londonderry Township, Dauphin County, Pennsylvania and Dauphin Coun'.y, Pennsylvania by deposit in the United States mail, addressed as follows:

Mr. Weldon B. Arehart, Vice-Chairman Mr. Harry B. Reese, Jr.

Board of Supervisors of Board of County Commissioners Londonderry Township of Dauphin County R.D.

  1. 1, Geyers Church Road Dauphin County Court House Middletown, Penncylvania 17057 Harrisburg, Pennsylvania 17120 METROPOLITAN EDISON COMPANY

-)

-1 By:

Vice Pre M ent-Gene h n 1488 074