Notifies That Completion of Inservice Tendon Surveillance Program Delayed,Due to Difficulty in Obtaining Addl Ram to Perform Testing,Mechanical Reliability Problems of Existing Ram & Pickets & Inclement Weather
ML19210A498
Person / Time
Site: Crane Constellation icon.png
Issue date: 09/09/1977
From: Herbein J
METROPOLITAN EDISON CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
GQL-1238, NUDOCS 7910300535
Download: ML19210A498 (2)


Text

DISTRIBUTION AFTER ISSU* *E OF OPERATING LICENSE OC$KET NuM BE Rc

. NRC PoRu 195 u.s. NuctEAR REcutATony.

wssicN

=>

Nhc DISTRIBUTION poR PART 50 DCCKET MATERIAL R '4 Reid Metropolitcn Edison Co NNY TO:

Reading, Pa U^ 7 ' " ' C ' ' * *

  • J G Herbein

-. ~ -

9-13.<7 8

anE R C NOTCRIZE D PRCP INPUT PORM NUMBER OP COPtts mECElv!3 K h==RiciNAL

%setAssPiEm l

S;9maen

'~

"EScRIPTICN ENCLOSu R E Notification of tech specs violation in that inservice tendon aurveillance program was rot completed on time i

& advising that program will be completed.by 10 7-77

,1

  • h..., s,, ~ ~ ~'

,)

1p

,,[

1491 162 PLANT NAME:

Three Mile Island #1

.9.-13-77 ehf SAFETv FOR ACTION /INFORMATION I

I BRANr"i CHIEF: (7)

KCid l

1 I

__l I

i i

I7 T

I A

[

]

INTERNAL DISTRIBUTION l

1 REG FIl. V #

l l

l l

' 7.

.t i

l I I C E (2) i I

l l

lOELD 1

i i

I IHANAUER l

l l

1 i CHECK I I I

i iSTELLO i I t

iEISENHUT l I i

I iSHA0 l

l l

i lBAER I

l l

l l

l BUTLER l

l l

l

IGRIMES l

j {

{

j lJ. COLLINS I

l I

l i

i l l l

l I

i l l

l i

i i

l i

l I

I i

i i

i l i I

i I

i l l l

1

?

6 I

I I l I

i EXTERNAL DISTRIBUTICN CCNTROL NUM BER i

sLFDR:H A R E 5 b u K fA YA.

I s ITIC t f I I

/i K CC[) d-iNSTC i

l i

t i16 CYS ACRS SENT CATEGORY R

I t

i i

i i

7910300 5 3 S 4

/

f27M

,.;:?,

- -m n.

METROPOLITAN EDISON COMPANY.wssmu or manovwe vmmcs = m.-

POS1 OFFICE BOX 542 READING, PENNSYLVANI A 19603 TELEPHONE 215 - 929 3601 September 9, 1977 GQL 1238 I3 o

Director of I!uclear Reactor Regulations Attn:

R. W. Reid, Chief U. 3.

!uclear Regulatory Ccmmissien Washington, D.C.

20555

Dear Sir:

.b 0

b 2 tree Mile Island !!uelear Staticn, Unit 1 Cperating Licance !!o. DPR-50 Decket :!o. 50-239 The purpose of this letter is to inform your office of a situation which could be considered as not having met the requirements of TMI-1 Technical Specification L.h.2.1. " Inservice Tenden Surveillance Program".

Mcre specifically, please be advisea tl.c.t (a) because the Structural Integrity Test was completed on March 10, 197h, we censider the latest required completion date for tae current Inservice Tendon Surveillance Program to be September 10, 1977 (i.e., three years from March 10, 197h, plus an alleved 25", variance),

and (b) we currently anticipate ecmpleting the surveillance program by October 7, 1977 There are several factors which have caused the contracter delays in ecmpleting the surveillance censisting primarily of (a) difficulty in securing an additional ra= to perform the testing and problems with the mechanical reliability or the existing ram, (b) difficulty in securing spare parts, such as gaskets for each assembly cover, necessary to eceplete the surveillance, and (c) time lost due to pickets and inclement weather.

S

eraly, J

G.

.erbein ice President

}

JGH:DCM:iem 4 t) pt(bA b