ML19210A489

From kanterella
Jump to navigation Jump to search
Forwards Info on Reactor Bldg Design & Const,Supplementing 680627 Info Re 170-wire post-tensioning Tendons
ML19210A489
Person / Time
Site: Crane Constellation icon.png
Issue date: 10/09/1968
From: Neidig R
METROPOLITAN EDISON CO.
To: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19210A490 List:
References
NUDOCS 7910300527
Download: ML19210A489 (2)


Text

1

'^';

,,7'

)

p.-

v. s

.. J a a.c n

FROM:

OATE OF 00CUhENT:

DATE REC.DVED NO.3 Metrop411taa Edison Coupeur October 9. 1968 october 9. 1968 4535 gg g,

LTR.

hEMO:

FEPOR T:

QTHER:

(R. E. Beidid X

TO:

ORIG.:

CC:

QTHER:

Dr. Peter A. Morris 3 Siemed 60 conf'd cvs ACTION HECESSARY O

coaCuRRENcE O

o*TE *aswearo:

NO ACTION NECESSARY O ConeeEar O

eY:

CLA5S i F.:

POST OFFICE Fit.E CODE:

g REG. NO:

Tg.gg y

DESCAIPTION: ( Mvst le Unclos s dee l 7

REFERRED TO DATE RECEIVED BY DATE foliosing to supplement, info submitted Long 10-9 to ABC 6-27-683 concerning the 179 w/a eve se tur3/wrms wire post-tansimains tendons:

ENCtQsuREs:

Info copien to:

SWFF123sETAI, IMF0EMETION 05 REACTOR u _ 944 c. s. ee.u BUILDINC DES 1CN AMD CONSTRUCTION Dr. Morrin/Schroeder THERE M112 ISLAED WCLEAR STRTION n=d MET ED C0 Dube Mm L.._...... J.

  • ^ * * * '

(72 cys ree'd)

Moore T~-Il LIu 1-v A aGiit REMAR o:

1-formel_ file,,,,,s'Z1-suppi file DeToung(2 cys) 1-AEC PDR #

1-0CC U-M T 2-compliance 8-Esaring file Skovholt/Hally ACES-IS sys

    • ^"'""5"

""'S$ ' "

MAIL CONTROL FORMFORu AEgnes l

  • ......m. m T... m..,,, u : i....u 1491 130 7910300 62 [

WE. war

~

Metropolitan Edison Company P. o. Box 542 READING. PENNSYLVANIA 19603 October 9, 1968 Dr. Peter A. Morris Director Division of Reactor Licensing U. S. Atomic Energy Commission Washington, D. C.

20545

Dear Dr. Morris:

Re ulatcry Se, pi FI:s Cy.

g Reference Docket No. 50-289 On June 27, 1968, Metropolitan Edison Company submitted to the AEC information on the 170 wire post-tensioning tendons which it was proposing to use in the Reactcr Containment Building instead of the 90 wire post-tensioning tendons previously described in the application for a construction permit.

The e.;tached information further describes the 170 wire post-tensioning tendons. This information was presented to the Staff on October 2, 1968.

Very truly yours, iYu]

R. E. Neidig Vice President Attachments g:

lh,. z 1491 131 s.}?~~

_.d 4

POWER FOR PROGRESS 4535

.