ML19210A254

From kanterella
Jump to navigation Jump to search
Forwards LER 77-011/01T.Provides Supplemental Info
Date released: 08/12/2019 Download: ML19210A254


LER 77-011-01T:on 770519,engineered Safeguards Motor Control Center Tripped During Power Operation.Caused by Binding of a Phase Overload Device Tripping Stem.Preventive Maint Will Be Modified to Check for Tripping Stem Resetting
ML19210A255
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/02/1977
From: Potts W
METROPOLITAN EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19210A255 (1)
Forwards LER 77-011/01T.Provides Supplemental Info
ML19210A253
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/02/1977
From: Herbein J
METROPOLITAN EDISON CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19210A253 (4)