ML19210A236
| ML19210A236 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 09/29/1975 |
| From: | Arnold R METROPOLITAN EDISON CO. |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| GQL-1553, NUDOCS 7910240949 | |
| Download: ML19210A236 (3) | |
Text
pao 9 O A*E Cp 9QCLygNT O A YE * *CE.= ED NO r vracPoura EDISON Co.
G->73 9-29-73 soso4 I
LTR ME YO REPOR7 OYaEA
( ro ca.c a
CC OT-Ea NIN (MEE)
ACT,oN NECEssaav 0
co~cuaai~ct O
ca rE ANsnEsEa NO ACTt0N NECESSARY COWVENT C
CL A 55is PCST OF F ICE ev s'LE CCCE REG N3 Of 5CR#7'CN We 6e unciens.8,W REFER.ED TO D A TE RECElv f D 8v LATE DESIGN DEFICIENCY REPORT 4/ J DRExEn f f:_ W-///$/h 1
,h,d. d-M d $-
_E %.. 'SVRE >
. -e& U-
, ;l, i
,.!//. Y5 t
f REVASNS i
CDPT SENT TO REGION I 4
I U S NUCLE AR AEGutATCav COVW55 CN OPY N8C 3265 T. u @mo u'O!iiI !? [
il D
J r
AB of uuu a a a
1476 283 7910240 f
4
.e
&# 'I r;'LJ muexmams i
/
4 9
METROPOLITAN EDISON COMPANY : s omenz.vewucucununesccuenn= l i
/
POST OFFICE BOX 542 READING, PENNSYLVANI A 19603 TELEPHONE 215 - 929-3601 September 29, 1975 GQL 1553
.w ' '..
p r}.m.4f/ ?
g/,%, O. '%
,[',4.A Director Divisien of Reacter Licensing
?
-i U. S. Nuclear Regulatory Cc=issien
/c 1
Washington, D.C.
20555 m6 V
_e ;
seMc&r
'x.
- e%.g'4
?
p-
Dear Sir:
9 p'
V Docket No. 50-289 e
Operating License No. DPR-50 Three Mile Island Nuclear Statier Unit'l (TMI-1)
Pursuant to our letter of July 11, 1975, please be inf:rmed that as a result of analyses perfor ed on the rip rap of the dikes at TMI, the folleving deficiencies have been identified:
1.
In several areas the rip rap is s-al' - or thinner than criginally specified. To correct this situaticn, additional rip rap of the proper sice vill be placed in these areas.
2.
In one 225-fcot-long area just scuth of the Unit 2 intake structure the existence of a tce can net be verified due to the presence of a thick covering of spoil material.' To provide such verificaticn, a trench will be dug through the speil. If this excavatien reveals the presence of a tee, all spoil material covering the tce vill be re=cved; if it does not, a tce vill be placed.
3 In the area between the two intake structures and in ancther 250 rect-lens area just ncrth of the Unit 1 intake structure a tee prcbably dces not exist. To correct this situation, additicnal, coarse rip rap =aterial vill be placed at the base of the rip rap facing in these two areas to serve as a tee.
h.
In the area between the two intake structures and just ncrth cf the Unit 1 intake structure there is essentially no filter blanket present. This is net considered to represent a sericus situatien in that any a'diticnal d
rip rap which is placed en the facing to restore lost filter volume vill increase the thickness of the facing and thereby decrease the need for a filter; therefore, no attempt vill be made to replace the filter blanket in these areas except by the applicatien of additional rip rap to the dike facing.
T476-284
.J
..,/
x
-3Cb-7
~'
s k
-2 All of the repairs mentioned in items 1 through h above are expected to be ecmpleted by the end of 1975, river ccnditions and other facters per=itting.
In the meantire, a region-by-regien analysis perfor=ed,by cur censultants indicates that the existing rip rap facing of the dike vill be cdequate to withstand design flev velocities and wave heights.
We trust this succittal is adequate; however, should you have any questiens regarding this matter, please do not hesitate to centact =e.
Sincerely,
. /l 1
kI '1 C
lR. C. Arnold Vice President RCA:JFV:tas File:
20.1.1 / 7.7.h.1.1 0
.