Lists Results of Analysis on Rip Rap of TMI-1 Dikes,Noted in Met Ed .Completion Date for Repairs Expected by Year End.Ongoing Regional Analysis Indicates Existing Rip Rap Dike Facing Adequate to Withstand Wave Height
ML19210A236
Person / Time
Site: Crane Constellation icon.png
Issue date: 09/29/1975
From: Arnold R
METROPOLITAN EDISON CO.
To:
Office of Nuclear Reactor Regulation
References
GQL-1553, NUDOCS 7910240949
Download: ML19210A236 (3)


Text

pao 9 O A*E Cp 9QCLygNT O A YE * *CE.= ED NO r vracPoura EDISON Co.

G->73 9-29-73 soso4 I

LTR ME YO REPOR7 OYaEA

( ro ca.c a

CC OT-Ea NIN (MEE)

ACT,oN NECEssaav 0

co~cuaai~ct O

ca rE ANsnEsEa NO ACTt0N NECESSARY COWVENT C

CL A 55is PCST OF F ICE ev s'LE CCCE REG N3 Of 5CR#7'CN We 6e unciens.8,W REFER.ED TO D A TE RECElv f D 8v LATE DESIGN DEFICIENCY REPORT 4/ J DRExEn f f:_ W-///$/h 1

,h,d. d-M d $-

_E %.. 'SVRE >

. -e& U-

  • t COPIES FOR PDR LPDR NS!C TIC SEh'r TO RECICHAL COORDINATOR

, ;l, i

,.!//. Y5 t

f REVASNS i

CDPT SENT TO REGION I 4

I U S NUCLE AR AEGutATCav COVW55 CN OPY N8C 3265 T. u @mo u'O!iiI !? [

il D

J r

AB of uuu a a a

1476 283 7910240 f

4

.e

&# 'I r;'LJ muexmams i

/

4 9

METROPOLITAN EDISON COMPANY : s omenz.vewucucununesccuenn= l i

/

POST OFFICE BOX 542 READING, PENNSYLVANI A 19603 TELEPHONE 215 - 929-3601 September 29, 1975 GQL 1553

.w ' '..

p r}.m.4f/ ?

g/,%, O. '%

,[',4.A Director Divisien of Reacter Licensing

?

-i U. S. Nuclear Regulatory Cc=issien

/c 1

Washington, D.C.

20555 m6 V

_e ;

seMc&r

'x.

  • e%.g'4

?

p-

Dear Sir:

9 p'

V Docket No. 50-289 e

Operating License No. DPR-50 Three Mile Island Nuclear Statier Unit'l (TMI-1)

Pursuant to our letter of July 11, 1975, please be inf:rmed that as a result of analyses perfor ed on the rip rap of the dikes at TMI, the folleving deficiencies have been identified:

1.

In several areas the rip rap is s-al' - or thinner than criginally specified. To correct this situaticn, additional rip rap of the proper sice vill be placed in these areas.

2.

In one 225-fcot-long area just scuth of the Unit 2 intake structure the existence of a tce can net be verified due to the presence of a thick covering of spoil material.' To provide such verificaticn, a trench will be dug through the speil. If this excavatien reveals the presence of a tee, all spoil material covering the tce vill be re=cved; if it does not, a tce vill be placed.

3 In the area between the two intake structures and in ancther 250 rect-lens area just ncrth of the Unit 1 intake structure a tee prcbably dces not exist. To correct this situation, additicnal, coarse rip rap =aterial vill be placed at the base of the rip rap facing in these two areas to serve as a tee.

h.

In the area between the two intake structures and just ncrth cf the Unit 1 intake structure there is essentially no filter blanket present. This is net considered to represent a sericus situatien in that any a'diticnal d

rip rap which is placed en the facing to restore lost filter volume vill increase the thickness of the facing and thereby decrease the need for a filter; therefore, no attempt vill be made to replace the filter blanket in these areas except by the applicatien of additional rip rap to the dike facing.

T476-284

.J

..,/

x

-3Cb-7

~'

s k

-2 All of the repairs mentioned in items 1 through h above are expected to be ecmpleted by the end of 1975, river ccnditions and other facters per=itting.

In the meantire, a region-by-regien analysis perfor=ed,by cur censultants indicates that the existing rip rap facing of the dike vill be cdequate to withstand design flev velocities and wave heights.

We trust this succittal is adequate; however, should you have any questiens regarding this matter, please do not hesitate to centact =e.

Sincerely,

. /l 1

kI '1 C

lR. C. Arnold Vice President RCA:JFV:tas File:

20.1.1 / 7.7.h.1.1 0

.