ML19210A226
| ML19210A226 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 07/03/1975 |
| From: | Arnold R METROPOLITAN EDISON CO. |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19210A227 | List: |
| References | |
| GQL-1237, NUDOCS 7910240939 | |
| Download: ML19210A226 (2) | |
Text
NRC D RIBUTION FOR PART 50 DOCKF' ATERIAL (TEMPORARY FORM) g CONTROL NO:
I FILE: I!; CIDE!T EEI' ORT 7I':
FROM: Metropolitan Edison Co.
DATE OF DOC DATE REC'D LTR TWX RPT OTHER Reading, Penna.
7-3-75 7-7-71 XXX R.C. Arnold TO:
ORIG CC OTHER SENT AEC PDR EX 1 Signed SENT LOCAL PDR NRC CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
50-2S9 XXXX 1
DESCRIPTION:
ENCLOSURES:
Ltr. trans the following....
Non-Routine 10. Day Report # 75-03,.on 6-26-75, concerning inadvertant. sporadic release of radioactive material occurred while adding wate' to the makeup tank &' the reactor coolant bleed tanks.......
( 1 cy. Encl. Rec'd)
PLANT NAME: Three Mile Island #1 FOR ACTION /INFORMATION vca 7_a.7s BUTLER (L)
SCHWENCER (L) ZIEMANN (L)
REG AN (E)
W/ Copics W/ Copies W/ Copics W/ Copies CLARK (L)
STOLZ (L)
DICKER (E)
/ LEAR (L)
W/ Cooies W/ Copies W/ Cocies WJ/ opics PARR (L)
VASSALLO (L)
KNIGHTON (E)
SPtLS W/ Copies W/ Copies W/ Copics W/ Copies KNIEL (L)
PURPLE (L)
YOUNGBLOOD T)
W/ Copics Y!/ Copics W/ CGpics W/ Copics INTERNAL DISTRIBUTION m,FIL" J TECH REVIEW CENTON LIC ASST A/T IN D.
'NHC PD4 pSCHROEDER jG RIMES R. DIGGS (L)
BRAITi.1Ai!
OGC, ROOM P SOGA #MACCARY GAMMILL H. GEARIN (L)
SALTZMAN f
GOSSICK/ST AF F KNIGHT KASTN E R E. GOU LBOURNE (Li MELTZ CASE PAWLICKl BALLARD P. KREUTZER (E) f GI AM BUSSO SHAO SPANG LE R J. LEE (L)
PLANS BOYD
MCDONALD.
MOORE (L)
- fHOUSTON ENVIRO S. REED (E)
NOVAK MULLER M. SERVICE (L)
DUBE (Lir)
DEYOUNG (L)
'm f
SKOVHOLT (L)
ROSS DICKER S. SHEPPARD (L)
E. COUPE GOLLER (L) (Ltr)
IPPQLITO KNIGHTON M. SLATER (E)
PET E RSON f
f P. CO L LIN S
/TEDESCO YOUNGBLOOD H. SMITH (L)
HARTFIELD (2)
KLECKER DENISE J. COLLI'iS REGAN
/S. TEETS (L)
REG OPR LAIN AS PROJECT LDR G. WILLI AMS (E)
EISENHUT
/ TIT E &, REGION (2)
BENAROYA V. W1LSON (L)
- WIGGINTON p.!4IPC/F3 p)
VOLLMER HAR LEOS R. INGRAM (L)
F. UILL10:s STEELE
- 19 :.up, Ed.IERN AL DISTRIBUTION Ao
,/
U 1 - LOCAL PDR MEMM"[ N ATIONAL LASS pl - TIC (ABERN ATHY) (1)(2)(10 1 - PDR. SAN /L A/NY f
l - NSIC (BUCHAN AN) 1 - W. PENNING ON, Rm E-201 GT 1 - BROOKH AVEN ST LAE 1 - ASLB 1 - CONSULTANTS 1 - G. U L Rl KSO \\'. C R N L f
1 - Newton Anderson NEWM ARK /BLUME/AG B ASI AN 1 - AGM ED (RU TH G L55",' '
Rm 8-127 GT
.4-ACRS SE::T TO LIO 1.SST
- SEND 0 !LY TEN D/J RE?CRTS
/
1 - J. D. RUNKLES. P.m EC' 1476 263 oT
@910240 h 3 7 I
jf27J
(,Q -e n
xnss METROPOLITAN EDISON COMPANY DOCT CFFICE SOX 542 RE ADING, PENNCYLV ANI A 19CC3 TELEPHONE 215 - 929-:60; July 3, 1975 GQ.L 1237
.-r~
,/ ~
/
Director
<J s
Division of Reactor Licensing
['
~
U. S. Nuclear Regulatory Cer:=ission
/
Washingten, D.C.
20555 l--
MY 2,73,
~
Dear Sir:
L
\\
x__'
J' Decket No. 50-289 Operating License No. DFR-50 x m-Nonreutine 10 Day Repcrt 75-03 In accordance with 6.7.2.a.2 of the Technical Specifications for our Three Mile IsAnnd Nuclear Station Unit I (TMI-1) please find enclosed Nenroutine 10-Day Report 75-03 vhich dea's with an unplanned release of radioactive material cecurring on June 26, 1975 We vould like to point cut that none of the limits given in the Technical Specificatiens were exceeded, and no me=ber of the public, station perscnnel or centractor personnel received a radiation dose near the applicable limits given in 10 CFR 20.
We trust that this submittal satisfies the reporting requirements referenced above and ad.equately ansvers any concerns you =ay have.
Sincerely, i
R. C. Arnold Vice President RCA:CWS:tas File:
20.1.1 / 7.7.3.12.1 cc: Office of Inspection and Enforcement, Region 1 Ms. Margaret Reilly, PaDER 1476 204 7129