ML19210A206
| ML19210A206 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/23/1975 |
| From: | Colitz J METROPOLITAN EDISON CO. |
| To: | |
| Shared Package | |
| ML19210A204 | List: |
| References | |
| NUDOCS 7910240924 | |
| Download: ML19210A206 (1) | |
Text
.
7 r..., - :. : -,_,
.s j
_ -. ~ -
.~.
.- 7. c :r
'* l$, $g hKs3 A.t FALt.*l3 i.;ET.O?C LITn N EblSCM CCMPANY suasiou n or acutus. ruauc unuras conrou ncu
/
PCST OFFICE DOX 4S(' M100LETOWN PENNGVLVANIA 17C57 TELEPHONd 717.C44.e:C 11 May 20, 1975 D
, I]i ' -
hO 0,7aQR jjL y.: -
(Mhd///q J
Mr. J. P. O'Refl.ly. Director
~~
- n/
Directorate of acculatory 0;eratiens
- ULL, Pegicn I 631 Perk. Arenne.._ -- _.-.
--mn:n'r=.4nvusMm-Pm-IN00 :--- - -
--- ::=
=u -
^*~*~UpErating UcansrOPR:20*----
Docket 50-289
-Sa's%cta-..P.bnormal occurrence-n>.-M-75-p.
Eaar f!r. O'Coilly:
This telecrata is to ccnfim the telecon between f.ee Spasser.1, Cogian I-!GC.
and J. J. Colitz (T!U " nit 1 Superintendent) at 1435 hours0.0166 days <br />0.399 hours <br />0.00237 weeks <br />5.460175e-4 months <br /> 23 Fay 1975.
The following report is sub:nitted in accordance with paragraph 6.7.2.a.1 (page 6-11) of technical specifications.
On May 23 at 14C0 hcurs tMle running the B Decay !! eat River !!ater Ps::,,
{., CP.-P-ID.), the 1:Mor shcft., sheared above the ccupling.
.The redundSht" pump. CR-P-1A was tested to verify Tperability.
~
An investigation is currently in progress to detonnine the reasca for this failure.
It is presently planced to bring the reactor to c61d shui:dcwn canditions within the time aliced by Tech. S;:ac. 3.3.2 cnd at the sur.2 time proce'.d into our "Ccatrol God Interchange Catage" which was originally planned for P.ay 30, 1975.
Very truly yours, dJoseph J.(/Col 1 t._
Cait 1 Seperintendant Three F.ile Is]cnd JJC:bh 1476 224
'8910240%2