ML19210A161

From kanterella
Jump to navigation Jump to search
Discusses Even Rept 76-17/990 on 760513.Chemical Cleaning Sys Piping May Cause Excessive Stress in Reactor Bldg Penetration During Seismic Event.Caused by Inadequate Support.Tests Show Stress Falls within Limits
ML19210A161
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/26/1976
From: Arnold R
METROPOLITAN EDISON CO.
To: James O'Reilly, Reid R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), Office of Nuclear Reactor Regulation
References
GQL-0778, GQL-778, NUDOCS 7910240886
Download: ML19210A161 (2)


Text

RCronu 105 u.s. NUCLt.An HEGULATOnY Cm'MI53 TON DOCKET NUMnEn

2 7es 50-289 l

' flRC DISTRIBUTION ron PART 50 COCKET MATERIAL

"'ICIYENTREPORT 7t

TO

FROM:

oATE OF DOCUMENT METROPOLITAN ELISON COMPANY 5/26/76 R. W. REID READING, PA.

oATgnsCsivso R. C. ARNOLD 5/28/76 l1.srTan ONorMizzo PaoP INPUT FORM NUMBER OF COPIES RECEtVED i MOnlGINAL

' hNC LASSIFIE D OCoey NOE SIGNED f ossCairrioN ENCLosune LICENSEE EVENT REPORT (R0 50-289/76-17/990)

ON 5/13/76 CONCERNING AN INADEQUATELY SUPPORTED CHEMICAL CLEANING SYSTM PIPING ASSOCIATED WITH REACTOR BUILDING PENETRATION No. 105.

.s t

I I

l PLA :T HAME:

NOTE:

IF PERSONNEL EXPOSURE IS INVOLVED THREE MILE ISLAND #1 (1-P)

SEND DIRECTLY TO KREGER/J. COLLINS SAFETY FOR ACTION /lNFORMATION ENVIRO 6/1/76 RJL I

iX BRA!:CH CHIEF:

REID i

W/3 CYS FOR ACTION l

.X LIC. ASST:

j i

W/ / CYS, INGRAM ACRS /6 CYS HOLDING /SE!!T TO LA IN1 ERNAL DISTRIGUTION i

XTEG FIL O C

.C i

.w

_Y I & E (2)

N MIrc-m

M SCHR03nER/IPPOLITO I

'X HousTg 6

X NOVAK/QUEQK J

%,.SRIMES / SCWENCER [/

69

_J X

CASE j

,HAMTR j

13.TEDESC0/MACCARY JJsimur

_DAER

,_SJ!A0 lOLGERLB_U?{Clt KIlE_Q4j /J. COLLI' S j

d EXTERNAL DISTit!BUTION CONTROL NUT.:l!E R DR: HARRISBURG, PA.

TIC NS'IC s

n 701nede NXe g

[

i 97.....,m. m >..,

~Tip0l0i

h NRC 7Onu (95 U.S. NUCLE AR REGULATORY OMMIGOBON DOCKET NUMOER aaer -

,5 0 - 2. 8 *t NRC DISTRIBUTION FOR PART 50 DOCKET MATERI AL yNCIDE'T REPORT TO: Mr Reid FROM:

OATE OF DOCUMENT Metropolit,an Edison Co 5-76-76 Reading,'Pa R C Arnold DATE RECEIVED

,7, ILETTE UNOTORIZED PRCP 8NPUT FORM NUMBER OF COPIES RECEIVED SORiolN AL E UNC LASSIFIE D OcGev one signed CESCRIPTION EN CLOSU RE Ltr furnishing info concerning an incident which was inadvertently considdred a reportabl e

occurrence on 5-13-76....... and classified as ER 76-17/990......

FLANT NAME:

Three Mile Island #1 NOTE:

IF PERS0tmEL EXPOSURE IS INVOLVED SEND DIRECTLY TO KREGER/J. COLLINS

-- S FETY FOR ACTION /INFORMATION ENVIRO 0-I"/O

  • 1 I

BRANCH CHIEF:

Ret 4 W/3 CYS FOR ACTION LIC.- ASST:

"I h at vem W/I CYS ACRS l(, CYS I"'L 1.,u/SENT TO LA l

I A

INTERNAL DISTRIBUTION I

'RZG FILE ]

_j

'M i

I & E (2)

I MIPC (3)

SCHROEDER/IPPOLITO I

l-HOUSTON I

NOVAK/ CHECK I

GRIMES /Sch"JENCER I

CASE i

P. WTT T TAM 9 HANAUER I

_TEDESCO/MACCARY

~

l EISENHIJr I

_BAER

_SJIAO VO_kLttER/BUtlCJL i

KREGER/J. COLLINS EXTERNAL DISTRIBUTION CONTROL NUMBER LPDR:ikans un fu TIC NSIC 1490 102 m.. _.. _.,...,

I Ac ?;'fg;]

/

ff:..,,

m n a. ~ x an

/

/ METROPOLITAN EDISON COMPANY

c. o n, m u u.

. m :., s o.: m /

i

/

POST OFFICE BOX 542 READING, PENNSYLVANI A 19603 TELEPHONE 215 - 929 3601 GQL 0778

'5 May 26, 1976 Director of Huelear Reactor Regulation S

'4 Attention R. W. Reid, Chief

[Qf,f Branch Ho. k

' p ' Y O c.

U.S. Nuclear Regulatory Cc==1ssion Washington, D.C.

20555 0%

5 Mr. J. P. O'Reilly 7

g Office of Inspection & Enferce=ent, Region 1 U.S. Nuclear Regulatory Co==ission

//

631 Park Avenue Of King of Prussia, PA 19h06 Gentle =en:

Three Mile Island Nuclear Station Unit 1 (ThiI-1)

Docket No. 50-289 Operating License No. DPR-50 Event Report ER 76--17/990 On May 13, 1976, Mr. J. J. Colitz (TMI-1 Unit Superintendent) informed Mr.

Lee Spessard (Region I, URC) of a situation which we felt may have been reportable in accordance with Technical Specification 6.9 2.A.(9).

It was suspected that the Chemical Cleaning System piping associated with Reactor Building Penetration No.105 was inadequately supported and could sub, ject that penetration to excessive stresses during a seismic event.

Seismic and deadload analyses performed by Gilbert Associates, Inc. have shown that stress values vould be well within the code allowables and that no additional supports vould be necessary.

This situation, therefore was not reportable.

.J Sincerely, i

f

/.

A

~

R. C.

old Vice President RCA:JJM:ilm w.

S7ar 1490 103