T // T 7 8 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DISTRIBUTION FOR INCOMING MATERIAL 50-289 REC: REID R W ORG: HERBEIN J G DOCDATE: 05/10/79 NRC METROPOL EDISON DATE RCVD: 05/15/78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED
SUBJECT:
LTR 1 ENCL 0 FURNISHING INFO CONCERNING SUBJECT FACILITY"S DECAY HEAT PUMPS SHAFTS.
ADVISING DURING RECENT TMI-1 REFUELING OUTAGE. APPLICANT REPLACED 7HE PUMPS SHAFTS ON BOTH DH-P1A AND DH-PIB.
PLANT NAME: THREE MILE ISLAND - UNIT 1 REVIEWER INITIAL:
XJM DISTRIBUTOR INITIAL: pq,
- DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ******************
GENERAL DISTRIBUTION FOR AFTER ISSUANCE OF OPERATING LICENSE.
(DISTRIBUTION CODE AOO1)
FOR ACTION:
BR CHIEF RFT"""LTR, NLY(7)
INTERNAL:
FILE **LTR ONL
)
NRC PDR**LTR ONLY(1)
L E**ITo
- . - (2)
OELD**LTR ONLY(1)
HANAUER**LTR ONLY(1)
CHECK **LTR ONLY(1)
EISENHUT**LTR ONLY(1)
SHAO**LTR ONLY(1)
BAER**LTR ONLY(1)
BUTLER **LTR ONLY(1)
EEB**LTR ONLY(1)
J COLLINS **LTR ONLY(1)
J.
MCGOUGH**LTR ONLY(1)
EXTERNAL:
LPDR'S HARRISBURG, PA**LTR ONLY(1)
TIC **LTR ONLY(1)
NSIC**LTR ONLY(1)
ACRS CAT B**LTR ONLY(16) 1489 355 DISTRIBUTION:
LTR 40 ENCL 0 CONTROL NBR:
731320191 SIZE: 1P THE END 7910240 b
[
u/.w.r.r
" "
- N *t,%.. o I (( u c W v_:
'TP1
- e*
, 12 v'
, Scc e
g*Il 4
e W.TL a 8
METROPOLI T AN EDISON COMPANY POST OFFICE SOX 542 READING, PENNSYLVANI A 19603 TELEPHONE 215 - 929 4601 May 10,1978 4,..
GQL 0858
' 6kN ,-
7 kg% Oc.)
,; >.y "ct,f:7 v P
w
'Qi
- ) U r
~
~-
m Directcr of "uclear Reactor Regulation.:
,N #
[k h cq h Attn:
R. W. Reid, Chief Operating Reactors Branch ';o. 4 s
/d/
U. S. Nuclear Regulatary Cc==ission jX Washington, D. C.
20555 QF
Dear Sir:
Three Mile Island Nuclear Station, Unit 1 (D1I-1)
Operating License No. DPR-50 Docket No. 50-289 Decay Heat Pump Shafts This letter is to inform you that during the recent TMI-l refueling cutage, Met-Ed replaced the pump shafts on both DH-Pl.A and DH-P13.
The replacement shafts have rounded keyvays and the appropriate material certification and heat treatment documentaticr.. Both pumps have success-fully passed their post-maintenance Inservice Inspection Tests and are fully operational and running s cethly.
In view of having replaced the pump shafts, Met-Ed feels that there is no remaining cc==itment to perform periodic ultrasonic testing and vibratien measurements, and as such, Met-Ed intends to do only the testing recuired by ASME Section XI.
Sincerely,
/
\\
/
/
/
,'J.
G. Hertein
/ Vice President-Generation JGH:RJS:dkf 1489 356 p\\
.3tre191 1
tho