n)#-o,H
/M c 4, Federal Register Notice NUCLEAR REGULATORY CCEMISSION ADVISORY CCNMITTEE ON REACTOR SAFEGUARDS Notice of Proposed Meetings In order to provide advance information regardirg proposed meetings of the ACRS Subcomittees and Working Groups, and of the full Comittee, the following preliminary schedule reflects the current situation, taking into account additional meetings which have been scheduled and meetings which have been postponed or cancelled since the last list of proposed meetings published April 20,1979 (44 FR 23609). hose meetings which are definitely scheduled have had, or will have, an individual notice p2blished in the Federal Register approximately 15 days (or more) prior to the meeting.
Those Subcomittee and Working Group meetings for which it is anticipated that there wul be a portion or all of the meeting open to the public are indicated by an asterisk (*).
It is expected that the sessions of the full Comittee meeting designated by an asterisk (*) will be open in whole or in part to the public. ACRS full Comittee meetings begin at 8:30 a.m. and Subcomittee end Working Group meetings usually begin at 8:30 a.m.
We exact time when items listed on the agenda will be discussed during full Comittee meetings and when Subcommittee and Working Group meetings will start will be published prior to each meeting.
Information as to whether a meeting has been fir 1Ly scheduled, cancelled, or rescheduled, or whether changes have been made in the agenda for the June 1979 ACRS full Committee meeting can be obtained by a prepaid telephone call to the Office of the Executive Director of the Comittee (telephone 202/634-3267, ATIN:
Mary E.
Vanderholt) between 8:15 a.m. ard 5:00 p.m., EI7r.
74 Qy 791019044S
t
. SUBCCNMITTEE AND WORKING GROUP MEETINGS
- Safeguards *nd Security, May 23, 1979, Washington, DC.
'Ihe Subcomittee will discuss recat safe 3ua.
v 3, advice from its consultants and the 1979 Review and Evalt9 tion of the NRC Safety Research Program. Notice of this m e ing wzJ publ'
.M May 11.
- Evaluation of Licensee Event Reports, May 24-25, 1979, Washington, DC.
The Subcomittee will continue its study of Licensee E" nt Reports.
Notice of this meeting was pub.'ished May 11.
- Combination of Dynamic Loads, May 30, 1979, Washington, DC.
POSTPONED INDEFINITELY.
- Reliability and Probabilistic Assessment, May 31-June 1,1979, Los Angeles,' CA.
RESCHEDULED 'IU JUNE 2,1979, WASHINGTON, DC.
- Implications of the Three Mile Island, Unit 2 Accident, May 31-June 1, 1979, Washington, DC.
'Ihe Ad Hoc Subcomittee will continue its review of the accident which occurred at this Station on March 28, 1979 and will consider long-term implications of the accident on nuclear power plant design. Notice of this meeting was published May 16.
- Reliability and Probabilistic Assessment, June 2, 1979, Washington, DC.
The Subcomittee will discuss detailed procedures to ensure the proper and effective use of risk assessment theory, methods, data development and statistical analyses by the Staff; also, the 1979 Review and Evaluation of the NRC Safety Research Program. As time penaits, the Subcommittee will discuss the reliability of BWR (boiling water reactor) piping Vith regard to the frequency of appearance of stress corrosion crackirg.
1174 038
. *Three Mile Island Nuclear Station, Unit 2, June 6-7, 1979, Middletown, PA.
We Subcommittee will meet with representatives of the NRC Staff and the Metropolitan Edison Company, et al, to discuss details of the March 28, 1979 accident at this Station.
- Reactor Fuel, June 11-12, 1979, Washington, DC.
h e Subcommittee will discuss the current and proposed NRC research programs in the area of fuel behavior for ccasideration of a report to Congress on NRC research.
- Operating Reactors, June 13, 1979, Washington, Ir. We Subcommittee will review a request for a pwer level increase at the Millstone Nuclear Power Station, Unit 2, and will discuss the 1979 Review and Evaluation of r.ne NRC Safety Research Program.
- Regulatory Activities, June 13, 1979, Washington, DC.
The Subcommittee will review proposed regulatory guides and revisions to existing regulatory guides; also, it may discuss pertinent activities which affect the current licensing process and/or reactor operation.
- Emergency Core Cooling Systems (ECCS), June 19-20, 1979, Washington, DC.
The Subcommittee will review ECCS nodels for small breaks in Babcock and Wilcox reactor systems. We Subcommittee will also review the proposed FY-81 NRC budget figures for ECCS-related research activies.
- Improved Safety Systems, June 26, 1979, Washington, DC.
We Subcommittee will discuss with representatives of the NRC Staff and the Department of Energy (DOE) their plans for research on improved safety systems and expected changes in these programs due to the March 28, 1979 Three Mile Island, Unit 2 Accident.
e 117.;
039
,
- Floating Nuclear Plant, June 27, 1979, Washington, DC.
The Subcommittee will continue its review of the Offshore Power Systems' application for a manufacturing license for the Floating Nuclear Plant. 'lhe specific topic of this meeting will be the review of the core catcher concept using magnesium oxide bricks.
- Radiological Effects and Site Evaluation, June 27, 1979, Washington, DC.
The Subconnittee will n.2et with representatives of the NRC Staff and invited speakers from outside NRC to discuss changes in the NRC research program bttiget in the areas of radiological effects and site evaluation.
Other topics related to radiologicai effects and site evaluation may also be discussed.-
- Evaluation of Licensee Event Reports, June 28-29 and July19, 1979, Washington, DC.
We Subcommittee will continue its study of Licensee Event Reports.
- La Crosse Nuclear Power Plant, June 30, 1979, Washington, DC. Se Subcom-mittee will discuss with representatives of the NRC Staff and the licensee the overall condition of the reactor, and the status of the NRC systematic evaluation of this plant.
- Reactor Safety Research, July 10, 1979, Washington, DC.
"Ihe Subcommittee will discuss reactor safety research and will prepare a draft report to the full Comittee on the proposed EY-80 research budget.
Metal Components, July 10-11, 1979, Washington, DC.
We Subcommittee will discust recent events concerning safety / relief valve reliability and the Review and Evaluation of the NRC Safety Research Program.
I174 040
,.
- Regulatory Activicies, July 11, 1979, Washington, DC he Subcommittee will review proposed regulatory guides and revisions to existing regulatory guides; also, it may discuss pertinent activities which affect the current licensing process and/or reactor operation.
- Evaluation of Licensee Event Reports, July 19, 1979, Washington, DC.
he Subcomittee will continue its study of Licensee Event Reports.
Interim Report: Additional meetings of ACRS subcomittees may be scheduled during this period to begi.i review of topics identified as a result of the March 28,1979 2ree Mile Island, Unit 2 Accident.
ACRS EULL CCM41TTEE MEETINGS June 14-15, 1979 A.
- Three Mile Island Nuclear Station, Unit 2:
Evaluation of the March 28, 1979 Accident.
B.
- Millstone Nuclear Power Station, Unit 2:
Proposed power level increase review.
C.
- Sequoyah Nuclear Plant: Operating License review.
D.
- Palo Verde Nuclear Generatinc Station, Units 4 and 5: Construction Permit review.
E.
- Review of recent nuclear power plant operating experience and licensing actions.
F.
- Review stress corrosion cracking in nuclear power p; systems.
G.
- Review proposed design criteria for spent fuel storage facilities.
H.
- Review proposed procedures for emergency planning associated with nuclear facilities.
I.
- Review reactor fuel element cladding materials.
1174 041
. July 12-14, 1979 - Agenda to be annouonced.
August 9-11, 1979 - Agenda to be announced.
Date c2[,/f7%
[JohnC.H g
Advisory Comittee Management Officer 1174 047