ML19209D125

From kanterella
Jump to navigation Jump to search
Forwards Final Deficiency Rept Re Faulty Welding by Lakeside Bridge & Steel on Drywell Vent Structure & Reactor Pressure Vessel Pedestal
Date released: 08/11/2019 Download: ML19209D125


Final Deficiency Rept Re Faulty Welding by Lakeside Bridge & Steel on Drywell Structure & Reactor Pressure Vessel Pedestal.Caused by Unacceptable Work as Result of Insufficient Nondestructive Exam
ML19209D133
Person / Time
Site: Hartsville 
Issue date: 10/01/1979
From:
TENNESSEE VALLEY AUTHORITY
To:
References
Download: ML19209D133 (4)
Forwards Final Deficiency Rept Re Faulty Welding by Lakeside Bridge & Steel on Drywell Vent Structure & Reactor Pressure Vessel Pedestal
ML19209D124
Person / Time
Site: Hartsville 
Issue date: 10/01/1979
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19209D124 (1)