ML19209C995

From kanterella
Jump to navigation Jump to search
Notice of Issuance & Availability of Amend 21 to License NPF-3
ML19209C995
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/02/1979
From: Reid R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19209C991 List:
References
NUDOCS 7910180561
Download: ML19209C995 (2)


Text

--

UtiITED STATES NUCLEAR REGULATORY COMMISSION DOCKET N0. 50-346 THE TOLED0 EUISON COMPANY p

AND THE CLEVELAND ELECTRIC ILLUMINATING COMPAN-Y NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Commissicn (the Commis_ ion) has issued Amendmem. No. 21 to Facility Operating License No. NPF-3, issued to The Toledo Edison Company and The Cleveland Electric Illuminating Company (the licensees), which revised Technical Specifications for operation of the Cavis-Eesse Nuclear Power Station, Unit No. i (the facility) located in Ottawa County, Ohio.

The mnoent is effective as of its date of issuance.

The amendment changes the Technica. Specificaticns by (1) extension of the calendar time to perform the first inservice inspecticns (ISI) of steam generator tubes after initial criticality, (2) special provisions for certain categorization of degraded and/or defective steam generator tubes in various defined groups, and (3) inspection interval requirements based on the categorization of the results of inspections of steam generator tubes.

The acclication for the amene.nen: complies with the stancards and

-ecui ements of :.e At:mic Energy Act of 1954, as amencec (the Act), and ne 2rmission's rules and regulations.

The C:mmission has mace a:propriate

" cings as ecuirec y ne Ac and the C:mmission's rules anc regulations in

. :~: Cha::er I, wnicn are set for:n in One license amencment.

3rior public

i:e :f :nis arencmen; was c; recuicec since :ne amer.c en: cces not

"- < ve a significan: c.a:ar:s ::nsiceration.

177 M9 7910180 A

1 t

The Ccmission has determined that the issuance of this amendment w'll not result in any significant environmental impact and that pursuant to 10 CFR 5 51.5(d)(4) an envircnmental impact statement or negative declaration and environmental impact appraisal need not be prepared in ccnnecticn with issuance of this amendment.

For further details with respect to this action, see (1) the application for amendment dated July 27, 1979, as supplemented August 17,1979, (2) Amend-ment No. 21 to License No. NPF-3, and (3) the Cermli:sion's related Safety Evaluation.

All of these items are available for public inspection at the Commission's Puolic Document Rcom,1717 H Street, N. W., Washington, D. C. and at the Ida Rupp Public Library, 310 Madisen Street, Port Clinton, Ohio.

A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D. C. 20555, Attention:

Director, Division of Operating Reactors.

Dated at Bethesca, Maryland, -his 2nd day of October 1979.

FOR THE NUCLEAR REGULATORY COMMISSION I

4 Robert W. Reid, Chief Operating Reactors Branch #4 Divisien of Operating Reactors tl77 170