ML19209C665
| ML19209C665 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 10/12/1979 |
| From: | Bramlett L ARKANSAS POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML19209C661 | List: |
| References | |
| NUDOCS 7910170195 | |
| Download: ML19209C665 (6) | |
Text
.
s AVER AGE D ALLY UNIT POhER LEVEL DOCKET NO.
50-313 esiy ANO-Unit 1 DATE 10/12/79 COMPLETED BY L.S. Bramlett TELEPHONE 501/968-2519 MONTH September, 1979 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) iMWe Nett i
824 828 i;
823 is 829 3
822 19 825 4
820 20 825 5
820 827 6
021 22 822 821 7
23 822 g
822
,4 824 9
822
- s 823 to 823 26 825 822 825 i,
823 827 3
i3 823 826 29 826
,4 39 826 33 828 flA 3;
16 020 INSTRUCTIONS On this format. hst the ascra;;c J:!> unit,iimer lesel in MWe Net for cuh day m the reporting m.. nth. Compute to the nearest whole meyxatt.
(Lil77 )
1i48 277 7910170 [ f
OPERATING DATA REPORT DOCKET NO.
50-313 DATE 10/12/7 COMPLETED BY L.S.
Bramlett TELEPHONE 501/968-2519 OPERATING STATUS N
- 1. Unit Name:
Arkansas Nuclear Ona - Uni + 1 September 1-30, 1979
- 2. Reporting Period:
- 3. Licensed Thermal Power 1MW :
2.568 902.74
- 4. Nameplate Rating IGross MWe):
850
- 5. Design Electrical Rating (Net MWep:
883
- 6. Maximum Dependable Capacity (Gross MWe):
836 7 Masimum Dependable Capacity (Net Mhe):
- 5. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:
None
- 9. Power Les el To %hich Restricted. lf Any (Net MWe):
None NA
- 10. Reasons For Restrictions. If Any:
This Month Yr..to.Date Cumulatise 720.0 6551.0 41922.0 i1. Hours In Reportmg Period
- 12. Number Of Hour, Reactor Was Critical 720.0 2953.1 28663.2 0.0 1969.7 3959.6
- 13. Reactor Resene Shutdown Hours 720.0 2795.7 28009.4
- 14. Hours Generator On.Line
- 15. Unit Resene Shutdown Hours 0.0
_ 6809325.0 67616034.0 591.5 796.7 1842093.0
- 16. Gross Thermal Energy Generated (Mh H, 17 Gross Electrical Energy Generated (MWHI 620212.0 92macg2 0 9949g43_o IS. Net Electrical Energy Generated IMWHi 593355.0 2151836.0 21462382.0 100.0 42.7 66.8
- 19. Unit Senice Factor 100.0 51.7 68.7
- 20. Unit bailability Factor
~
61.2 98.6 39.3
- 21. Unit Capacity Factor (Using MDC Net s 97.0 38.6 60.2
- 22. Ln.t Capacity Factor (Using DER Nets 0.0 45.8 16.3
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Months tType. Date.and Duration of Eachi:
None NA
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status iPrior to Commercial Operationi:
Forecast Achiesed INITI A L CRITICA LITY INITI \\ L ELECTRICITY COMMERCIAL OPER ATION 1148 278 t., m,
REFUELING INFORMATION l.
Name of facility.
Arkansas Nuclear One - Unit 1 2.
Scheduled date for next refueling shutdown.
11/01/1980 3.
Scheduled date for restart following refueling. 01/01/1981 4.
Will refueling or resu=ption of operation thereafter require a technical specification change or other license a=endment?
If answer is yes, what, in general, will these be?
If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Coc=ittee to deter =Ine whether any unreviewed safety questions are associated with the core reload (Ref.10 CFR Section 50.59)?
Yes. Peload Recort and associated crecosad Tachnical Ceacification Changes.
5.
Scheduled date(s) for submitting proposed licensing action and supporting infor=ation.
09/01/1980 6.
I=portant licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or perfor=ance analysis methods, significant changes ir. fuel design, new operating procedures.
Will reload 72 fresh fuel assemblies and operate for acoroximately 16 months.
7.
The nu=ber of fuel asse=blies (a) in the tore and (b) in the spent fuel storage pool, a) 177 b) 176 8.
The present-licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in nu=ber of fuel asse=blies.
present 590 increase size by 0
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity.
DATE:
March, 1988 1148 279
M la oo M.-
u
~
e
. < - =
g
-=-
-,c
=~M.
=.
n<
C' c
...: = -
.s 2
==
=
_m-m o.
}
- 5. 7 " =_ z
- =
"i,45
..., =. =. =.
4 c
. =.
=-
3 <= =
m-
/
=L
_=-
-=
_x z c,
s.
.- -=
=
=-
T
/.
Z
_=_
,
.:,i J d
l'RIs0d!!!OJ h(T-3 g
.,s.x a--
a s
l
~~ =-
.c
=
E
= -
7==5 g
- = =
=
.S u.
..* a 5, j 2-_."."
.9.
9 =
~w, O
V:
1 4-e.
I z<
z_
=
z
,. - =
= -
-s
=
.s r.t, s.
=
=
=
=
e.
......,, s., _a
.MillD tjh*
"1
=
u
.=,.
[O "O !J.1.' f *'
=.
si
=
.=
. tlos r.ig
- g u
. e =
s
=4
~
=
- ~
9 _
3, "J - 3,
-. =. =
. =.. _ _.. =.,. =.
n m..
)
. - - = -
.s
=
U Ol [!* In.
= = = = = m-
.r...=,=3
~
=m
====--
s,, m. n. _ m=
..4g %,
e.
,..w w
w
-cx::
c::s ex::
i 1148 280 c:a a
C I
?4 C1 i5 x
Z E
w
NRC MONTHLY OPERATING REPORT OPERATING
SUMMARY
- SEPTEMBER, 1979 The unit operated normally at 1007. reactor pcwer for the entire month.
1148 281
ARXANSAS NUCLEAR ONE - UNIT I Periodic Core Power Distribution Comparison A Radial Power Distribution ccrnparison was perfomed at 33.5 EFPD. The RMS (root mean square) of the differences between measured and predicted at the 52 instrumented fuel assembly locations was 0.0299 which is well within the acceptance criterion of 0.073.
li48 282