Responds to IE Bulletin 79-18 Re Plant Emergency Alarm. Nine Addl Speakers & One Addl Speaker Amplifier Were Installed.Testing Indicated Alarm to Be Audible in All Locations Having Audibility Problems
ML19209C513
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 09/10/1979
From: Swart F
PUBLIC SERVICE CO. OF COLORADO
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
P-79204, NUDOCS 7910160047
Download: ML19209C513 (1)


Text

7/C

, mm$

Public Service Company

  • CeDoratite 1J%

a?

a, C)

September 10, 1979 Fort St. Vrain Unit flo.1 P-79204-Mr. Karl V. Seyfrit, Director

(

j Region IV Office of Inspection & Enforcement fluclear Regulatory Commission 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76011

Reference:

IE Bulletin 79-18 Gentlemen:

In 1978 it was detemined that the plant emergency alarm could not be heard at some locations within the plant and on the plant site due to high background noise or proximity to the speakers.

A fomal investigation to identify these areas was completed in August,1978.

As a direct result of the study, nine (9) additional speakers and one (1) additional speaker amplifier were installed.

Subsequent, testing indicated the alarm to be audible in all locations previously identified as having audibility problems.

The plant emergency alarm system is tested weekly to assure its operability.

We consider this letter fulfills the reporting requirements of IE Bulletin 79-18 and that no further action is required.

Very truly yours, j

I Frederic E. Swart fluclear Project Manager FES:pa cc: