Responds to NRC 790822 Request for Addl Info to Complete Review of Proposed Change 80 Re ECCS Surveillance.Cannot Provide Info within 45-day Time Frame
ML19209C428
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 10/03/1979
From: Moody D
VERMONT YANKEE NUCLEAR POWER CORP.
To: Ippolito T
Office of Nuclear Reactor Regulation
References
WVY-79-116, NUDOCS 7910150556
Download: ML19209C428 (1)


Text

.

. VERMONT Y AN KEE NUCLEAR POWER CORPOR ATION SEVEN TY SEVEN GROVE STREET RUTLAND, VERS 10NT 05701 WVY 79 116 REPLY TO:

ENGINEERING OFFICE TURNPlKE RO AD WESTDORO. M ASS ACHUSETTS 01581 TELEPHONE 417-3 4 4 90 t l

. October 3, 1979 United States Nuclear Regulatory Commission Washington, DC 20535 Attention: Thomas A. Ippolito, Chief Operating Reactors Branch #3 Division of Operating Reactors

References:

(a) License No. DPR-28 (Docket No. 50-271)

(b) VYNPC Letter to USNRC (WVY 79-63) dated thy 18, 1979; Proposed Change No. 80, ECCS Surveillance (c) USNRC Letter to YAEC dated August 22, 1979

Dear Sir:

Subject:

Proposed Change No. 80, ECCS Surveillance By letter, Reference (c), it was identified that your staff needed additional information in order to complete their review of Reference (b). Although we continue to feel strongly that the proposed surveil-lance flaquency changes represent an increase in safety, we are unable to provide the information within the 45-day time frame required by your letter. As soon as we have established a schedule for submitting the requested information, your office will be notified.

Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION

  • % 1.N# _c t D. E. Moody Manager of Operations RJW/sec 1145 048' 7010150 F 57