ML19209C272

From kanterella
Jump to navigation Jump to search
Requests 90-day Extension of Certificate of Compliance 9022 to Allow Preparation of Consolidated Renewal Application
ML19209C272
Person / Time
Site: 07109022
Issue date: 09/20/1979
From: Bakevich G
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
To: Macdonald C
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 7910120316
Download: ML19209C272 (1)


Text

PDb 9/-9022-l C-E Power Systems Tel. 203/688 19! 1

.._ h Combustion Engineenng. Inc.

Telex: 99297 -

1000 Prospect Hill f'oad Windsor Connecticut 06095

~

Fu -

POWER Emu SYSTEMS 7 E. 21 :; 2R y

-n;5h,y;g...

License SNM-1067 September 20, 1979 Docket 71-9022 U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention: Mr. Charles E. MacDonald, Chief Transportation Branch Division of Fuel Cycle & Material Safety Gentlemen:

Our Certificate of Compliance No. 9022 which authorizes delivery of the Model CE 250-2 shipping container to a carrier for transport expires on October 31, 1979.

We are presently in the process of preparing a consolidated renewal application.

i Sinct much of the material required was previously referenced in other licenses, (particularly the Westinghouse License SNM-337), this information must be veri-I fied for accuracy and presented in the format required by present regulations.

This is taking more time than previously expected.

To confirm my telephone conversation with Mr. D. Odegarrden of your staff, it is requested that Combustion Engineering, Inc., be granted a 90-day extension of Certificate No. 9022 to facilitate con.olidation of the above material. We will make every effort to complete our renewal application so it will reach your office no later than December 15, 1979.

'/ery truly yours, l

$-h.

G. J. Bakevich Supervisor, Nuclear Licensing & Safety Nuclear Fuel Manufacturing-Windsor GJB/ssb p t>

@d m

0 14207 7 0101208/d F

,,m,,

_m o

z

..